Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Table 4.15-4.Existing(Baseline)Traffic Noise Levels <br /> Roadway Segment Surrounding Uses CNEL at 100 feet from <br /> Centerline of Roadway <br /> Leach Road <br /> North of Eight Mile Road Residential and Agricultural 38.2 <br /> Morada Lane <br /> East of West Lane(City of Stockton) Residential and Agricultural 57.7 <br /> West of West Lane(City of Stockton) Residential and Agricultural 50.3 <br /> Ham Lane <br /> Between Eight Mile Road and West Lane Residential and Agricultural 41.2 <br /> Between West Lane and Armstrong Road Residential and Agricultural 55.5 <br /> North of Armstrong Road Residential and Agricultural 56.7 <br /> North of West Lane Residential and Agricultural 44.9 <br /> West Lane <br /> Between Eight Mile Road and Ham Lane Residential and Agricultural 59.9 <br /> Lower Sacramento Road <br /> North of Eight Mile Road Residential and Agricultural 60.6 <br /> South of Eight Mile Road Residential and Agricultural 59.1 <br /> Davis Road <br /> North of Eight Mile Road Residential and Agricultural 50.0 <br /> South of Eight Mile Road Residential and Agricultural 56.3 <br /> Armstrong Road <br /> East of West Lane Residential and Agricultural 55.7 <br /> West of West Lane Residential and Agricultural 54.5 <br /> Source: Traffic noise levels were calculated by ECORP using the FHWA roadway noise prediction model in conjunction with the trip <br /> generation rate identified by KD Anderson&Associates(2020).Refer to Draft EIR Appendix H for traffic noise modeling <br /> assumptions and results. <br /> Note: A total of 23 intersections were analyzed in the Traffic Impact Study;however,only roadway segments that impact sensitive <br /> receptors were included for the purposes of this analysis. <br /> Noise 4.15-11 October 2021 <br />