Laserfiche WebLink
HCM 6th Signalized Intersection Summary Background plus Project Conditions <br /> 1: S Harlan Rd & Roth Rd Timing Plan: PM Peak <br /> * <br /> Movement EBL BBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations t r 1�- *T r 4 <br /> Traffic Volume(vehlh) 76 320 150 48 374 65 206 59 86 62 53 65 <br /> Future Volume(vehlh) 76 320 150 48 374 65 206 59 86 62 53 65 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-BikeAdj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlhlln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,vehlh 80 337 158 54 420 73 219 63 91 67 58 71 <br /> Peak Hour Factor 0.95 0,95 0.95 0.89 0.89 0.89 0.94 0.94 0.94 0.92 0.92 0.92 <br /> Percent Heavy Veh,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,vehlh 103 596 505 82 476 83 267 77 303 85 73 90 <br /> Arrive On Green 0.06 0.32 0.32 0.05 0.31 0.31 0.19 0.19 0.19 0.14 0.14 0.14 <br /> Sat Flow,vehlh 1781 1870 1585 1781 1552 270 1398 402 1585 591 511 626 <br /> Grp Volume(v),vehlh 80 337 158 54 0 493 282 0 91 196 0 0 <br /> Grp Sat Flow(s),vehlhlln 1781 1870 1585 1781 0 1822 1800 0 1585 1728 0 0 <br /> Q Serve(g_s),s 3.2 10.7 5.4 2.1 0.0 18.4 10.8 0.0 3.5 7.9 0.0 0.0 <br /> Cycle Q Clear(g_c),s 3.2 10.7 5.4 2.1 0.0 18,4 10.8 0.0 3.5 7.9 0,0 0.0 <br /> Prop In Lane 1.00 1.00 1.00 0.15 0.78 1.00 0.34 0,36 <br /> Lane Grp Cap(c),vehlh 103 596 505 82 0 558 344 0 303 247 0 0 <br /> V/C Ratio(X) 0.77 0.57 0.31 0.66 0.00 0.88 0.82 0.00 0.30 0,79 0,00 0.00 <br /> Avail Cap(c_a),vehlh 333 773 655 259 0 676 683 0 602 777 0 0 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1,00 0.00 1.00 1.00 0.00 0,00 <br /> Uniform Delay(d),slveh 33.3 20.3 18.5 33.6 0.0 23.6 27,8 0.0 24.9 29.7 0.0 0.0 <br /> Incr Delay(d2),slveh 4.6 0.8 0.4 3.3 0.0 11.5 1.9 0.0 0.2 2.2 0.0 0.0 <br /> Initial Q Delay(d3),slveh 0.0 0.0 OA 0.0 0.0 0.0 0.0 0.0 OA 0,0 0.0 0.0 <br /> %ile BackOfQ(50%),vehlln 1.4 4.3 1.8 0.9 0.0 8,8 4.4 0.0 1.2 3.1 0.0 0.0 <br /> Unsig. Movement Delay,slveh <br /> LnGrp Delay(d),slveh 37.9 21.1 18.8 37.0 0.0 35.1 29.7 0.0 25.1 31.9 0.0 0.0 <br /> LnGrp LOS D C B D A D C A C C A _ A <br /> Approach Vol,vehlh 575 547 373 196 <br /> Approach Delay,slveh 22.8 35.3 28.6 31.9 <br /> Approach LOS C D C C <br /> Timer-Assigned Phs 1 2 4 5 6 8 <br /> Phs Duration(G+Y+Rc),s 8.8 27.4 19.5 7.9 28.2 16.1 <br /> Change Period(Y+Rc),s 4.6 5.4 5.8 4.6 5.4 5.8 <br /> Max Green Setting(Gmax),s 13.4 26.6 27.2 10.4 29,6 32,2 <br /> Max Q Clear Time(g_c+I1),s 5.2 20.4 12.8 4.1 12.7 9.9 <br /> Green Ext Time(p-c),s OA 1.5 0.9 0.0 2.2 0.6 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 29.2 <br /> HCM 6th LOS C <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />