My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Impact 4.8-2: Potential Conflicts with Energy Use Plans. <br /> Impact Determination: Less than significant <br /> Threshold: Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? <br /> The Project would be designed in a manner that is consistent with relevant energy conservation plans, <br /> such as the energy conservation strategies contained in the County General Plan, designed to encourage <br /> development that results in the efficient use of energy resources. All development in unincorporated San <br /> Joaquin County is required to adhere to all jurisdictional-adopted policy provisions, including those <br /> related to energy conservation.Additionally, the Project would be influenced by SB 100 and would <br /> achieve 100 percent clean and carbon free electricity by 2040. The Project would not conflict or obstruct <br /> any local or state plans for renewable energy or energy efficiency. This impact is less than significant. <br /> Mitigation Measures <br /> No mitigation is required. <br /> 4.8.4 Cumulative Impacts <br /> Project level energy impacts were determined to be less than significant. As such, the Project's <br /> contribution to energy impacts is found to be less than cumulatively considerable. <br /> Mitigation Measures <br /> None required. <br /> Energy 4.8-10 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.