Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Table 3-3.Employees,Customers and Deliveries per Work Shift* <br /> Number of Shift #of Days Average# Average# Average# <br /> Building Length Shift Hours of Employees 1 Customer Deliveries <br /> Shifts Hours Operation Shift s per Shift per Shift <br /> Phase 1 6 am-6 pm 10 36 2 <br /> Hospital 2 12 6 pm-6 am 7 Days 10 36 <br /> (Option 1) <br /> Phase 1 6 am-2 pm, 10 <br /> Hospital 3 8 2 pm-10 pm, 7 Days 10 <br /> (Option 2) 10 pm-6 am 10 <br /> Phase 2 Main 6 am-6 pm, 100 300 10 <br /> Hospital 2 12 6 pm-6 am 7 Days 75 100 2 <br /> (Option 1) <br /> Phase 2 Main 6 am-2 pm, 100 <br /> Hospital 3 8 2 pm-10 pm, 7 Days 100 <br /> (Option 2) 10 pm-6 am 75 <br /> Medical Office 1 8 8 am-5 pm M-F 100 384 4 <br /> Building <br /> *Yearround <br /> 3.7.2 Helicopter Operations <br /> According to the Heliplanners memo prepared for the Project (2021, Appendix_), the anticipated number <br /> of daily flights would vary. Rescue events with multiple victims can result in multiple flights within <br /> relatively short periods. However, on average approximately one landing/take off event per week is <br /> expected. <br /> Given the current site plan, prevailing winds and surrounding land uses, according to Heliplanners, the <br /> preliminary helicopter approach and departure flight path is expected to be a southeast/northwest <br /> alignment as shown on Figure 3-8. Helicopter Preliminary Flight Path. During emergency events, flight <br /> plans could deviate from the preliminary flightpath depending on the urgency of the situation. Further, <br /> other factors could affect flightpath layout at the actual time of heliport design which would occur during <br /> detailed Phase 2 site planning. <br /> Helicopters would descend to and climb from the heliport on different vertical profiles that may vary <br /> according to the pilot, weather, helicopter loading characteristics, etc. In general, for noise analysis <br /> purposes, default vertical flight profiles are used in computer noise modeling conducted for the Project. <br /> Section 3.0 Project Description 3-20 October 2021 <br />