My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VEEDER ROOT CARBON CANISTER VAPOR POLISHER <br />COMPLIANCE AND INSTALLATION NOTES <br />THESE NOTES ARE APPLICABLE TO NEW AND RETROFIT INSTALLATIONS <br />LOCATION OF VAPOR PROCESSING EQUIPMENT CA FIRE CODE: <br />CFC 2010 §2206.7.9.2.2 LOCATION <br />EQUIPMENT VAPOR -PROCESSING EQUIPMENT SHALL BE LOCATED AT OR ABOVE <br />GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT LESS THAN 50 FEET <br />(15240MM) FROM FUEL -TRANSFER AREAS AND NOT LESS THAN 18 INCHES <br />(457.2MM) ABOVE TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS. <br />VAPOR -PROCESSING UNITS SHALL BE LOCATED NOT LESS THAN 10 FEET <br />(3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY <br />WHICH CAN BE BUILT UPON. <br />EXCEPTION: WHERE THE REQUIRED DISTANCES TO BUILDINGS, PROPERTY <br />LINES OR FUEL -TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL BE <br />PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE <br />MEANS INCLUDE: <br />1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT LEASE 18 <br />INCHES (457.2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF <br />FIRE-RESISTANT OR NON-COMBUSTIBLE MATERIALS OR <br />2. FIRE PROTECTION USING AN APPROVED WATER -SPRAY SYSTEM. <br />VAPOR -PROCESSING EQUIPMENT SHALL BE LOCATED A MINIMUM OF 20 FEET <br />(6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE <br />PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE <br />ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE ENCLOSURES ARE <br />USED, APPROVED MEANS SHALL BE PROVIDED TO VENTILATE THE VOLUME <br />WITHIN THE ENCLOSURE TO PREVENT POCKETING OF FLAMMABLE VAPORS. <br />ADDITIONAL INSTALLATION NOTES: <br />1. ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER <br />INSTALLATIONS SHALL BE REVIEWED BY BP LOGISTICS FOR APPROVAL <br />PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND <br />RE -REVIEWED BY BP LOGISTICS AFTER PERMIT APPROVALS ARE OBTAINED. <br />ADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS <br />TO MAKE SURE THERE ARE NO SENSITIVE RECEPTORS WITHIN 1000 FEET <br />OF THE EQUIPMENT LOCATION. <br />2. ON EXISTING FACILITIES CONTRACTOR TO PERFORM LIQUID AND VAPOR <br />TIGHTNESS TEST ON VENT LINES PRIOR TO PROCEEDING WITH INSTALLATION <br />OF THE VEEDER ROOT SYSTEM, REPORT TO BP PRODUCT MANAGER WITH <br />RESULTS. <br />3. THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED SO THAT VAPORS <br />WILL DISPERSE. VAPORS SHALL BE DIRECTED UPWARD AND HORIZONTALLY <br />AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL BE LOCATED SO AS <br />NOT TO BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE <br />AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE SHALL NOT BE <br />LESS THAN 12' FROM FINISH GRADE. VENTS SHALL BE INSTALLED IN <br />ACCORDANCE WITH NEPA 30 (2012). <br />4. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF <br />CURB. <br />5. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND THE PROTECTION IN <br />PLACE OF EXISTING FACILITIES. <br />IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR -PROCESSING 6. MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER <br />UNIT FROM A FUEL -TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE FOOTPRINT TO GRADE. <br />ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT. <br />CFC 2010 §2206.7.9.2.3 INSTALLATION <br />VAPOR -PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE, <br />MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER <br />NON-COMBUSTIBLE FOUNDATIONS. <br />NOTE: BP DOES NOT PERMIT THE VAPOR -PROCESSING EQUIPMENT TO BE <br />INSTALLED ON ROOFS OF BUILDINGS OR CANOPY STRUCTURES. SEE ALTERNATE <br />MOUNTING DETAILS FOR EXISTING SITES WHERE VENT RISERS AR MOUNTED AT <br />ROOFS. <br />EXISTING CONDITIONS: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXISTING <br />CONTROLLING SITE CONDITIONS AND FOR COMPLIANCE WITH LOCAL ORDINANCES <br />AND CURRENT CALIFORNIA BUILDING CODES. <br />APPLICABLE CODES: <br />ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF <br />THE CALIFORNIA BUILDING CODE AND REFERENCED STANDARDS. <br />PLANS AND PERMITS: <br />THE CONTRACTOR SHALL OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND <br />SHALL POSSESS APPROVED PLANS PRIOR TO BEGINNING OF CONSTRUCTION. <br />UTILITY LOCATIONS: <br />THE CONTRACTOR WILL BE REQUIRED TO NOTIFY MEMBERS OF UNDERGROUND <br />SERVICE ALTER (U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION <br />WORK BY CALLING THE TOLL-FREE NUMBER (800)-227-2600. EXCAVATION <br />FOR THE PURPOSE OF THIS REQUIREMENT, IS DEFINED AS BEING 18" OR <br />MORE IN DEPTH BELOW THE EXISTING SURFACE. <br />7. BALL FLOAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD <br />PRACTICE FOR PROTECTION OF WETTING OF THE VENT AND STAGE II VAPOR <br />PIPING. CONTRACTOR TO CONFIRM THE EXISTING INSTALLATION AND <br />REPLACE ALL BALL FLOAT VALVES AT EXISTING FACILITIES. <br />8. CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT <br />PRODUCT VENT TIE IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER <br />PROCESSOR TIE-IN. PROVIDE CONFIRMATION ON PIPE AND TANK CHECKLIST <br />(LABEL MAKER OK). "DO NO INSTALL ON DIESEL" <br />9. THERE SHALL BE NO POCKETS OR LIQUID TRAPS IN ANY OF THE <br />CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR <br />POLISHER TO THE VENT STACK TIE-IN POINT. <br />10. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED. TIE THE <br />GROUND WIRE FROM THE VENT STACKS TO THE UST SYSTEM GROUND. <br />11. PRIOR TO PERFORMING MAINTENANCE, TEST PORT VALVE MUST BE VENTED <br />TO ATMOSPHERE. <br />12. VEEDER ROOT SYSTEM TO BE LEAK -TESTED PRIOR TO START-UP TO AVOID <br />LEAKAGE TO ATMOSPHERE. <br />13. ANY SPENT CARBON FROM CANISTER SHALL BE TREATED AS HAZARDOUS <br />WASTE AND DISPOSED OF PROPERLY <br />14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR <br />DAMAGE PRIOR TO START UP OR RE-COMMISIONING AFTER SERVICE. <br />ELECTRICAL INSTALLATION NOTES: <br />1. ALL ELECTRICAL INSTALLATIONS ARE TO BE PER NEC/CEC CODE FOR THE <br />AREA INSTALLED. INSTALLATION IN A CLASSIFIED AREA IS AN EXCEPTION <br />TO THE NORMAL SITING AND SHALL REQUIRE FURTHER REVIEW OF BP <br />PROJECT MANAGER. <br />2. ENSURE THE VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS <br />BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK <br />GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL <br />DISCHARGE AS AN IGNITION SOURCE. <br />3. BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR <br />CONSTRUCTION REGARDING DISPENSING EQUIPMENT ARE TO BE IN PLACE <br />AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE (PEI). <br />ADDITIONAL INSTALLATION NOTES AT DISPENSERS: <br />1. SOME DISPENSER NOZZLES HOLSTERS ARE NOT COMPATIBLE WITH THE <br />CURRENT VST DESIGN. CONSULT WITH BP PROJECT MANAGER FOR A LIST <br />OF DISPENSERS THAT ARE NOT COMPATIBLE WITH THE DESIGN AND DO NOT <br />INSTALL VST AT LOCATIONS WHERE THESE DISPENSERS EXIST. <br />2. THE PRESSURE SENSOR LOCATED IN THE DISPENSER SUMP CLOSEST TO <br />THE TANK FARM SHALL BE PREFERABLY MOUNTED OUTSIDE THE DISPENSER <br />CONTAINMENT SUMP OR ABOVE THE HIGHEST PENETRATION FITTING. DURING <br />CONTAINMENT SUMP CERTIFICATION TESTING CONTRACTOR TO REMOVE THE <br />PRESSURE SWITCH TO AVOID POSSIBLE WATER DAMAGE. <br />3. THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION, <br />SENSING PORT POINTING DOWN, AND WHEN REQUIRED BY AUTHORITY HAVING <br />JURISDICTION, THE CONNECTION TO THE VAPOR LINE MUST BE BELOW THE <br />SHEAR VALVE <br />4. THE 3 -WAY VALVE TEST PORT ON THE PRESSURE SENSOR IN THE <br />DISPENSER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH <br />LABELS INDICATING CORRECT OPERATING POSITION. VALVE TO REMAIN <br />CLOSED FOR NORMAL OPERATION TO AVOID FALSE PRESSURE READING BY <br />THE ISD SOFTWARE. <br />5. THE DISPENSERS MUST BE A BALANCE TYPE DISPENSER. <br />6. THE DISPENSERS MUST BE CARB APPROVED UNIHOSE TYPES UNLESS <br />PERMITTED BY AUTHORITY HAVING JURISDICTION. <br />7. THERE SHALL BE NO FLOW LIMITERS ALLOWED FOR THE VST SYSTEM. <br />8. FOLLOW PEI RP -400 FOR ELECTRICAL CONTINUITY OF HANGING HARDWARE <br />9. THE VST HANGING HARDWARE IS CAPABLE OF LONGER HOSE LENGTHS. <br />MAXIMUM HOSE LENGTH WHEN CONNECTED IS LIMITED TO 15'-0" CONSULT <br />WITH DISPENSER MANUFACTURER FOR EXTENDED HOSE REACH DESIGN <br />ALTERNATIVE. <br />TESTING NOTES: <br />PER CARB E.O. VR -204 ALL EXISTING SINGLE WALL VENT AND VAPOR PIPING <br />INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL <br />HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER <br />START-UP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE <br />FOLLOWING TEST PROCEDURES. <br />TP -201.3 DETERMINATION OF 2 -INCH WC STATIC PRESSURE <br />PERFORMANCE OF VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIES <br />(March 17, 1999); <br />TP -201.4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE <br />WITH THE CONDITION LISTED IN ITEM 1 OF THE VAPOR COLLECTION <br />SECTION OF EXHIBIT 2 OF THE VR -204 EXECUTIVE ORDER; IN ADDITION <br />BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 <br />EXHIBIT 4 OF THE VR -204 EXECUTIVE <br />ORDER, <br />REQUIRED ITEMS IN <br />CONDUCTING TP -201.3; <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />EXHIBIT 5 OF THE VR -204 EXECUTIVE <br />ORDER, <br />LIQUID REMOVAL TEST <br />PROCEDURE; <br />01/18/2021 <br />BID PACKAGE <br />EXHIBIT 6 OF THE VR -204 EXECUTIVE <br />ORDER, <br />HYDROCARBON SENSOR <br />VERIFICATION TEST; <br />EXHIBIT 8 OF THE VR -204 EXECUTIVE <br />ORDER, <br />VAPOR <br />PRESSURE SENSOR VERIFICATION TEST; <br />EXHIBIT 9 OF THE VR -204 EXECUTIVE <br />ORDER, <br />DETERMINATION OF VST <br />PROCESSOR ACTIVATION PRESSURE; <br />AND EXHIBIT 11 OF THE VR -204 EXECUTIVE ORDER, <br />OPERABILITY TEST <br />PROCEDURE FOR THE VEEDER-ROOT ISD FLOW <br />METER. <br />SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL <br />DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST <br />RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT <br />REQUIREMENTS AND PURSUANT TO POLICIES ESTABLISHED BY THAT DISTRICT. <br />ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS OF THE <br />TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB <br />EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO YIELD <br />EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING <br />REQUIREMENTS ARE MADE A CONDITION OF CERTIFICATION. THE OWNER OR <br />OPERATOR OF THE VST PHASE II EVR SYSTEM INCLUDING VEEDER-ROOT ISD <br />SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN 60 DAYS <br />AFTER STARTUP USING THE FOLLOWING TEST PROCEDURE: EXHIBIT 10, NOZZLE <br />BAG TEST PROCEDURE. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST <br />RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT <br />REQUIREMENTS AND PURSUANT TO THE POLICIES ESTABLISHED BY THAT <br />DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS <br />OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY <br />THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, <br />TO YIELD EQUIVALENT <br />RESULTS. <br />CLIENT: <br />4: bp <br />'Ad & <br />11F <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />0 <br />01/18/2021 <br />BID PACKAGE <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />io <br />SEAL: <br />FESS /0 <br />Cf-�gp�l <br />NO. 36475 <br />* XP. 6-30-22 <br />ATF <br />� CAUF��� <br />z <br />LU <br />w <br />•Q <br />Co <br />U <br />zoo 0 <br />Z <br />z~�- <br />0v7rn� <br />mZ <br />UOQ <br />�QU <br />LU <br />Cr <br />QLLI <br />I I w w <br />�Z}LL <br />0 O z o <br />�Z <br />UzOrn <br />(I II <br />zUUo <br />zz <br />Q <br />p Z N <br />wz0-- <br />�w <br />LLJ< <br />z Lo Q -- <br />06 <br />z . t <br />Z � <br />Q <br />Lu 00 w <br />z <br />(D <br />z 0 <br />2 0- <br />z <br />g <br />oL <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />DATE: <br />PROJECT NO: <br />DRAWING TITLE: <br />DESIGN INTENT: VEEDER-ROOT <br />CARBON CANISTER VAPOR POLISHER <br />COMPLIANCE AND INSTALLATION NOTES <br />(CALIFORNIA ONLY) <br />SHEET NO: <br />
The URL can be used to link to this page
Your browser does not support the video tag.