Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Figure 4.19-5 presents a map from the San Joaquin County Bicycle Master Plan Update showing the <br /> central San Joaquin County area. In the vicinity of the Project site, the plan includes: <br /> a Class III County Proposed Bicycle Route on West Lane from Eight Mile Road to the Lodi city <br /> limits, <br /> A Class II City Proposed Bicycle Lane on Eight Mile Road from Lower Sacramento Road to the <br /> UPRR railroad crossing east of West Lane, and <br /> A Class II City Proposed Bicycle Lane on West Lane from Eight Mile Road to Bear Creek. <br /> 4.19.1.5 Study Area Intersections <br /> The traffic-related effects of the proposed Project were assessed by analyzing traffic operations at <br /> intersections that would serve Project-related travel. The following intersections were selected for analysis <br /> in consultation with County of San Joaquin staff(Levers pers. comm.) Existing intersections are numbered <br /> 1 through 15. Future intersections, including project driveway intersections, are numbered 20 through 26. <br /> 1. Eight Mile Road & 1-5 Southbound Ramps <br /> 2. Eight Mile Road & 1-5 Northbound Ramps <br /> 3. Eight Mile Road & Davis Road <br /> 4. Eight Mile Road & Lower Sacramento Road <br /> 5. West Lane &Armstrong Road <br /> 6. West Lane & Ham Lane <br /> 7. West Lane & Eight Mile Road <br /> 8. West Lane & Morada Lane <br /> 9. Eight Mile Road & Ham Lane <br /> 10. Eight Mile Road & Leach Road <br /> 11. Eight Mile Road & Micke Grove Road/Holman Road <br /> 12. Eight Mile Road &SR 99 West Frontage Road <br /> 13. Eight Mile Road &SR 99 East Frontage Road <br /> 14. SR 99 West Frontage Road &SR 99 Southbound Ramps (Eight Mile Road) <br /> 15. SR 99 East Frontage Road & SR 99 Northbound Ramps (Eight Mile Road) <br /> The following two intersections would be constructed as part of the Tra Vigne Development Project (City <br /> of Stockton 2O18a), which is located southeast of the intersection of Eight Mile Road &West Lane. The <br /> Tra Vigne Development Project is included as an approved project in the EPAP and Cumulative scenarios <br /> analyzed for this traffic impact study. As a result, these two intersections were only analyzed under the <br /> EPAP and Cumulative scenarios: <br /> 20. West Lane &Tra Vigne Road B <br /> 21. Eight Mile Road &Tra Vigne Road C <br /> The following three intersections would only be present with construction of the proposed Project. As a <br /> result, these intersections were only analyzed under development conditions that included the proposed <br /> Project: <br /> Transportation 4.19-12 October 2021 <br />