A1.0 GENERAL NOTES, ABBREVIATIONS,& SYMBOLS LEGENDBCE #:Scale:Date:Drawn By:Checked By:Rev. #DateDescriptionSHEET:7-ELEVEN #411871829 N. WILSON WAY, STOCKTON, CA20744.SKAS NOTED03-25-20GUGGENHEIM PARTNERS, LLC3000 INTERNET BLVD., SUITE 570, FRISCO, TEXAS 75034PROTO 10-23-2019
<br />7043 SIP - RIGHT
<br />X
<br />GENERAL NOTES
<br />X.X.X.
<br />XXX
<br />X'-XX"
<br />X.X.X.X
<br />XX
<br />XX.X
<br />X
<br />XX
<br />XX
<br />F.E.
<br />XX
<br />X-XXX
<br />ABBREVIATIONSNOT ALL ABBREVIATIONS MAY BE USED IN THIS DOCUMENT
<br />GA GAGE, GAUGE
<br />GV GALVANIZED
<br />GKT GASKET, (ED)
<br />GC GENERAL CONTRACT, (OR)
<br />GL GLASS, GLAZING
<br />GLB GLASS BLOCK
<br />GCMU GLAZED CONCRETE
<br />MASONRY UNITS
<br />GLAM GLAZED LAMINATE
<br />GB GRAB BAR
<br />GD GRADE, (ING)
<br />GRN GRANITE
<br />GRT GRATE, (ING)
<br />GVL GRAVEL
<br />GRHS GREENHOUSE
<br />GT GROUT
<br />GRD GUARD
<br />GUT GUTTER
<br />GPDW GYPSUM DRYWALL
<br />GPL GYPSUM LATH
<br />GPPL GYPSUM PLASTER
<br />GPT GYPSUM TILE
<br />GPW GYPSUM WALLBOARD
<br />HC HANDICAP
<br />HRL HANDRAIL
<br />HBO HARDBOARD
<br />HDW HARDWARE
<br />HWD HARDWOOD
<br />HDR HEADER
<br />HTG HEATING
<br />HVAC HEATING/VENTILATION/AIR
<br />CONDITIONING
<br />HD HEAVY DUTY
<br />HT HEIGHT
<br />HPT HIGH POINT
<br />HCR HOLLOW CORE
<br />HOR HORIZONTAL
<br />HB HOSE BIBB
<br />INCAN INCANDESCENT
<br />INCIN INCINERATOR
<br />INCL INCLUDE, (ED), (ING)
<br />ID INSIDE DIAMETER
<br />INS INSULATE, (ED), (ING)
<br />INSC INSULATING CONCRETE
<br />IGL INSULATING GLASS
<br />INT INTERIOR
<br />INTM INTERMEDIATE
<br />INV INVERT
<br />JC JANITOR'S CLOSET
<br />JT JOINT
<br />JF JOINT FILLER
<br />J JOIST
<br />KPL KICKPLATE
<br />KIT KITCHEN
<br />KO KNOCKOUT
<br />LBL LABEL
<br />LAB LABORATORY
<br />LAD LADDER
<br />LB LAG BOLT
<br />LAM LAMINATE, (ED)
<br />LGL LAMINATED GLASS
<br />LAV LAVATORY
<br />LO LAYOUT
<br />LH LEFT HAND
<br />L LENGTH
<br />LT LIGHT
<br />LW LIGHTWEIGHT
<br />LMS LIMESTONE
<br />LTL LINTEL
<br />LL LIVE LOAD
<br />LOC LOCATE
<br />LLD LOOSE LAND
<br />LV LOUVER
<br />LPT LOW POINT
<br />MB MACHINE BOLT
<br />MH MANHOLE
<br />MFR MANUFACTURE, (ER)
<br />MRB MARBLE
<br />MAS MASONRY
<br />MTL MATERIAL
<br />MAX MAXIMUM
<br />MECH MECHANIC, (AL)
<br />MC MEDICINE CABINET
<br />MED MEDIUM
<br />MDO MEDIUM DENSITY OVERLAY
<br />MBR MEMBER
<br />MMB MEMBRANE
<br />MET METAL
<br />M METER, (S)
<br />MW MICROWAVE
<br />MM MILLIMETER, (S)
<br />MIN MINIMUM
<br />MR MIRROR
<br />MGL MIRROR GLASS (FRAMED)
<br />MISC MISCELLANEOUS
<br />MOD MODULAR
<br />MLD MOLDING, MOULDING
<br />MR MOP RECEPTOR
<br />MS MOP SINK
<br />MT MOUNT, (ED), (ING)
<br />MOV MOVABLE
<br />MULL MULLION
<br />NL NAILABLE
<br />NAT NATURAL
<br />NI NICKEL
<br />NR NOISE REDUCTION
<br />NOM NOMINAL
<br />N NORTH
<br />NIC NOT IN CONTRACT
<br />NTS NOT TO SCALE
<br />NO NUMBER
<br />OC ON CENTER, (S)
<br />OP OPAQUE
<br />OPG OPENING
<br />OPH OPPOSITE HAND
<br />ORN ORNAMENTAL
<br />OD OUTSIDE DIAMETER
<br />OA OVERALL
<br />OH OPPOSITE HAND
<br />PNT PAINT, (ED)
<br />PNL PANEL, (ING)
<br />PB PANIC BAR
<br />PTD PAPER TOWEL DISPENSER
<br />PTR PAPER TOWEL RECEPTOR
<br />PAR PARALLEL
<br />PRPT PARAPET
<br />PK PARKING
<br />PBD PARTICLE BOARD
<br />PTN PARTITION
<br />PV PAVE, (D), (ING)
<br />PVMT PAVEMENT
<br />PERF PERFORATE, (D)
<br />PER PERIMETER
<br />PEX PEX TUBING
<br />PTR PLANTER
<br />PLTG PLANTING
<br />PLAS PLASTER
<br />PLA PLASTIC
<br />PLAM PLASTIC LAMINATE
<br />PL PLATE
<br />PG PLATE GLASS
<br />PWD PLYWOOD
<br />PT POINT
<br />PVC POLYVINYL CHLORIDE
<br />PE PORCELAIN ENAMEL
<br />PCPL PORTLAND CEMENT PLASTER
<br />PD POUND, (S)
<br />PCF POUNDS PER CUBIC FOOT
<br />PLF POUNDS PER LINEAR FOOT
<br />PSF POUNDS PER SQUARE FOOT
<br />PSI POUNDS PER SQUARE INCH
<br />PCC PRECAST CONCRETE
<br />PFB PREFABRICATE, (ED)
<br />PFN PREFINISHED
<br />PRF PERFORATED
<br />PREM PREMOLDED
<br />PT PRESSURE TREATED
<br />PLT PROPERTY LINE
<br />QT QUARRY TILE
<br />RBT RABBET, REBATE
<br />RAD RADIUS
<br />RFT RAFTER
<br />RL RAIL, (ING)
<br />REC RECESS, (ED)
<br />REF REFER, (ENCE)
<br />RFL REFLECT, (ED), (IVE), (OR)
<br />REFR REFRIGERATOR
<br />REG REGISTER
<br />REN REINFORCE, (ED), (ING)
<br />RECP REINFORCED CONCRETE PIPE
<br />REM REMOVE, (ABLE)
<br />REQ'D REQUIRED
<br />RES RESILIENT
<br />RET RETURN
<br />RA RETURN AIR
<br />RVS REVERSE (SIDE)
<br />REV REVISE, (S), (ED)
<br />RH RIGHT HAND
<br />ROW RIGHT OF WAY
<br />R RISER
<br />RVT RIVET
<br />R&S ROD AND SHELF
<br />RD ROOF DRAIN
<br />RFH ROOF HATCH
<br />RFG ROOFING
<br />RM ROOM
<br />RO ROUGH OPENING
<br />RS ROUGH SAWN
<br />RCP ROUND CONCRETE PIPE
<br />ROK ROWLOCK
<br />RB RUBBER BASE
<br />RBT RUBBER TILE
<br />RBL RUBBER STONE
<br />SFGL SAFETY GLASS
<br />SCH SCHEDULE
<br />SCN SCREEN, (ED)
<br />SCUP SCUPPER
<br />SLNT SEALANT
<br />STG SEATING
<br />SEC SECTION
<br />SEI 7-ELEVEN INC.
<br />SVYD SERVICE YARD
<br />SSK SERVICE SINK
<br />SHTH SHEATH, (ING)
<br />SHT SHEET
<br />SG SHEET GLASS
<br />SH SHELF, SHELVING
<br />SHNG SHINGLE, (S)
<br />SHU SHUTTER, (S)
<br />SDG SIDING
<br />SM SIMILAR
<br />SKL SKYLIGHT
<br />SL SLEEVE
<br />SLO SLOPE
<br />SOL SOLDIER
<br />SC SOLID CORE
<br />SP SOUNDPROOF
<br />S SOUTH
<br />SPC SPACE, (R)
<br />SGL SPANDREL GLASS
<br />SPK SPEAKER
<br />SPL SPECIAL
<br />SPEC SPECIFICATION
<br />SPH SPLASH
<br />SQ SQUARE
<br />SF SQUARE FEET
<br />SST STAINLESS STEEL
<br />STGL STAINED GLASS
<br />STD STANDARD
<br />STA STATION
<br />ST STEEL
<br />STO STORAGE
<br />SD STORM DRAIN
<br />STR STRUCTURAL
<br />SIPS STRUCTURAL INSULATED PANEL
<br />STCO STUCCO
<br />SFLR SUBFLOOR
<br />SA SUPPLY AIR
<br />SUS SUSPENDED
<br />SYD SIDE YARD
<br />SYM SYMMETRY, (ETRICAL)
<br />SYN SYNTHETIC
<br />SYS SYSTEM
<br />TKBD TACKBOARD
<br />TEL TELEPHONE
<br />TV TELEVISION
<br />T TEMPERED GLASS
<br />TIG TEMPERED INSULATED GLASS
<br />TZ TERRAZZO
<br />THK THICK, (NESS)
<br />THR THRESHOLD
<br />TBRL TO BE RELOCATED
<br />TOBR TO BE REMOVED
<br />TPD TOILET PAPER DISPENSER
<br />TPTN TOILET PARTITION
<br />TOL TOLERANCE
<br />T&G TONGUE AND GROOVE
<br />TSL TOP OF CONCRETE SLAB
<br />TC TOP OF CURB
<br />TJ TOP OF JOIST
<br />TP TOP OF PLATE
<br />TST TOP OF STEEL
<br />TSF TOP OF SUBFLOOR
<br />TW TOP OF WALL
<br />TPG TOPPING
<br />TOR TO REMAIN
<br />TB TOWEL BAR
<br />TR TRANSOM
<br />TS TUBE STEEL
<br />TRNB TURNBUCKLE
<br />TYP TYPICAL
<br />UC UNDERCUT
<br />UNF UNFINISHED
<br />UNO UNLESS NOTED OTHERWISE
<br />UR URINAL
<br />UTL UTILITY
<br />VJ V-JOINT
<br />VB VAPOR BARRIER
<br />VAR VARNISH
<br />VNR VENEER
<br />VERT VERTICAL
<br />VG VERTICAL GRAIN
<br />VN VINYL
<br />VB VINYL BASE
<br />VCT VINYL COMPOSITION TILE
<br />VF VINYL FABRIC
<br />VT VINYL TILE
<br />VICP VITREOUS CLAY PIPE
<br />VICT VITREOUS CLAY TILE
<br />WSCT WAINSCOT
<br />WH WALL HUNG
<br />WC WATER CLOSET
<br />WHTR WATER HEATER
<br />WP WATERPROOFING
<br />WR WATER RESISTANT
<br />WS WATERSTOP
<br />WST WEATHERSTRIP, (ING)
<br />WWF WELDED WIRE FABRIC
<br />W WEST
<br />WHS WHEEL STOP
<br />WHA WATER HAMMER ARRESTOR
<br />WID WIDTH, WIDE
<br />WIN WINDOW
<br />WG WIRED GLASS
<br />WM WIRE MESH
<br />WO WITHOUT
<br />WD WOOD
<br />WI WROUGHT IRON
<br />AB ANCHOR BOLT
<br />ACP ACOUSTICAL CEILING PANEL
<br />ACT ACOUSTICAL CEILING TILE
<br />ADH ADHESIVE
<br />ADJ ADJUSTABLE
<br />AFF ABOVE FINISHED FLOOR
<br />AFG ABOVE FINISH GRADE
<br />AHU AIR HANDLING UNIT
<br />ALT ALTERNATE
<br />ALUM ALUMINUM
<br />AP ACCESS PANEL
<br />APC ARCHITECTURAL PRECAST
<br />CONCRETE
<br />AHJ AUTHORITY HAVING
<br />JURISDICTION
<br />BO BOTTOM OF
<br />BD BOARD
<br />BLDG BUILDING
<br />BLKNG BLOCK (BLOCKING)
<br />B.M.BENCH MARK
<br />BOT BOTTOM
<br />BSMT BASEMENT
<br />CG CORNER GUARD
<br />CL CENTERLINE
<br />CJ CONTROL JOINT
<br />CI CAST IRON
<br />CLG CEILING
<br />CLR CLEAR
<br />CMU CONCRETE MASONRY UNIT
<br />CO CLEAN OUT
<br />COL COLUMN
<br />CONC CONCRETE
<br />CONST CONSTRUCTION
<br />CONT CONTINUOUS
<br />CORR CORRIDOR
<br />CPVC CHLORINATED POLYVINYL
<br />CHLORIDE
<br />CS COUNTERSUNK
<br />CT CERAMIC TILE
<br />CVR COVER
<br />DP DAMP PROOFING
<br />DD DECK DRAIN
<br />DEMO DEMOLITION
<br />DEPT DEPARTMENT
<br />DET DETAIL
<br />DF DRINKING FOUNTAIN
<br />DIA DIAMETER
<br />DIAG DIAGONAL
<br />DIM DIMENSION
<br />DISP DISPENSER
<br />DL DEAD LOAD
<br />DN DOWN
<br />DR DOOR
<br />DS DOWNSPOUT
<br />DWG DRAWING
<br />E EAST
<br />EA EACH
<br />EC EXPOSED CONSTRUCTION
<br />EIFS EXTERIOR INSULATION
<br />FINISH SYSTEM
<br />EJ EXPANSION JOINT
<br />EL ELEVATION
<br />ELEC ELECTRICAL
<br />ELEV ELEVATOR
<br />EMER EMERGENCY
<br />ENCL ENCLOSURE
<br />EQ EQUAL
<br />EQUIP EQUIPMENT
<br />ETR EXISTING TO REMAIN
<br />EWC ELECTRICAL WATER COOLER
<br />EWS EMERGENCY WASH STATION
<br />EXH EXHAUST
<br />EXIST EXISTING
<br />EXP EXPANSION
<br />EXT EXTERIOR
<br />FOC FACE OF CONCRETE
<br />FOF FACE OF FINISH
<br />FOM FACE OF MASONRY
<br />FOS FACE OF STUDS
<br />FAS FASTEN,FASTENER
<br />FN FENCE
<br />FBD FIBERBOARD
<br />FGL FIBERGLASS
<br />FIN FINISH (ED)
<br />FFE FINISHED FLOOR ELEVATION
<br />FFL FINISHED FLOOR LINE
<br />FA FIRE ALARM
<br />FE FIRE EXTINGUISHER
<br />FEC FIRE EXTINGUISHER CABINET
<br />FHS FIRE HOSE STATION
<br />FPL FIREPLACE
<br />FP FIREPROOF
<br />FRT FIRE-RETARDANT
<br />FXT FIXTURE
<br />FLG FLASHING
<br />FLX FLEXIBLE
<br />FG FLOAT GLASS
<br />FLR FLOOR (ING)
<br />FD FLOOR DRAIN
<br />FL FLOW LINE
<br />FLUR FLOURESCENT
<br />FJT FLUSH JOINT
<br />FTG FOOTING
<br />FND FOUNDATION
<br />FR FRAME (D), (ING)
<br />FS FULL SIZE
<br />FUR FURRED, (ING)
<br />FUT FUTURE
<br />FW FILTERED WATER
<br />BID NOTES
<br />1.
<br />A.
<br />PROVIDE SEPARATE ITEMIZED LIST FOR ALL WORK (LABOR &
<br />MATERIALS & OVERHEAD) ASSOCIATED WITH THE FOLLOWING
<br />ITEMS:
<br />FLOOR FINISHES.
<br />B.CONC SLAB CUTTING & PATCHING
<br />C.CEILINGS.
<br />D.LIGHTING.
<br />E.HVAC.
<br />GENERAL NOTES (CONT)
<br />RESPONSIBILITY OF CONTRACTORS: EACH SUBCONTRACTOR AND
<br />THE GENERAL CONTRACTOR ARE RESPONSIBLE FOR
<br />WORKMANSHIP AND MATERIALS. EACH SUBCONTRACTOR AND THE
<br />GENERAL CONTRACTOR ARE RESPONSIBLE FOR THE CARE AND
<br />PROTECTION OF HIS OWN WORK AND MATERIALS.
<br />SITE SAFETY: EACH CONTRACTOR WILL ABIDE BY LOCAL AREA
<br />STANDARDS AND RELATED OSHA STANDARDS FOR THE
<br />PROTECTION AND SAFETY FOR THEIR EMPLOYEES ON SITE. THIS
<br />ARCHITECT AND HIS PROFESSIONAL CONSULTANTS WILL BE HELD
<br />HARMLESS BY THE OWNER, GENERAL CONTRACTOR AND RELATED
<br />AWARDED TRADES ON THIS PROJECT FOR ACCIDENTS OR INJURIES
<br />CAUSED OR ACCRUED ON THIS PROPERTY DURING THE
<br />PRE/ACTUAL/POST CONSTRUCTION PHASES OF THIS PROJECT.
<br />PILFERAGE: EACH CONTRACTOR WILL BE RESPONSIBLE FOR
<br />HIS OWN EQUIPMENT AND MATERIALS USED IN CONSTRUCTION
<br />INCLUDING THOSE ITEMS FURNISHED BY 7-ELEVEN, INC. AND
<br />DELIVERED TO THE JOB SITE, TO BE INSTALLED BY THE
<br />CONTRACTOR. 7-ELEVEN, INC. WILL NOT BE HELD LIABLE FOR
<br />STOLEN EQUIPMENT, MATERIALS OR DAMAGE OF THE SAME ON
<br />THIS JOB SITE.
<br />14.
<br />15.
<br />17.
<br />SCHEDULE OF WORK: THE CONSTRUCTION PROJECT MANAGER
<br />WILL STATE TO THE GENERAL CONTRACTOR DURING THE BIDDING
<br />PROCESS, THE REQUIRED NUMBER OF CALENDAR DAYS TO
<br />COMPLETE THIS WORK.
<br />GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF
<br />DEBRIS ACCUMULATED BY EACH TRADE. HOWEVER, EACH TRADE
<br />WILL KEEP THE JOB SITE CLEAN AND SAFE AT ALL TIMES, ALONG
<br />WITH A BROOM FINISH AT THE END OF EACH WORKING DAY.
<br />18.
<br />19.
<br />REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND
<br />PLUMBING DRAWINGS FOR ADDITIONAL GENERAL NOTES,
<br />ABBREVIATIONS AND SYMBOLS.
<br />20.
<br />MATERIALS AND SYSTEMS NOTES ARE TYPICAL IN NATURE AND
<br />APPLY TO MULTIPLE DRAWINGS. NOTES ON ANY ONE DRAWING
<br />ARE TO APPLY TO ALL OTHER SIMILAR MATERIALS AND SYSTEMS
<br />UNLESS NOTED OTHERWISE. THE GENERAL NOTES APPLY TO ALL
<br />THE CONSTRUCTION DOCUMENTS.
<br />21.
<br />ELEVATIONS REFERENCED ON ARCHITECTURAL DRAWINGS ARE
<br />FROM TOP OF SLAB UNLESS NOTED OTHERWISE.
<br />22.
<br />GENERAL CONTRACTOR TO COORDINATE FLOOR AND WALL
<br />PENETRATIONS WITH THE CONSTRUCTION PROJECT MANAGER,
<br />INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND
<br />PLUMBING.
<br />23.
<br />FOR THE PURPOSE OF THESE DRAWINGS AND SPECIFICATIONS,
<br />THE TERM "BY 7-ELEVEN" SHALL MEAN ITEM PROVIDED BY 7-
<br />ELEVEN, INC. AND INSTALLED BY CONTRACTOR AS PART OF THE
<br />WORK OF THIS CONTRACT. THE TERM "NOT IN CONTRACT" (NIC)
<br />SHALL MEAN ITEM PROVIDED AND INSTALLED BY 7-ELEVEN, INC.
<br />UNDER SEPARATE CONTRACT.
<br />24.
<br />DIMENSIONINGB.
<br />1.ALL DIMENSIONS ARE IN FEET-INCHES UNLESS NOTED OTHERWISE.
<br />2.DIMENSIONS GOVERN. DO NOT SCALE DRAWINGS.
<br />3.VERIFY DIMENSIONS IN THE FIELD BEFORE PROCEEDING WITH THE
<br />WORK. NOTIFY THE ARCHITECT OF RECORD OF ANY
<br />DISCREPANCIES.
<br />4.EXTERIOR WALLS ARE DIMENSIONED TO THE EXTERIOR FACE OF
<br />STUD / FOUNDATION UNLESS NOTED OTHERWISE.
<br />5.INTERIOR WALLS AND PARTITIONS ARE DIMENSIONED TO FACE OF
<br />STUD UNLESS NOTED OTHERWISE.
<br />6.DOORS ARE LOCATED BY THEIR JAMB OR THE CENTERLINE OF THE
<br />DOOR RELATIVE TO ADJACENT WALLS AND PARTITIONS. DOOR
<br />OPENINGS ARE DIMENSIONED TO THE STRIKE OR HINGE FACE OF
<br />THE DOOR FRAMES. ALL INTERIOR DOORS AT 5" FROM PARTITION
<br />WALL UNLESS NOTED OTHERWISE.
<br />MISCELLANEOUSC.
<br />1.SEAL JOINTS AROUND EXTERIOR DOORS, WINDOWS AND LOUVER
<br />FRAMES AND AT PENETRATIONS OF MECHANICAL, ELECTRICAL AND
<br />PLUMBING ELEMENTS TO PREVENT AIR AND WATER LEAKAGE.
<br />2.ISOLATE DISSIMILAR METALS EFFECTIVELY FROM EACH OTHER TO
<br />PREVENT ELECTROLYTIC ACTION.
<br />3.PROVIDE ACCESS PANELS AS REQUIRED FOR MECHANICAL AND
<br />PLUMBING VALVES.
<br />LIENS: ALL SUBCONTRACTORS AND THE GENERAL CONTRACTOR
<br />WILL DELIVER TO THE CONSTRUCTION PROJECT MANAGER, A
<br />COMPLETE RELEASE OF ALL CLAIMS ARISING OUT OF THIS
<br />CONTRACT.
<br />16.
<br />GENERAL CONTRACTOR TO COORDINATE WITH THE CONSTRUCTION
<br />PROJECT MANAGER FOR ALL ROOF PATCHWORK, REPAIR, AND/OR
<br />REPLACEMENT.
<br />25.
<br />7.
<br />8.
<br />9.
<br />10.
<br />11.
<br />1.
<br />2.
<br />3.
<br />4.
<br />5.
<br />6.
<br />ALL CONTRACTORS AND SUBCONTRACTORS WILL THOROUGHLY
<br />FAMILIARIZE THEMSELVES WITH THESE CONSTRUCTION
<br />DOCUMENTS AND WILL VERIFY EXISTING SITE AND CONDITIONS
<br />PRIOR TO SUBMITTING A BID. ALL SUBCONTRACTORS WILL
<br />PROVIDE ALL LABOR, SUPERVISION, AND MATERIALS AS REQUIRED.
<br />ALL WORK TO BE PERFORMED IN A GOOD AND WORKMANLIKE
<br />MANNER ACCORDING TO THE TRUE INTENT AND MEANING OF THE
<br />DRAWINGS AND SPECIFICATIONS.
<br />ALL SUBCONTRACTORS WILL PROVIDE A CERTIFICATE OF
<br />INSURANCE TO THE GENERAL CONTRACTOR PRIOR TO STARTING
<br />ANY WORK ON THIS PROJECT. CERTIFICATE OF INSURANCE
<br />CANNOT BE TERMINATED OR CANCELED WITHOUT 10 DAYS PRIOR
<br />WRITTEN NOTICE TO THE CONSTRUCTION PROJECT MANAGER.
<br />THIS ARCHITECT AND HIS PROFESSIONAL CONSULTANTS WILL NOT
<br />HAVE CONTROL OF AND WILL NOT BE RESPONSIBLE FOR
<br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
<br />PROCEDURES OR SAFETY PRECAUTIONS AND PROGRAMS IN
<br />CONNECTION WITH THE WORK ON THIS PROJECT OR FOR THE
<br />ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR
<br />ANY OTHER PERSONS PERFORMING ANY OF THE WORK ON THIS
<br />SITE, NOR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE
<br />WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT AND
<br />CONSTRUCTION DOCUMENTS.
<br />ALL CONTRACTORS WILL PROVIDE ADEQUATE BRACING AND
<br />SHORING TO ENSURE STRUCTURAL STABILITY OF THE BUILDING
<br />AND ALL RELATED BUILDING COMPONENTS, IE: STRUCTURAL
<br />WALLS, INTERIOR WALL ASSEMBLIES, ETC. DURING THE
<br />CONSTRUCTION PHASE OF THIS PROJECT.
<br />WORK WILL BE COORDINATED WITH ALL TRADES IN ORDER TO AVOID
<br />INTERFERENCE, AND AVOID OMISSIONS.
<br />ALL MATERIALS USED WILL BE NEW AND BEAR U.L. LABELS WHERE
<br />REQUIRED AND MEET APPROPRIATE N.E.M.A. STANDARDS.
<br />LAYOUT ALL PARTITIONS BEFORE BEGINNING CONSTRUCTION TO
<br />PREVENT ERRORS BY DISCREPANCY. ALL DRYWALL PARTITIONS
<br />WILL BE INSTALLED AS NOTED ON THE DRAWINGS.
<br />EACH SUBCONTRACTOR WILL AMEND AND MAKE GOOD AT HIS OWN
<br />COST, ANY DEFECTS OR OTHER FAULTS IN HIS WORKMANSHIP
<br />AND/OR HIS SUPPLIED MATERIALS.
<br />ALL CONTRACTORS WILL GUARANTEE ALL LABOR AND CONTRACTOR
<br />PROVIDED MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF
<br />OCCUPANCY.
<br />VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO ORDERING, CUTTING
<br />AND/OR INSTALLING MATERIAL, PRODUCT OR EQUIPMENT. IN THE
<br />EVENT OF ANY DISCREPANCIES, CONTACT THE CONSTRUCTION
<br />PROJECT MANAGER BEFORE PROCEEDING WITH THAT WORK.
<br />ANY ADDITIONS OR CHANGES TO WORK MUST BE AUTHORIZED IN
<br />WRITING BY THE ARCHITECT OR ENGINEER OF RECORD. NO
<br />ALTERATIONS WILL BE MADE ON THIS PROJECT EXCEPT UPON
<br />WRITTEN ORDER BY THE ARCHITECT OR ENGINEER OF RECORD.
<br />NO SUBSTITUTIONS OF ANY KIND FOR MATERIALS SPECIFIED ON
<br />THESE CONSTRUCTION DOCUMENTS IS ALLOWED. NO
<br />"EQUIVALENT" SUBSTITUTIONS WILL BE MADE, UNLESS DUE TO
<br />THE LACK OF AVAILABILITY OF THE ORIGINAL MATERIAL SPECIFIED
<br />AND APPROVED IN WRITING BY THE CONSTRUCTION PROJECT
<br />MANAGER AND THE ARCHITECT OR ENGINEER OF RECORD
<br />WEATHER CONDITIONS: CONTRACTORS WILL PROTECT ALL PARTS
<br />OF THEIR WORK FROM WEATHER DAMAGE DUE TO FROST, RAIN,
<br />HEAT, ETC. AND WILL MAKE GOOD TO THE SATISFACTION OF THE
<br />CONSTRUCTION PROJECT MANAGER AND GENERAL CONTRACTOR
<br />ANY PORTION OF THE WORK WHICH MAY HAVE BECOME
<br />DAMAGED.
<br />12.
<br />13.
<br />GENERALA.
<br />* GENERAL NOTES APPLY TO ALL CONSTRUCTION DOCUMENTS.
<br />- DOOR TAG
<br /> REF SHEET A6.0
<br />- ENLARGED
<br /> DETAIL
<br /> INDICATOR
<br />- GRID LINE
<br /> INDICATOR
<br />- WINDOW TAG
<br /> REF SHEET A6.1
<br />- WALL TAG
<br />- HEIGHT
<br /> ELEVATION
<br /> INDICATOR
<br />- NORTH ARROW
<br />- SPOT ELEVATION
<br /> INDICATOR
<br />- EQUIPMENT TAG
<br />- KEY NOTE
<br /> INDICATOR
<br />- SECTION CUT
<br /> INDICATOR
<br />- ELEVATION
<br /> INDICATOR
<br />- REVISION DELTA
<br />- ROOM TAG
<br />- KEY NOTE
<br /> INDICATOR
<br />- FINISH
<br /> INDICATOR
<br /> REF SHEET A6.1
<br />REFERENCE SYMBOLS
<br />XXXXXXXX
<br />XXX
<br />XX
<br />X
<br />X
<br />000A
<br />XX.X
<br />X'-XX"
<br />- FIRE EXTINGUISHER
<br />BID SET 5/26/20
|