UNDERGROUND
<br />SCALE:
<br />8" THICK, 4000 PSI.
<br />FIBER REINFORCED
<br />CONCRETE TANK SLAB SEE
<br />SHEET G.0.2.2. FOR SPECS.
<br />OVERALL LENGTH:
<br />37'-5"
<br />OUTSIDE DIAMETER:
<br />10'-0"
<br />WEIGHT (DRY/ WET):
<br />9,750/13,550 lbs
<br />ACTUAL CAPACITY:
<br />19,951 GALLONS
<br />NOMINAL CAPACITY:
<br />20,000 GALLONS
<br />95% CAPACITY:
<br />18,953 GALLONS
<br />FUR IVUIJILR-JHILLLI IC IJIJ V1 'I
<br />MANIFOLDED USTs USING SINGLE
<br />2 HP TURBINE ON 20K TANK
<br />(2022 CONFIGURATION)
<br />FOR MASTER -SATELLITE ISTs ON
<br />MANIFOLDED USTs USING DUAL
<br />14 2 HP TURBINES ON 20K TANK
<br />(2022 CONFIGURATION)
<br />H FOR SINGLE IST & SINGLE UST
<br />.5.3.15 (2012 CONFIGURATION)
<br />VO v
<br />A: UNDERGROUND TANK SECTION DETAIL
<br />SCALE: 1/2" = l' -O"
<br />®
<br />NOTES: UST INSTALLATION
<br />TOTAL TANK UPLIFT = 166,858 LBS +
<br />4,799 LBS = 171,657 LBS }
<br />O1
<br />SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN.
<br />OFIBER
<br />REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT
<br />375.36 CU FT
<br />CONCRETE.
<br />375.36 CU FT X 87.6 LBS/CU FT = 32 881 LB
<br />BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FROM
<br />OREINFORCING
<br />SURFACE.
<br />BID PACKAGE
<br />CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" IN
<br />OREINFORCE
<br />LENGTH. PLACE REBAR 6" FROM SIDES OF BOX.
<br />O5
<br />SINGLE 1" CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL -OFF AT
<br />SUMP & BUILDING WIRING TROUGH. CONTAINS LINE VOLTAGE WIRING. ALL
<br />CONDUIT PENETRATIONS MUST BE MADE WITH ROBROY PVC COATED CONDUIT
<br />CURVED BACKFILL ABOVE TANK:
<br />ONLY.
<br />0
<br />ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK.
<br />FOR STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP
<br />O6
<br />SENSORS, PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL
<br />SENSOR LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL -OFFS IN
<br />4,124.4 CU FT - 3,245.5 CU FT =
<br />BUILDING & PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO
<br />INTRINSICALLY SAFE TROUGH IN BUILDING. CONDUITS SHALL CONTAIN
<br />2
<br />ONLY LOW VOLTAGE WIRING FOR SENSORS. ALL CONDUIT PENETRATIONS
<br />444.5 CU FT X 57.6 LBS/ CU FT =
<br />MUST BE MADE WITH ROBROY PVC COATED CONDUIT ONLY.
<br />USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN '/0"
<br />GRAVEL COLUMN ABOVE DEADMEN:
<br />MAX OF /" IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL
<br />O&
<br />SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S FIELD
<br />CU FT
<br />REPRESENTATIVE.
<br />O8
<br />NOT USED.
<br />O9
<br />NOT USED.
<br />CONCRETE DEADMEN:
<br />PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST
<br /><@TANK
<br />>COVER
<br />THE FOOTPRINT OF THE TANKS. REQUIRED TO PROVIDE FOR PROPER
<br />z
<br />TANK HOLD DOWN, AND TO PREVENT ACCIDENTAL DRILLING INTO TANK.
<br />11
<br />CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE CORNERS
<br />Lu co
<br />Q
<br />WHERE MEETING CONCRETE.
<br />DRY WEIGHT OF TANK:
<br />REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS & NUMBER OF
<br />12
<br />PRODUCT LINES (1 OR 2 PER UST SUMP).
<br />TOTAL HOLD DOWN:
<br />TURBINE AND FILL SIDE SUMP CONFIGURATION SHOWN IS TYPICAL. FOR
<br />13
<br />SPECIFIC DESIGN CRITERIA AT THESE SUMPS SEE ACCOMPANYING TANK
<br />INSTALLATION SITE PLAN & SUMP DETAIL DRAWINGS NOTED ABOVE.
<br />c/) Z}LL
<br />TANK ANCHORING, CONSULT LOCAL REGULATION; VERIFY WITH OWNER'S
<br />14
<br />REPRESENTATIVE.
<br />`'zoco
<br />z U U o
<br />OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY USE OF
<br />O>
<br />OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT 95% AND IS IN
<br />w<
<br />z coz
<br />ACCORDANCE WITH FEDERAL AND STATE GUIDELINES FOR UST OVERFILL
<br />15
<br />REQUIREMENTS.
<br />Z �t
<br />w 00 w
<br />AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER ROOT
<br />O O
<br />AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM PROVIDES AN
<br />z =
<br />z 0-
<br />AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE FILLED TO THE 90%
<br />z
<br />g
<br />LEVEL.
<br />XX NOTE:
<br />INDICATES ITEMS FOUND ON MAT
<br />41.5'
<br />0
<br />3.5' DIA.
<br />SUMPS
<br />TANK
<br />10.5' DIA.
<br />9,750 LBS
<br />0
<br />M.5.3.01 & M.5.3.02
<br />�12"
<br />13'-6"
<br />00 00
<br />BUOYANCY CALCULATIONS
<br />8" CONCRETE SLAB AT
<br />87.6 LB/CF
<br />4' MIN.
<br />COVER
<br />DEPTH
<br />1.5' GRAVEL
<br />COLUMN
<br />.67' X 1.5' X 36.0'
<br />DEADMAN
<br />CALCULATION BASED ON SUBMERGED WEIGHT OF MATERIALS:
<br />TANK WITH SPHERICAL ENDS, 10.5' O.A. DIA. (10' NOMINAL)
<br />TANK LENGTH: 37' 5-1/2" TANK DIAMETER 10'-6"
<br />TRY 36'-0" DEADMAN, EACH SIDE, 18" WIDE X 8" HIGH
<br />EMPTY TANK UPLIFT = 20,000 GAL
<br />= 2,674 CU FT
<br />7.48 GAL./CF
<br />2,674 CU FT X 62.4 LBS/CF = 166,858 LBS (DISPLACED WATER)
<br />TANK SUMP UPLIFT = (2) X 3.14 X 1.75'2 X 4' = 76.9 CU FT
<br />76.9 CF X 62.4 LBS/CU FT = 4,799
<br />LBS (DISPLACED WATER)
<br />TOTAL TANK UPLIFT = 166,858 LBS +
<br />4,799 LBS = 171,657 LBS }
<br />HOLD DOWN CALCULATION
<br />BP WEST COAST PRODUCTS, LLC
<br />NO.
<br />TANK SLAB: .67' X 13.5' X 41.5' =
<br />375.36 CU FT
<br />Q04/10/2020
<br />375.36 CU FT X 87.6 LBS/CU FT = 32 881 LB
<br />REV. PER SJCEHD
<br />CUBED BACKFILL ABOVE TANK:
<br />BID PACKAGE
<br />4' X 10.5' X 37.5' = 1,575 CU FT
<br />- 76.9 CU FT = 1,498.1 CF
<br />1,498.1 CU FT X 57.6 LBS/ CU FT
<br />= 82,291 LBS
<br />0
<br />CURVED BACKFILL ABOVE TANK:
<br />0
<br />3.14 X 5.25'2X 37.5' = 3,245.5 CU FT
<br />10.5' X 10.5' X 37.5' = 4,124.4 CU
<br />FT
<br />4,124.4 CU FT - 3,245.5 CU FT =
<br />888.9 CU FT= 444.5 CU FT
<br />0
<br />2
<br />444.5 CU FT X 57.6 LBS/ CU FT =
<br />25.603 LBS
<br />®
<br />GRAVEL COLUMN ABOVE DEADMEN:
<br />1.5' X 14.5' X 36.0' X 2 = 1,566
<br />CU FT
<br />SEAL:
<br />1,566 CU FT X 57.6 LBS/ CU FT =
<br />90,201 LBS
<br />50
<br />CONCRETE DEADMEN:
<br />ATF
<br />OF- CAUF���
<br />.67' X 1.5' X 36.0' = 36.2 CU FT
<br />z
<br />36.2 CU FT X 87.6 LBS/ CU FT X
<br />(2) = 6,342 LBS
<br />Lu co
<br />Q
<br />©
<br />DRY WEIGHT OF TANK:
<br />9,750 LBS
<br />TOTAL HOLD DOWN:
<br />247.068 LBS
<br />TOTAL HOLD DOWN: 247,068 LBS = 1.43 SAFETY FACTOR
<br />TOTAL TANK UPLIFT: 171,657 LBS
<br />BUOYANCY CALC. 20,000 GAL. TANK
<br />SCALE: NTS (TYPICAL CALCULATION ASSUMING 4' MINIMUM OVER OF GRAVEL)
<br />CLIENT:
<br />4: bp
<br />'Ad &
<br />lir
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />NO.
<br />DATE
<br />DESCRIPTION
<br />Q04/10/2020
<br />REV. PER SJCEHD
<br />Q01/18/2021
<br />BID PACKAGE
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />10
<br />11
<br />SEAL:
<br />FESS /0
<br />GHgO��
<br />NO. 36475
<br />* XP. 6-30-22
<br />ATF
<br />OF- CAUF���
<br />z
<br />Lu
<br />13
<br />Lu co
<br />Q
<br />•
<br />UQm o
<br />Z
<br />z~��
<br />0�co
<br />mZ
<br />CornQ
<br />�QU
<br />QLLI
<br />w
<br />c/) Z}LL
<br />I I w
<br />0 O z o
<br />�z
<br />`'zoco
<br />z U U o
<br />Z
<br />O>
<br />LU
<br />w<
<br />z coz
<br />Q--
<br />C7oU
<br />Z �t
<br />w 00 w
<br />Q
<br />O O
<br />z =
<br />z 0-
<br />z
<br />g
<br />a_
<br />DEVELOPMENT INFORMATION:
<br />SITE ADDRESS:
<br />ADDRESS
<br />2510 S. STATE HWY 99 W. FRONTAGE ROAD
<br />SAN JOAQUIN COUNTY, CA 95205
<br />DESIGNED BY:
<br />CHECKED BY:
<br />DRAWN BY:
<br />ER
<br />DATE:
<br />PROJECT NO:
<br />10/29/2019
<br />DRAWING TITLE:
<br />TYPICAL 20,000 GALLON
<br />DOUBLE WALL FIBERGLASS TANK
<br />INSTALLATION DETAILS
<br />(MID FILL)
<br />SHEET NO:
<br />M,5,3,05