Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> ■ If individual western pond turtles are found during the preconstruction survey, a <br /> qualified biologist with a CDFW Scientific Collecting Permit shall relocate the <br /> individuals, with the concurrence of CDFW, to a site with suitable habitat. Relocation <br /> methods shall be approved by CDFW. <br /> Timing/Implementation: Prior to construction ground disturbance <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> 4.6-1e: Protect Water Quality and Minimize Sedimentation Runoff to Non-Wetland Waters <br /> (Woodbridge Irrigation Canal). <br /> Project construction shall comply with all construction site BMPs specified in the Storm <br /> Water Pollution Prevention Plan, and any other permit conditions to minimize the <br /> introduction of construction-related contaminants and mobilization of sediment to non- <br /> wetland waters in and adjacent to the project area.These BMPs will address soil <br /> stabilization, sediment control, wind erosion control,vehicle tracking control, non- <br /> stormwater management, and waste management practices. The BMPs will be based on <br /> the best conventional and best available technology. <br /> Timing/Implementation: Prior to and during construction <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> 4.6-1f: Giant Garter Snake. <br /> Prior to ground disturbance within 200 feet of the Woodbridge Irrigation District canal, <br /> consistent with the SJMSCP, the following actions shall be implemented to avoid <br /> potential impacts to giant garter snake: <br /> ■ Construction shall occur during the active period for the snake, between May 1 and <br /> October 1. SJCOG, with concurrence of the permitting Agencies, shall determine if <br /> additional measures are necessary to minimize and avoid take for construction <br /> between October 2 and April 30. <br /> ■ Limit vegetation clearing within 200 feet of the banks of the Woodbridge Irrigation <br /> District canal to the minimum necessary. <br /> ■ Where feasible, confine movement of heavy equipment within 200 feet of the banks <br /> of the Woodbridge Irrigation District canal to existing farm roads to minimize habitat <br /> disturbance. <br /> ■ Prior to ground disturbance, all onsite construction personnel shall be given <br /> instruction regarding the presence of SJMSCP Covered Species and the importance of <br /> avoiding impacts to these species and their habitats (Per Mitigation Measure 4.6-1a). <br /> ■ Install temporary fencing at the edge of the construction area and the adjacent <br /> Woodbridge Irrigation District canal southern bank (Per Mitigation Measure 4.6-1b). <br /> Biological Resources 4.6-36 October 2021 <br />