My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 8:42:09 AM
Creation date
11/9/2021 8:38:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />I SECONDARY CONTAINMENT TESTING REPORT FORM (Page 5 of 6) <br />XVII. FILL RISER SUMP TESTING INFORMATION <br />Manufacturer Identify Tank ID from section III for each Manufacturer <br />Unknown AZ B IZ C D D 0 <br />A D BE] C D D DI <br />Test Method Used: <br />D Manufacturer Guidelines (Specify) <br />E Industry Code or Engineering Standard: (Specify) PEI RP1200 <br />0 Engineered Method: (Specify) <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Fill Riser Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br />Unknown <br />XVIII. COMMENTS <br />Provide any additional comments here. <br />XIX. VENT / TRANSITION PIPING SUMP TESTING INFORMATION <br />Manufacturer Identify Vent / Transition Sump ID from <br />section III for each Manufacturer <br />a I=I b El CD d D <br />aD b CI c El d 0 <br />Test Method Used: <br />0 Manufacturer Guidelines: (Specify) <br />M Industry Code or Engineering Standard: (Specify) <br />D Engineered Method: (Specify) <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Vent! Transition Piping Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br />XX. COMMENTS <br />Provide any additional comments here. <br />II) = I dentilication
The URL can be used to link to this page
Your browser does not support the video tag.