Laserfiche WebLink
SANOAQU I N Environmental Health Department <br />COU NI T Y I Y Time In: <br />+_,fr Time Out: <br />Greotr+ess �row3 here. <br />Underground Storage Tank Program Service Request Inspection Report <br />Name of Facility: ARCO AM/PM - BP <br />Date: 11/19/2021 <br />Address: 2510 S HWY 99 , STOCKTON 95205 <br />Requestor: A & S ENGINEERING/ROBERT VELASCO, A & S ENGINEERING <br />Telephone: (661) 250-9300 <br />Program Element: 2303 - UST/PIPING INSTALLATION <br />Request #: SR0081541 <br />Inspection Type: 131 - UST INSTALLATION INSPECTION <br />Onsite Service Technician: Adolf Scot Alves <br />ICC Service Tech/Installer Exp. Date: 12/07/2022 <br />Manufacturer training: NOV, 03/09/22; Bravo, 01/08/24 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />On-site and witnessed the following: <br />1. Secondary piping slope at 1/8 inch per foot or greater, to a containment sump with an audible/visual alarm, near UDCs 1-8 <br />(car side). <br />2. Secondary piping soap test and line testing of all product, vent, and chase piping on the two 20,000 gallon (diesel) USTs. <br />3. All pipe setbacks, cross -overs, and burial depth and appropriate piping backfill. <br />4. Brine type and brine addition for all UDC sumps. <br />The following paperwork and inspections are still need prior to backfill: <br />- A letter from the piping manufacturer approving the styrofoam blocks to remain beneath the piping after backfill. <br />- Verification of secondary piping slope at 1/8 inch per foot or greater, to a containment sump with an audible/visual alarm, <br />from UDC's 9-11 (truck side) and in the tank pit. <br />- Integrity testing of all fill, STP, and vent sumps. <br />- Verification of brine type and witnessing of brine addition for all fill, STP, and vent sumps. <br />"Additional inspections are required. Refer to the approval letter dated July 7, 2021 for a list of inspections needed, and <br />provide a 48-hour notice by emailing ust@sjgov.org. <br />To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br />sign. <br />The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br />Safety Code. If a reinspection is required, fees will be assessed at the current hourly rate. <br />Received by: <br />EH Specialist: ELIANNA FLORIDO <br />Name and Title: Emailed to John Savidge, Contractor <br />Phone: (209) 616-3050 <br />SR0081541 SC131 11/19/2021 <br />EHD 23-01 Rev. 09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />