Laserfiche WebLink
HCM 6th TWSC Background plus Project Conditions <br /> 2: 1-5 NB Off Ramp & Roth Rd Timing Pian:PM Peak <br /> Intersection <br /> Int Delay,slveh 4.2 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SST SBR <br /> Lane Configurations I tt T *T ?f <br /> Traffic Vol,vehlh 76 349 0 0 265 380 73 5 197 0 0 0 <br /> Future Vol,vehlh 76 349 0 0 265 380 73 5 197 0 0 0 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized - - None - - None - - None None <br /> Storage Length 0 - - - 630 - 0 - <br /> Veh in Median Storage,# - 0 0 - 0 - 16965 <br /> Grade,% - 0 - 0 - 0 - 0 <br /> Peak Hour Factor 89 89 89 95 95 95 88 88 88 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 85 392 0 0 279 400 83 6 224 0 0 0 <br /> MajorlMinor Majorl Major2 Minorl <br /> Conflicting Flow All 679 0 - 0 1041 1241 196 <br /> Stage 1 - - - - 562 562 - <br /> Stage 2 - 479 679 - <br /> Critical Hdwy 4.13 - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - 5.43 5.53 - <br /> Follow-up Hdwy 2.219 - 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 911 0 0 240 174 813 <br /> Stage 1 - 0 0 535 509 - <br /> Stage 2 - 0 0 622 450 - <br /> Platoon blocked, % - <br /> Mov Cap-1 Maneuver 911 - - - 218 - 0 813 <br /> Mov Cap-2 Maneuver - 218 0 - <br /> Stage 1 - - 485 0 - <br /> Stage 2 622 0 - <br /> Approach EB WB NB <br /> HCM Control Delay,s 1.7 0 17.1 <br /> HCM LOS C <br /> Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBT WBR <br /> Capacity(vehlh) 218 813 911 - <br /> HCM Lane VIC Ratio 0.407 0.275 0.094 - <br /> HCM Control Delay(s) 32.4 11.1 9.4 - <br /> HCM Lane LOS D B A - <br /> HCM 95th%tile Q(veh) 1.8 1.1 0.3 - <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />