Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Timing/Implementation: During the construction period <br /> Monitoring/Enforcement.• County of San Joaquin Planning/Development Services Division <br /> 4.19-1 b: Provide On- and Offsite Bicycle Facilities <br /> The applicant shall implement the following to ensure adequate provision of bicycle <br /> facilities. <br /> On-Site Bicycle Facilities. The applicant shall provide on-site facilities supporting the use <br /> of bicycles. These facilities shall include secure bicycle parking in close proximity to <br /> proposed structures, and onsite bicycle paths or bicycle lanes connecting to the proposed <br /> bicycle facilities on West Lane. <br /> West Lane Driveway Connection. The connection of the Project site driveway to West <br /> Lane shall be designed to facilitate and protect bicycle travel. Design features should <br /> include striping to guide bicycles across the driveway and signage to advise motorists of <br /> the bicycle crossing (similar to a typical Class II bicycle lane crossing a right turn lane at <br /> an intersection). The Project site driveway shall be constructed to provide for future <br /> installation of planned bicycle facilities along the west side of West Lane. The project site <br /> driveway shall be designed to facilitate the future construction of a buffered Class 2 <br /> bicycle lane along the west side of West Lane. <br /> Timing/Implementation: During the construction period <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> 4.19-1 c: Conduct improvements to the Eight Mile Road/SR 99 West Frontage Road <br /> Intersection <br /> The Project applicant shall provide fair share funding for the following improvements to <br /> the Eight Mile Road/SR 99 West Frontage Road intersection. <br /> ■ Signalize the intersection. This intersection meets peak hour signal warrants. <br /> ■ Improve the eastbound approach to include an exclusive left-turn lane, an exclusive <br /> through lane, and an exclusive right-turn lane. <br /> ■ Improve the westbound approach to include an exclusive left-turn lane, an exclusive <br /> through lane, and an exclusive right-turn lane. <br /> Timing/Implementation: As directed by County of San Joaquin Development Services Division <br /> Monitoring/Enforcement: County of San Joaquin Planning/Development Services Division <br /> Transportation 4.19-38 October 2021 <br />