Laserfiche WebLink
GRA . <br /> Architects & <br /> EXT. CEM. <br /> Associffiek 111c. <br /> PLAST. FINISH GYP. BD. <br /> f <br /> J' MOLD ;I P.O. Box 9082 . <br /> HEADER 1 Stockton CA — <br /> 9�20� 10.82 <br /> I HEADER G.I. DRIP `I SLOPE TOP <br /> ATTACH SILL STRIP WITH TOP EDGE LEVEL 1/2" RUN CAP SHEET OV. <br /> WITH ROUGH SILL- EXTEND BEYOND EDGE I I FLASH' AT � i WALL & OVERLAP W/ Phone: {2 09) 609-6801 <br /> OF ROUGH OPENING AT LEAST 8". SECURE I I HEAD EXT. WALL OVERLAP <br /> - <br /> ALL MQISTOP (OR EQUAL.) WITH I I CONDITION 24 GA. G.1. RESISTANT BARRIER Email; GRA22875@gmail.com <br /> GALVANIZED NAILS OR POWER--DRIVEN f I COPING . PAINT <br /> WINDOW STAPLES. �, <br /> OPENING j ROUGH WINDOW I I <br /> Architecture ♦ Consulting <br /> ROUGH I CONT, WD.. <br /> OPENING I I GROUND I�, i FASTENERS @ 24" <br /> 2. I I I I If WASHERS W/ WATERTIGHT <br /> ATTACH JAMB STRIP WITH INSIDE EDGE I I I I 16 GA. H.M. FRAME ,I HERS <br /> 1 EVEN WITH ROUGH-JAMB FRAMING, START I I G.I. CLEATS <br /> STRIP I " BELOW LOWER EDGE OF SILL STRIP 2. I I FRAMING - SEE <br /> AND EXTEND 4" ABOVE LOWER EDGE OF I I I I FRAMING <br /> - SE <br /> LINTEL. SECURE ALL MOISTOP (OR EQUAL) I I I I <br /> WITH GALVANIZED NAILS OR POWER-- I I I I J <br /> DRIVEN STAPLES. DOOR EXT. CEM. .I BUILT-UP ROOFING <br /> — _ I I I I PLAST. FINISH MEMBRANE <br /> II II II <br /> NOTE: LINE WIRE, WHEN USED AS BACKING TO SUPPORT BUILDING PAPER NATEThese drawings are Property of GRA Architects Associates. Inc., and <br /> : ars not to be reproduced, ehan , co ed or <br /> ged pi reused without the. <br /> BENEATH WIRE LATH (NETTING FOR PORTLAND CEMENT PLASTER), expressed written consent of GRA Arch sets do Aesoeiotes. Inc. <br /> 1. CUT ANY EXCESS BUILDING PAPER THAT <br /> SHALL E INSTALLED A5 FOLLOWS: MAY EXTEND ABOVE" THE SILL FLANGE HOLLOW ft A C T/� DOOR <br /> WITH WREQUIREMEN Sp DFNBUILDING DTHEW EMS TACHMENT SHALL <br /> BE !N ACCORDANCE LINE DASHED ON <br /> EACH SIDE OF (SHOWN AS SNORT I V1 L I A O R FRAME: (HEAD ) 1 n � j <br /> LINES). DO NOT CUT BUILDING PARAPET C 0 P I! N �j 2 consultant <br /> 2. PERIPHERAL FLASHING AT ALL EDGES OF WALL OPENINGS SHALL PAPER HORIZONTALLY SO THAT THE PAPER (JAMB SIM. ) SCALE: 3" = 1 '-0" AD-1 <br /> COVER WIRE BACKING. WILL LAP OVER THE JAMB STRIPS. INSTALL SCALE: 1 1/2" - 1 '_0" AD-1 <br /> 3. NOT ATTACHEMENT DEVICES NOT THE WIRE BACKING SHALL COVER SUCCESSIVE LAYERS OF BUILDING PAPER (B, <br /> OR PENETRATE THE FLASHING MATERIAL. CID, ETC.) OVER JAMB AND HEAD FLANGES, <br /> LAPPING EACH COURSE. <br /> — -- .- - __ _ _ — � _ � _ - C. EXT. CEM. PLAST. —� <br /> FINISH <br /> 3. <br /> INSTALL WINDOW JAMB NAILING FLANGES <br /> OVER A CONTINOUS BEAD OF SEALANT .{ <br /> OVER THE MQISTOP (OR EQUAL). INSTALL <br /> THE WINDOW HEAD STRIP OVER A _T Project For <br /> CONTINUOUS BEAD OF SEALANT APPLIED SNAP-LOCK G.I. <br /> TO THE WINDOW HEAD NAILING FLANGE. COUNTER FLASHING <br /> 3. AT TRANSITION <br /> B T. R a S i l G Inc. <br /> 4. 4. DOOR <br /> COMMENCING WITH THE BOTTOM (SOLE 1331 S. (Nilson Way <br /> q <br /> PLATE) OF THE WALL, LAY BUILDING PAPER Stockton , CA 9.5205 <br /> UNDER SILL STIRP. BUILT—UP ROOFING <br /> DOOR SHOE MEMBRANE Phone: (209) 688-8545 <br /> THRESHOLD SET- WD. OR FIBER CANT <br /> J-7 TOP OF CONC, IN MASTIC <br /> STRIP PER MFR. <br /> ry <br /> WALK W/ 2% x SPECS � <br /> MAX. SLOPE Q <br /> FIN, FLR. <br /> MEMBRANE ROOFING Project <br /> Taqueria E Grullense <br /> TOP OF ROOF FRAMING New Site Development <br /> 1328 S. Hunter St. <br /> Stockton , CA 95206 <br /> WINDOW FLASHING <br /> 3 HOLLOW METAL DOOR SILL <br /> 4 <br /> SCALE: NOT TO SCALE AD-1 TYPICAL FILET ROOF TO WALL. 5 <br /> SCALE: 3,. - 1 '-0" AD-1 <br /> SCALE: 1 1/2AD-1 shoot Contents <br /> " = 1 '-p" <br /> DETAILS <br /> EXT. CEM, ._ <br /> PLAST. FINISH <br /> J' MOLD °I CEM. <br /> PLAST. FINISH I <br /> NOT LESS THAN 3/8" O O <br /> FROM EDGES OR ENDS. R i <br /> G.I. DRIP "I i CONT. G.I. WEEP <br /> CEILING JOIST <br /> FLASH. AT I i SCREED I <br /> HEAD <br /> O O CONDITION i WALL FINISH - SEE PLAN <br /> i <br /> iE HARDSCAPING I <br /> WHERE DRAWING STATUS DATE <br /> 2 <br /> . I GYP. BD. i <br /> _ <br /> OCCURS cv <br /> ISSUED �8-09-1 <br /> 8 . <br /> . � QUARRY OR CERAMIC � / <br /> • i TELE BASE, MlN. 4" HIGH <br /> • HORIZ. SLIDING SEALANT <br /> NAIi 5 7" OtC. WINDOW <br /> FIN. GRADE 00 II <br /> • STAINLESS II <br /> • STL. EXT, SEALANT STAINLESS STL. COVERED <br /> COVERED & BACKER COUNTER I ) ( d <br /> SHELF" W/ ROD 3/8" MIN. RADIUS QUARRY OR CERAMIC <br /> . e e SLOPE TILE FLOORING I =III III=I III I I I I I—I <br /> NAILS �' O.C.. STUD — III=III—I I II f <br /> GROUT LINE I Q <br /> • I=1 I � I ! I= <br /> IIsi -IIr <br /> GYPSUM PANEL PRODUCT GYPSUM PANEL PRODUCT 1 <br /> 4 (_ BUILDING PERMIT NO.: TBD <br /> (PERPENDICULAR APPLICATION) (PARALLEL APPLICATION) ° ° a <br /> , ,'I �a 4 <br /> 4 d d <br /> EXT. CEM, <br /> DRAWN BY: VICENTE V. <br /> , � da a <br /> PLAST. FINISH I CONC. SLAB-ON-GRADE <br /> 1 CHECKED BY: GRA <br /> GYP. BD. INSTALLATION 6 <br /> SCALE: AS NOTED <br /> WINDOW SECTION 7 COINED BASE <br /> SCALE: NOT TO SCALE AD-1 8 <br /> B O TTC M O E WALL PROJECT NO.: TEG-21801018. <br /> SCALE: 3" = 1 '-0" AD-1 9 <br /> SCALE: 6" = i'_0" AD-1 SHEET: <br /> SCALE: 1 1/2" = 1 '--0" AD-1 <br />