Laserfiche WebLink
HCM 6th TWSC Cumulative plus Project Conditions <br /> 3- Roth Rd & 1-5 SB Off Ramp Timing Plan:AM Peak <br /> Intersection <br /> Int Delay,slveh 16.1 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations T+ ) tt ) 4* <br /> Traffic Vol,vehlh 0 148 39 200 115 0 0 0 0 314 6 69 <br /> Future Vol,vehlh 0 148 39 200 115 0 0 0 0 314 6 69 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized None - None - None - None <br /> Storage Length 0 0 520 <br /> Veh in Median Storage,# 0 - 0 16974 - 0 - <br /> Grade,% 0 - 0 0 - 0 - <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 161 42 217 125 0 0 0 0 341 7 75 <br /> Major/Minor Majorl Major2 - Minor2 <br /> Conflicting Flow All 0 0 203 0 0 741 762 63 <br /> Stage 1 - - - - - - 559 559 - <br /> Stage 2 - - 182 203 - <br /> Critical Hdwy - 4.13 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - 5.43 5.53 - <br /> Follow-up Hdwy - 2.219 3,519 4,019 3.319 <br /> Pot Cap-1 Maneuver 0 1367 0 367 334 989 <br /> Stage 1 0 - 0 537 510 - <br /> Stage 2 0 - _ 0 849 733 - <br /> Platooh blocked,% <br /> Mov Cap-1 Maneuver - 1367 - - -309 0 989 <br /> Mov Cap-2 Maneuver - - -309 0 - <br /> Stage 1 - - - 537 0 - <br /> Stage 2 714 0 <br /> Approach EB WB SB <br /> HCM Control Delay,s 0 5.2 32,7 <br /> HCM LOS D <br /> Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2 <br /> Capacity(vehlh) - 1367 309 425 T <br /> HCM Lane VIC Ratio - 0.159 0.736 0.46 <br /> HCM Control Delay(s) 8.1 - 43.2 20.5 <br /> HCM Lane LOS - A E C <br /> HCM 95th%tile Q(veh) - 0.6 - 5,5 2,4 <br /> Notes <br /> --:Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined :All major volume in platoon <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 3 <br />