My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> In summary, it is unlikely that locating the Project a few miles west of its currently proposed location <br /> would significantly reduce the Project's air quality impacts. The air quality impact for Alternative 4 would <br /> be similar to that of the proposed Project. <br /> 6.3.5 Biological Resources <br /> 6.3.5.1 Alternative 1: No Project Alternative <br /> The draft EIR finds that with implementation of Mitigation Measures 4.6-1a through 4.6-1 h, Project <br /> impacts to biological resources would be less than significant with mitigation incorporated. Under the No <br /> Project Alternative, none of the proposed Project impacts that require the above mitigation would occur. <br /> Therefore Alternative 1 is superior to the proposed Project for the issue of potential impacts to special- <br /> status plant and wildlife species and/or their habitats. <br /> 6.3.5.2 Alternative 2: Reduced Project— Phase 1 Hospital Only <br /> The proposed Phase 1 development area comprises 12.5 acres of the 42.4-acre Project site. Therefore, the <br /> Reduced Project Alternative would result in an approximately 71 percent decrease in land development <br /> compared to the proposed Project with a corresponding reduction in the potential for impacts to special <br /> status species. Thus, Alternative 2 is superior for the issue of potential impacts to special-status plant and <br /> wildlife species and/or their habitats. <br /> 6.3.5.3 Alternative 3: Connect to Public Utilities - Water, Wastewater and Storm Water <br /> Under this alternative, the onsite areas reserved for water, wastewater and storm water utility construction <br /> would no longer be required and the Project development footprint could be reduced accordingly, <br /> potentially benefiting special status species. As shown on Figure 6-2, all pipeline extensions required to <br /> connect the Project site with the nearest available water, wastewater and storm water utilities would occur <br /> within existing road right-of-way and would have no direct impact on biological resources/special status <br /> species.Therefore, Alternative 3 would decrease potential impacts to biological resources including <br /> special status species compared to the proposed Project and is marginally superior for this issue. <br /> 6.3.5.4 Alternative 4: Alternative Site Location—Stockton Economic and Education <br /> Enterprise Zone (Eight Mile Road at 1-5) <br /> Alternative 4 would relocate the Project site to a suitable location within the City of Stockton Economic <br /> and Education Enterprise Zone located north of Eight Mile Road and east and west of 1-5 as shown in <br /> Figure 6-2. <br /> Existing conditions at the alternative site location are similar to the Project site in that it is mostly level and <br /> currently in agricultural production.Therefore, Project development at the alternative site is expected to <br /> be subject to similar biological resource mitigation as the proposed Project. <br /> Because the alternative site is located within the City, development at the alternative site would include <br /> connection to City of Stockton utilities which would reduce the required construction footprint compared <br /> Alternatives 6-13 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.