My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 10:43:11 AM
Creation date
11/10/2021 8:23:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tarek <br />Monitoring y tem 'ertification Form <br />6. MONITORING SYSTEM AND PROGRAMMING <br />A separate Monitoring System► certification Form rntist be prepared for each c®nor®I panel <br />Make of Monitoring System Model of Monitoring System Software Version Installed <br />Control Panel Control Panel <br />AvM <br />Attach the post -certification reports if the monitoring system is capable of generatingYes No NA <br />either, ❑Monitoring System Set-up Aiarm History Report <br />El <br />All monitoring equipment is operational per manufacturer's specifications? <br />Secondary containment systems are free of damage, debris, or liquid? <br />Are the audible and visual alarms operational? <br />All sensors have been: 1) visually inspected for wiring kinks, breaks and residual❑ Elbuildup on floats; and 2) tested for functionality and confirmed operational? <br />Are all sensors installed to detect a release at the earliest opportunity in the p <br />secondary containment? <br />The monitoring system set-up was reviewed, and proper settings confirmed? 1"o 1 <br />Was the monitoring control panel's backup battery visually inspected, functionally ❑ p <br />tested, and confirmed operational? <br />Does the flow of fuel stop at the dispenser if a release is detected in the under- ❑ p <br />dispenser containment? <br />Does the turbine automatically shut down if the piping secondary containment ® ❑ <br />monitoring system fails to operate or is electrically disconnected? <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a relea e? Which sensors initiate positive shut down? El <br />(Check all that apply) Sump UDC <br />If monitoring system alarms are relayed to a remote monitoring center, is all ® p <br />communication equipment operational? <br />Describe all answers marked "No" or "Fail' and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.