My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
112
>
1600 - Food Program
>
PR0515586
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2021 8:13:50 AM
Creation date
11/18/2021 8:08:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0515586
PE
1626
FACILITY_ID
FA0012236
FACILITY_NAME
KELLEY BROS BREWING CO
STREET_NUMBER
112
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22102033
CURRENT_STATUS
02
SITE_LOCATION
112 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE 02 WORK <br />PHASE 01 WORK <br />jmwells design <br />713 washington street <br />kerrville, texas 78028 <br />830.890.8808 <br />jmwellsdesign@gmail.com/ <br />jackmwells@outlook.com <br />C O P Y R I G H T 2 0 1 7 <br />B I N D I N G . . .D:\Jack\My Documents\Drawings\LEER CONSTRUCTION\JANOON Banquet Remodel\Janoon Tenant Improvement Demolition.dwg-* <br />A1.0 <br />18.106 <br />Existing Conditions/ <br />Demolition Plan - <br />Lower LevelTenant Improvement112 East Yosemite AvenueManteca, CaliforniaPhase 2Janoon Banquet and Event HallDemolition Plan - Lower Level <br />1/8" = 1'-0"01PLAN <br />NORTH <br />1. THIS AND ANY OTHER DEMOLITION DRAWINGS ARE NOT INTENDED TO BE ALL INCLUSIVE AND <br />MAY NOT DEFINE THE SCOPE OF ALL DEMOLITION WORK REQUIRED FOR THIS PROJECT. <br />DEMOLITION DRAWINGS ARE SHOWN ONLY TO AID THE CONTRACTOR IN PREPARING FOR THE <br />BID AND PERFORMING THE WORK. CONTRACTOR SHALL EXAMINE ALL CONSTRUCTION <br />DOCUMENTS AND VISIT THE SITE DURING THE BIDDING PROCESS AS REQUIRED TO DETERMINE <br />THE FULL SCOPE OF THE WORK, ALL ITEMS ELECTRICAL, HVAC, PLUMBING, STRUCTURAL , <br />ARCHITECTURAL, FINISH ETC. THAT ARE NOT REQUIRED TO REMAIN, SHALL BE PART OF THE <br />DEMOLITION WORK REQUIRED TO CARRY OUT WORK AS SHOWN IN THE CONSTRUCTION <br />DOCUMENTS. <br />2. GENERAL CONTRACTOR TO REMOVE EXISTING CONSTRUCTION TO ACHIEVE A CLEAN SPACE <br />READY FOR NEW CONSTRUCTION. <br />3. VISIT SITE, EXAMINE EXISTING CONDITIONS AND CONDITIONS SURROUNDING SITE, DETERMINE <br />REQUIREMENTS UNDER WHICH WORK SHALL BE PERFORMED. <br />4. PROTECT AND MAINTAIN ALL ELEMENTS WHICH ARE TO REMAIN OR WHICH ARE TO REMAIN <br />UNTIL NEW PERMANENT INSTALLATIONS ARE COMPLETE. <br />5. TAKE PRECAUTIONS NECESSARY TO PROTECT ADJOINING SPACE FROM EXCESSIVE DUST AND <br />DEBRIS, AND ASSUME FULL RESPONSIBILITY FROM DAMAGES RESULTING FROM NEGLIGENCE OF <br />THESE ITEMS. <br />6. CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS IN PLACE. <br />7. APPLY PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE <br />OR DETERIORATION. <br />8. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS CONFLICT WITH <br />THE INTENDED FUNCTION OR DESIGN, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT <br />OF THE CONFLICT. SUBMIT REPORT TO THE DESIGN PROFESSIONAL IN WRITTEN DETAIL. <br />REARRANGE SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS. <br />9. REMOVE FROM BUILDING SITE ALL DEBRIS, RUBBISH AND MATERIALS RESULTING FROM <br />DEMOLITION. TRANSPORT AND LEGALLY DISPOSE OF OFF-SITE. <br />10. REMOVE AND DISPOSE OF ALL ABANDONED EQUIPMENT IN SPACE. <br />EXTERIOR DIMENSIONS SHOWN ARE TO FACE TO EDGE OF SLAB, ALL OTHER DIMENSIONS ARE TO <br />FACE OF FINISH UNLESS OTHERWISE NOTED. <br />GENERAL CONTRACTOR TO DISPOSE OF ALL WASTE DURING DEMOLITION IN ACCORDANCE <br />WITH ALL APPLICABLE JURISDICTIONS, CODES AND ORDINANCES. <br />GENERAL CONTRACTOR TO FIELD LOCATED AND DEACTIVATE IF, IN WALLS TO BE DEMOLISHED , <br />ALL EXISTING "HOT" ELECTRICAL WIRING PRIOR TO DEMOLITION. <br />CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE AND NOTIFY DESIGN PROFESSIONALS OF <br />ANY DISCREPANCIES IMMEDIATELY, PRIOR TO PROCEEDING. <br />ALL EXISTING WALL FINISHES THROUGHOUT THE SAID WORK (UNIT 15) SHALL BE REMOVED. <br />REFER TO OWNER FOR COORDINATION OF ALL PROPOSED MECHANICAL, ELECTRICAL AND <br />PLUMBING EQUIPMENT. <br />General Notes - Demolition <br />5401 N. Hickman Rd., Denair, Ca. 95316 <br />(209) 485-8620
The URL can be used to link to this page
Your browser does not support the video tag.