Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> ■ If the professional archaeologist determines that the find does not represent a <br /> cultural resource, then work may resume immediately and no agency notifications <br /> are required. <br /> ■ If the professional archaeologist determines that the find does represent a cultural <br /> resource from any time period or cultural affiliation, then he or she shall immediately <br /> notify the County and lead federal agency. The agencies shall consult on a finding of <br /> eligibility and implement appropriate treatment measures if the find is determined <br /> to be eligible for inclusion in the NRHP or CRHR. Work cannot resume within the no- <br /> work radius until the lead agencies, through consultation as appropriate, determine <br /> that the site either: 1) is not eligible for the NRHP or CRHR; or 2) that the treatment <br /> measures have been completed to their satisfaction. <br /> Timing/Implementation: During the construction period <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> Impact 4.7-2 Potential for Impacts to Archaeological Resources. <br /> Impact Determination: less than significant with mitigation incorporated <br /> Threshold: Would the Project cause a substantial adverse change in the significance of an <br /> archaeological resource pursuant to CEQA Guidelines Section 15064.5? <br /> The Project area was investigated by a professional archaeologist, who concluded that there were no <br /> known unique archaeological resources within the Project area. However, there is alluvium deposited from <br /> Bear Creek and Pixley Slough present to the north and south of the Project Area and the Project Area is <br /> situated on a Holocene landform, increasing the likelihood that any potential resources existing in the <br /> Project Area could be subsurface. Miwok territory encompasses the Project Area and pre-contact villages <br /> were often located along waterways such as Pixley Slough and Bear Creek.Therefore, there is a potential <br /> for buried pre-contact archaeological resources on the property. For this reason, the Proposed Project <br /> may result in a potentially significant impact to unknown unique archaeological resources.With <br /> implementation of Mitigation Measure 4.7-1 a, this impact would be less than significant with <br /> mitigation incorporated. <br /> Mitigation Measures <br /> Implement Mitigation Measure 4.7-1a (presented above). <br /> Impact 4.7-3 Potential for Impacts to Human Remains. <br /> Impact Determination: less than significant with mitigation incorporated <br /> Threshold: Would the Project disturb any human remains, including those interred outside of dedicated <br /> cemeteries? <br /> Biological Resources 4.7-14 October 2021 <br />