My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Material excavation and compaction activities would be required primarily to install roads to meet fire and <br /> safety requirements. Consistent with Best Management Practices (BMPs), throughout grading operations, <br /> water trucks would provide water to the site to achieve the proper moisture content for compaction and <br /> dust suppression. Grading would be stopped to control dust generation during times of excessive wind. <br /> Underground utilities would be installed using standard underground utility trenching methods.Trenches <br /> would be excavated by hand or by a backhoe or similar excavation equipment. Underground utility <br /> placement would begin immediately following trench excavation, followed by back fill and compaction. <br /> Table 3-4.Construction Equipment List <br /> Grading,Underground and Road Building Construction Phase <br /> Construction Phase <br /> 6 Rubber Tired Dozers 2 Cranes <br /> 8 Tractors/Loaders/Backhoes 6 Forklifts <br /> 2 Excavator 2 Generator Sets <br /> 2 Grader 6 Tractors/Loaders/Backhoes <br /> 4 Pavers 2 Welders <br /> 4 Paving Equipment 2 Air Compressors <br /> 4 Rollers <br /> 3.9 Requested Entitlements <br /> Prior to initiation of Phase 1 development, the following project entitlements are requested from San <br /> Joaquin County. <br /> 3.9.1 Lot Line Adjustment Application <br /> As shown on Figure 3-9. Existing Assessor Page and Proposed Lot Line Adjustment, the Project site is <br /> comprised of three legal parcels totaling 60.8 acres. The Project proposes a lot line adjustment to parcels <br /> 30 and 7 to reconfigure the existing parcels and exclude 18.4 acres from the Project site to conform with <br /> Project phasing (Figure 3-9.). Following the lot line adjustment, portions of Parcels 7 and 30 would <br /> become part of the Phase 2 development area.The balance of Parcel 30 would remain in agriculture crop <br /> production and retain the existing residence.The existing and proposed acreages for each parcel <br /> following lot line adjustment are shown in Table 3-5. <br /> Section 3.0 Project Description 3-23 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.