Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Cumulative impacts would only occur if other current or future projects in the area have the potential to <br /> cause, directly or indirectly, the impacts discussed above. The potential for any of these impacts to occur <br /> during construction activities is less than significant, with the exception of the potential loss of a <br /> paleontological resource and erosion of top soil. With implementation of mitigation measures 4.9-5a, 4.9- <br /> 5b, and given State requirements for preparation of a SWPPP, these potential impacts would be mitigated <br /> to a less then significant level. Therefore, the Proposed Project, when combined with other projects in the <br /> area, would result in a less than cumulatively considerable impact. <br /> Mitigation Measures <br /> None required. <br /> Geology and Soils 4.9-12 October 2021 <br />