Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> equipment, cranes, and tractors shall be California Air Resources Board (CARB) Tier 4 <br /> Certified as set forth in Section 2423 of Title 13 of the California Code of <br /> Regulations, and Part 89 of Title 40 of the Code of Federal Regulations. <br /> ■ All construction equipment shall be maintained and properly tuned in accordance <br /> with manufacturers' specifications. Equipment maintenance records shall be kept <br /> on-site and made available upon request by the SJVAPCD or the County. <br /> ■ The Project applicant shall comply with all applicable SJVAPCD rules and regulations. <br /> Copies of any applicable air quality permits and/or monitoring plans shall be <br /> provided to the County. <br /> Timing/Implementation: During the construction period <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> 4.5-2b: Prepare Air Impact Assessment to Reduce Operational NOx Emissions <br /> In accordance with SJVAPCD Rule 9510, a detailed air impact assessment shall be <br /> prepared detailing the operational characteristics associated with the Proposed Project. In <br /> accordance with this rule, operational emissions of NO,, shall be reduced by a minimum of <br /> 33.3 percent and operational emissions of PMio must be reduced by a minimum of 50 <br /> percent over a period of ten years. (Emissions reductions are in comparison to the <br /> Project's operational baseline emissions presented in Table 4.5-6.) The Project would <br /> demonstrate compliance with Rule 9510, including payment of all applicable fees, before <br /> issuance of the first building permit. <br /> Based on the findings of the air impact assessment, the applicant shall pay the SJVAPCD a <br /> monetary sum necessary to offset the required operational emissions that are not <br /> reduced by the emission reduction measures contained in the air impact assessment.The <br /> quantity of operational emissions that need to be offset will be calculated in accordance <br /> with the methodologies identified in Rule 9510, Indirect Source Review, and approved by <br /> the SJVAPCD. Operational emissions reduction methods will be selected under the <br /> direction of the SJVAPCD according to the air impact assessment process detailed in, and <br /> required by Rule 9510, Indirect Source Review (see Rule 9510, subsection 5). <br /> Timing/Implementation: Prior to the issuance of building permits <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> Impact 4.5-3: Construction and operation of the proposed project could result in exposure of <br /> sensitive receptors to project emissions. <br /> Impact Determination: less than significant <br /> Threshold: Exposure of sensitive receptors to substantial pollutant concentrations. <br /> Air Quality 4.5-20 October 2021 <br />