My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJUAQUIN Environmental Health Department <br /> —COUNTY Time In: <br /> Time Out: <br /> ilGreorness grows here. <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM/PM-BP Date: 09/01/2021 <br /> Address: 2510 S HWY 99 , STOCKTON 95205 <br /> Requestor: A&S ENGINEERING/ROBERT VELASCO,A&S ENGINEERING Telephone: (661)250-9300 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0081541 <br /> Inspection Type: 131 -UST INSTALLATION INSPECTION <br /> Onsite Service Technician: Adolf Alves ICC Service Tech/Installer Exp. Date: 12/07/2022 <br /> Manufacturer training: CSI, 01/15/24 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site and verified compaction and completion of backfilling of new CSI double walled fiberglass USTs <br /> -25,000 gallons <br /> - 12,000 gallons base, 10,000 end <br /> -20,000 gallons <br /> -20,000 gallons <br /> "Additional inspections are required. Refer to the approval letter dated July 7, 2021 for the list of inspections needed. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to John Savidge, Contractor <br /> EH Specialist: ELIANNA FLORIDO Phone: (209)616-3050 <br /> SR0081541 SC131 09/01/2021 <br /> EHD 23-01 Rev.09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.