FC-
<br /> EQUIPMENT SCHEDULE SYMBOL LEGEND
<br /> RUBBER IN SHEAR ISOLATOR PAN STRAP -
<br /> P❑SITIVE FLOW ATTACH TO UNISTRUT AND 18 GAx2' WIDE
<br /> MARK MAKE/MODEL DESCN CFM HEAT COOL AMB ELECTRICAL ITEM VOLT ACCESS❑RIES WEATHERT❑P OR FLUE CAP FAN COIL W/ 3/8• M T EA HANGER
<br /> ESP" MBH SENS 102 PH SYMBOL ITEM ABBREV. 1/4'LAG SCREW
<br /> RECTANGULAR DUCT SIZE C❑UNTERFLASHING IN MASTIC AND BLOCKING LAGGED TO E)
<br /> TOT NET INSIDE DIMENSIONS1' CLEAR SPACE RAIN SEALED PLYWOOD - SLOPE PAN TO APEX
<br /> (E)HPFC-1 5 TON - 2000 - - - SEE NAME PLATE ON - _ = LINED DUCT WITH INSULATION BETWEEN JACK AN EXTEND PAN A MIN, OF 6'
<br /> 0.5 UNIT SEE DRAWING FOR THICKNESS FLUE/DUCT PAST FAN COIL EDGES 3/4' PIPE CONNECTION ARCHITECTURE
<br /> FLEXIBLE SUPPLY DUCT, CLASS 1 HANG PAN FROM FAN COIL RIVETED AND SOLDERED TO
<br /> — — — — — FLEXIBLE RETURN DUCT, CLASS 1 FINISH R❑❑FING - ROLL UNISTRUT W/ 1' WIDE 24 BASE OF PAN - CROSS
<br /> UP JACK AND ATTACH GA STRAP AT EACH CORNER BREAK PAN T❑ DRAIN
<br /> (E)OHP-1 5 TON - - - - - SEE NAME PLATE ON - VD - VOLUME DAMPER, REQUIRED NONE UNDER C❑UNTERFLASHING 12•
<br /> UNIT FD - FIRE DAMPER FDR 1325 EI Pinal Drive, Suite D4
<br /> ROOF JACK - 24 GA
<br /> VD FSD - FIRE SMOKE DAMPER FSD NAIL TO ROOF W/ MIN ENLARGED DETAIL 'A' Stockton, CA. 95205
<br /> HPFC-2,3 CARRIER FOUR 2000 - 44,5 80 FLA 6.0 208 1 PH WT=165# CSFD - CEIL. FIRE SMOKE DAMPER CSFD 4-2'104 NAILS
<br /> FE4ANB006000 POSITION FAN 0.5 54.2 65 HTR 28.9, 44.7 MCA, 50 MD DM - MOTORIZED DAMPER MD DMOSA DUCT (209) 662-4874
<br /> COIL MOCP DUCTWORK - GI SPIRAL PIPE VD EFRIGERANT LINES - apexplanning@hotmall.com
<br /> ACCU-2,3 CARRIER AIR COOLED COND NA NA 54.2 80 FLA 8.4 460V 3PH SEE PLANS FOR SIZES
<br /> - MOTORIZED 24v 1-1/2' DUCT LINER
<br /> 24AHA460 UNIT - 65 MCA 10.3, FUSE 15 WT=260# TURNING VANES TV SEE STRUCT DWGS DAMPER, SR - 1-1 SA AND LI
<br /> RA
<br /> 13 SEER
<br /> FOR TRUSSES INTERLOCK W/ PLENUMS R=8,2
<br /> 300 FIRST LETTER CEILING RETURN DUCT FAN Steven Anthonyorres II
<br /> RFC-1A IMPERIAL BROWN FAN COIL 1400 - - - FLA 1 .5 115V 1P POWER FROM RCU-1 WT=70# CS-4 LOCATION: FLOOR 2x BLOCKING BY Y
<br /> LSC104ATXV6K = 10,3 = - ^ ® 12x12 WALL Fc- Architect # (32553
<br /> RFC-1B IMPERIAL BROWN FAN COIL 1400 FLA 1 .5 115V 1PH POWER FROM RCU-1 WT=70# ❑ CS-4 SECOND SERVICE:
<br /> SUPPLY FLUE ❑R ROUND - UNIT
<br /> LINE/4,2'OMNDTRAP
<br /> LSC104ATXV6K - 10.3 - I RETURN EXH, DUCT
<br /> EXHAUST VEL 500 FPM SEE PLUMB DRAWINGS
<br /> RCU-1 IMPERIAL BROWN FAN COIL 1400 - 33.7 - FLA 16.8 208 3PH WT=320# NUMBER-TYPE: n L J
<br /> SEE SCHED. V SEE 'A' 7LOCKING TOP
<br /> M❑H050X63CFMT - - -127 MCA, 45 MOCP CR-1 300 - CFM, CUBIC FEET PER MINUTE 4-12//0 DUCT T H R U R❑❑E 4 f SUPPORT PLENUM
<br /> 12x12 - GRILLE NECK SIZE IN INCHES PROPERTY OWNER
<br /> PROVIDE VD'S AT ALL WYES AND TAPS DETAIL A O
<br /> SUPPLYING GRILLES AND REGISTERS FOR IVI 4 GA GI AUX,
<br /> CE-1 AIR BALANCING PER T-24. DUCT SUPPORT DRAIN PAN - LAWRENCE WIGHT
<br /> WYE/ELB❑W/SAMCNA
<br /> O THERMOSTAT, UNIT NO. — LOW LOSS 'T 'A' OR 'B'
<br /> FITTING BEL❑W 30" WIDE SERVICE 3/4" OVERFLOW
<br /> PLATFORM IN FRONT DISCHARGE IN AN
<br /> DIFFUSER/REGISTER SCHEDULE © ❑N © BYPASS, NITESTAT, CLOCK ❑F FANC❑IL OBSERVABLE
<br /> L❑CATI❑N
<br /> MARK MAKE DESCRIPTI❑N FACE BLOW DAMPER COLOR REMARKS ABBREVIATIONS W/OR WO SYMBOLS
<br /> MODEL MOUNT OPERATING WT — WITH W/ FANC❑IL/AIR HANDLER INSTALLATI❑N DETAIL
<br /> ri
<br /> CS-4 TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE BRANCH/BRANCH — WITH OUT WO/ vD L 10' MAX FLEX DETAIL ��o CONTRACTOR
<br /> TDC-3-A4 SUPPLY T-BAR BRANCH DUCT
<br /> CS-3A TITUS CEILING BLADE 3-WAY WYE WHITE INSTALL VD IN WYE BRANCH BRANCH —
<br /> DOWN DN CS- 4A.CS-1 - VD FURNISH AT ALL SUPPLY
<br /> TITUS OR EQUAL, REGISTERS IN WYE ❑R TAP, DISC❑NNECT - RUN
<br /> TDC-6-A3 SUPPLY SURFACE BRANCH DUCT WHITE FINISH, N❑ DAMPER SHALL HAVE T-STAT WIRE IN BOB LEONARD AND ASSOC.
<br /> GALVANIZED SHEET METAL GI OBD, SIZE AS LOCKING QUADRANT ON 1" SEAL TIGHT 1325 EL PINAL DRIVE, SUI D-4
<br /> + CR-1 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD IN WYE BRANCH/BRANCH — ABOVE FINISHED FLOOR AFF INDICATED ON STANDOFF, 3/8'0 DIAMETER CONDUIT TO Accu Cu—
<br /> RETURN CA. 95205
<br /> RETURN T-BAR BRANCH DUCT FLOOR PLANS SHAFTS. LIQUID LINE WITH LIQUID
<br /> LINE DRIER AND MOISTURE
<br /> CE-2 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD IN WYE BRANCH/BRANCH — BELOW FINISHED FLOOR BFF PLYWOOD/SKIP INDICATING SIGHT GLASS AT
<br /> EXHAUST SURFACE BRANCH DUCT
<br /> — BELOW FINISHED CEILING BFC HEFTING ROOF CONDENSING UNIT
<br /> ATTACH TO (E) JOISTS 2-PAIR 18 GA WIRE
<br /> CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH — ABOVE FINSHED CEILING AFCWITH 1-#10x1-1/2" - RUN IN 3/4'
<br /> THE BORDER SPECIFIED IN THE SCHEDULE FOR LAYIN DIFFUSERS AND 2x2 " ANGLE FASTAP SCREW, CONDUIT TO Accu
<br /> NEW DUCTWORK -ATTACH TO J❑IST (E) ROOF LINE
<br /> SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID SYSTEMS. — — W/2-1/4'Ox2' LAGS -
<br /> RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN EMBED 1-1/2' MIN
<br /> -X-X ><->(- DEMOLITION TO BE REMOVED TBR INVERTED SUCTION TRAP -
<br /> MOUNTED IN WALLS
<br /> DUCT STRAP �� UNITS 20' OR HIGHER THAN FC
<br /> DUCTWORK EXISTING (E) THREAD ROD WITH PER CM
<br /> POINT OF CONNECTION POC SQ 1-h'x1-h'xh'
<br /> WASHER TO SUPPORT
<br /> EXHAUST E A N SCHEDULE CUT OFF POINT COP STRAP ❑R \ 3/4' CONDUIT
<br /> T❑ MOTORIZED
<br /> DAMPER CMD) MD-1
<br /> FURNISHED BY OTHERS FBO 1-h'x24 GA
<br /> MARK MAKE MODEL DESC, CAPACITIES ELECTRICAL ACCESS❑RIES AND OPERATING WT# BELLY BAN
<br /> CFM "ESP RPM SON ITEM QTY VOLT PH CONTROLS — UP THROUGH ROOF UTR AROUND PIPE 'A' DUCT SUPPORTcc_ F_ 11ARCO CONVENIENCE
<br /> CEF-1 BROAN L100 CEILING 100 0,5 850 5.4 100 WATT 120 10 BDD, BS, SPEED 8# — UNLESS OTHERWISE NOTED UON PLYWOOD/SKIP __--EQUIPMENT IN STORE REMODEL
<br /> EXHAUST FAN CONTROLLER AND SHEETING R❑❑ GENERAL
<br /> C CONDENSATE, OVERFLOW C, OF 2x2x�" ANGLE
<br /> DISCONNECT - ATTACH TO 2908 Benjamin Holt Drive
<br /> HWS HEATING WATER SUPPLY, RETURN HWS,HWR J❑IST/TRUSS Stockton, CA. 95207
<br /> CEF-2 BROAN L400 CEILING 400 0.5 850 5.4 300 WATT 120 10 BDD, BS, SPEED 40# / J'x1_1/2. STUB CONDUIT 6'
<br /> EXHAUST FAN CONTROLLER AND CHWS CHILLED WATER SUPPLY, RETURN CHWS,CHWR LAG BOLT - ABOVE MEZZANINE
<br /> DISCONNECT MACHINE BOLT MB EMBED 1' MIN
<br /> 3/4" CONDUIT IN WALL---
<br /> REF-1 GREENHECK ROOF 200 0.15 1550 4.2 1 6HP 120 1 0 BDD, BS, SPEED 30# DOUBLE NUTTED ALL
<br /> / 3/8"x2" LAG BOL THREAD ROD WITH SQ
<br /> CUE-065-HP- EXHAUST FAN CONTROLLER AND G,LPG NATURAL GAS, LPG LINE G, LPG EMBED PINT MOUNT T-STAT 48' AFF
<br /> VGD DISCONNECT
<br /> JOIST/TRUSS -h'xl-h'x�' WASHER
<br /> BDD - BACK DRAFT DAMPER, LOW LEAK — TO SUPPORT STRAP AWAY FROM HEAT T
<br /> ALL THREAD ROD ATR SEISMIC
<br /> x18 PRODUCING LOCATION
<br /> BS - BIRD SCREEN -LOCATE EVERY BRACE40' 1-h'x24 GA BELLY C❑ORDINATE L❑CATI❑N
<br /> OUTSIDE AIR OSA AND AT CHANGES IN AND AROUND PIPE
<br /> HVAC Notes FEET PER MINUTE FPM WITH OWNER
<br /> DIRECTI❑N OF PIPE - DUCT IS EXPOSED
<br /> —
<br /> 1. Furnish and install all ductwork in accordance with the latest editions of CMC (SMACNA duct construction standards), LATERAL BRACE 80'
<br /> 2. All pipes, ductwork and conduit shall be installed and seismically braced per SMACNA's Seismic Restraint Guidelines, OSHPD pre-approval #R0010, DUCT TEMPERATURE SENSOR DTS ❑C AND AT LATERAL BRACE ❑F DIRECTION CHANGE-
<br /> 3, All contractor furnished equipment installation and startup instructions shall be kept with the piece of equipment in weatherproof pouches — FLEXIBLE DUCT CONNECTOR FC 40' ❑C AND AT CU—, E C— R E E R I G E R A T I❑N/T S T A T PIPING
<br /> until final inspection, After final inspection, three sets of operation, installation, maintenance and start-up instructions shall be given to - CHANGEOF DETAIL
<br /> the Owner for each piece of equipment per the Co. Green Building Code, All equipment shall be installed, isolatedFLEX DUCT and supported per the DIRECTION MO
<br /> manufacturer's written instructions, — STEAM PIPE S
<br /> 4. All Fire and Fire Smoke Damper installation instructions shall be made available to the inspecting authority for their review, FUSED DISCONNECT
<br /> 5. All penetrations through fire rated assemblies shall be fire stopped and sealed with a material that meets or exceeds the `T' rating of — STEAM CONDENSATE SC 'B' SEISMIC ANCHORAGE DETAIL1 10V, 1 PH FURNISHED BY ELECTRICAL
<br /> the assembly penetrated, Materials to be used for sealing shall be coordinated with the General Contractor to provide one brand onsite, CONTRACTOR (EC).
<br /> 6, Install all pipe and duct insulation materials per T-24 requirements, All material to be installed shall meet CBC flame and smoke requirements
<br /> MAKEUP WATER CW DUCT D U P P❑RTS 1 10V, 1 PH AMPERAGE SPECIFIED ON
<br /> per note 11, SHUT OFF/BALL VALVE BV DETAIL M O UNIT NON-FUSED ELECTRICAL DRAWINGS.
<br /> 7, All work on this project shall conform to the following codes: DISCONNECT. I� 208V, 3PH
<br /> DUCT SMOKE DETECTOR DSD MOUNT IN DUCT AMPERAGE SPECIFIED E ::P
<br /> 2016 CBC BELOW ROOF WHERE ON DATA TABLE.
<br /> 2016 CPC AIRPRODUCTS DMT HVAC DETAILS AND NOTES
<br /> FLEX DUCT T❑ MAIN RUN T❑ BE
<br /> SHOWN U
<br /> 2016 CMC MIN 3'2' LENGTH S❑ THAT THE 208V, 240V SYSTEM CONTROL
<br /> SL-20O C L TRNASFORMER
<br /> DUCT SIZE AND INSULATION ISC❑NNECT C42' FOR 480V PHOTELECTRIC R YI O W Y1
<br /> 2016 CEC VALUE IS SHOWN ON ALL DUCTS SYSTEM) SMOKE DETECTOR NCGO
<br /> 2016 CALIFORNIA GREEN BUILDING CODE, AND MAX LENGTH TO BE 10'0' FOR
<br /> ❑SHPD AND 5'0" FOR ALL OTHERS, CL
<br /> MD-11 MD OHP-
<br /> 8, All wye branches connected to a diffuser, grille or register shall have a manual volume damper installed in the wye branch, ❑BD's shall only 12' GI DUCT EXTENSION OSA DAMPER
<br /> ABOVE CEILING IL-0
<br /> be used when wye branches will be installed over inaccessible ceiling areas or in the slab of the building, Dampers shall be fabricated of INSULATION, FLEX LOW VOLTAGE
<br /> the same gauge as the duct with 1" standoff, locking quadrant, and handle. Fasten red ribbon to handle to mark location. DUCT TO MAIN RUN ELECTRICAL PANEL OR UNIT WIRING
<br /> DISCONNECT 18 GA.
<br /> 9. All gas pipe to be schedule 40 with screwed fittings, All air conditioning/refrigeration condensate drain lines shall be schedule 40 PVC run GRN LED 0000
<br /> PP P pipe 9 Y 9 CAN24 GAUGE GI REGISTER DEDICED ATED CLEAR
<br /> EDE WORKING SPACE HORNESTROBE (D 7 STRAND C.')to the an a roved rete tor, Set I e on redwood blocks with 24 a GI cover unless otherwise shown different: on drawin s, T R Yi D w YiRESET T-STAT WIRE S
<br /> 10, Provide smoke detectors in the supply air duct on all units when the aggregate cfm exceeds 2000 cfm of all equipment serving a room or SCREW CAN T❑ IN FIR ❑F PANEL, Q HONEYWELL VISI❑N PR❑ G G Ci
<br /> more than one room and the room has no direct exits to the exterior, Duct smoke detectors shall be installed after the supply fan BLOCKING - 4 TOTAL
<br /> FLOOR/ROOF T❑ STRUCTURAL FIRER REMOTE FURNACE/HEAT PUMP PROGRAMMABLE
<br /> before an branch takeoffs, When more than one unit serves a TI space and the aggregate cfm of the units serving the TI space EMBER ABOVE PER NEC110-16 & ANDTESTLED'SCH THERMOSTAT WITH AUTOMATED DEMAND
<br /> Y P9 p 384-4, VERIFY ALL POSSIBLE a
<br /> exceeds 2000 cfm, all HVAC equipment shall have duct smoke detectors, All duct smoke detectors shall be wired to shut down all units when CONFLICTS WITH OTHER TRADES RESPONSE FUNCTION SERIES Y AND W
<br /> a sin le unit alarms, When fire detection or alarm systems are provided for the buildin all smoke detectors includin thoseitalor led fPRIOR TO ROUGHING IN THE TERMINALS TO MATCH UNITS NG: M29759'
<br /> g Y g' g ns
<br /> PANEL BOARD OR DISCONNECT, 1)REN. 6-30-16 Q
<br /> fire smoke dampers shall be supervised by such systems per 608.1 CMC. Such connections shall be shown on the deferred fire alarm 18 GA. 4 PAIR T-STAT WIRE - RUN IN J" CONDUIT
<br /> submittal, FROM HPFC- TO OHP-, PROVIDE 4x4x2" J-BOXES �� �CNgN% PO�
<br /> 11. Such connections shall be shown on deferred fire alarm submittal. EVERY 100' AND EVERY 360 NEC CHANGE
<br /> ERN DIRECTION
<br /> OF C F
<br /> 12. All exposed ductwork shall be GI pipe and fittings. Line all rectangular duct with insulation with the R-value listed in T-24 for the location LREGISTER - SEE PLAN ELECTRICAL PANEL/DISCONNECT 6
<br /> ENTS
<br /> of the duct (attic, conditioned or outside), All duct materials from insulation to mastics including but not limited to sheet metal, insulation, FOR SIZES - PROVIDE DETAIL F—, A C C U— C❑N T R❑L WIRING r,3
<br /> Liners, plastics, rubber cements, latex, etc, shall be made of materials with a Flame spread <=25 and smoke <=50, 1/2' SOUND LINER IN Q13. It is the res onsibilit of the Mechanical Contractor to coordinate the installation of his work includin e ui ment substitutions with the REGISTER CAN DETAIL MOP Y 9 q P ��M
<br /> LINE VOLTAGE WIRING BY EC
<br /> other trades including but no limited to electrical, fire sprinkler, framing and plumbing, LINE VOLTAGE WIRING BY MC
<br /> 14. Insulate all ductwork per the T-24 energy requirements found in the T-24 compliance report. All ductwork shall be tested for leaks with Q BASE LOW VOLTAGE WIRING BY MC
<br /> a maximum static pressure in the duct of 1,0 H', maximum leakage shall not exceed 4% of the total supply and return air volumes. CEILING REG DETAIL NOTE APPLIES TO ALL DETAILS
<br /> 15. All economizer, thermostat and fan systems shall be tested per T-24 for compliance with the T-24 report and the appropriate forms 1/2' DIAM, REV.# DATE ISSUED DESCRIPTION
<br /> indicated in the T-24 report shall be provided and signed by the Contractor prior to project close out and the HERS reports loaded up DETAIL M O HIL TYP KB2) Accu 3/8' DIAM, HILTI
<br /> to the appropriate CHEERS or CAL-Certs hostingservice, BOTTOM ❑F KB-III EMBED
<br /> 2-1/2' MIN, (1)
<br /> 16. Contractor shall label all equipment with unique identification using plastic engraved plates with 1/2" tall lettering indicating the equipment UNIT EACH CORNER (2) v
<br /> number and state the areas served by the equipment, See specifications on dwgs, TOTAL
<br /> 17. All flex duct will be stretched as tight as possible and as per manufacturers listing to avoid all kinks and sagging, .-4' THICK
<br /> 18. All smoke detectors shall be tested as required with an approved smoke system per the City of Stockton's standards in the presence of HOUSEKEEPING
<br /> PAD-BY GC
<br /> the inspector or fire Marshall, BASE MATERIAL
<br /> 19. All systems shall require an air balance report upon final inspection. Submit reports on NEBS or NABC forms an independent certified air
<br /> balance showing system has been balanced and OSA quantities set to that shown on drawings, 7
<br /> 20, Condensate drain lines installed in direct or indirect sunlight shall be UV resistant CPVC or PVC pipe and shall be painted to protect from ACCU MOUNTING
<br /> UV radiation, APEX PROJECT-15-1121. Seal all joints and seams with DP-1010 duct sealer, DETAIL M O
<br /> T-24 MECH AND PLUMBING MANDATORY FEATURES DATE: 2-15-2016
<br /> 1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY PER SECTI❑N 1102 - SEE SCHEDULES ON M-0.
<br /> 2, HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTI❑N 1202 FOR THERMOSTATS AND DDC CONTROLS - SEE DETAILS ON MO.
<br /> 3, SERVICE WATER HEATING SHALL COMPLY WITH SECTION 110,3 GDMD ENGINEERING, INC
<br /> 4, USE OF PIL❑T LIGHTS ON HVAC, GAS C❑❑KING POOL AND SPA HEATERS PROHIBITED PER SECTION 110,5
<br /> 5. LAVAT❑RIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP AT 110°F OR LESS PER SECTION 110,3 - SEE PLUMBING SCHEDULE Mechanical and Safety Engineers
<br /> 6. VENTILATI❑N REQUIREMENTS PER 120,1,b,c&d M-1 AIR BALANCE 212 W Pine,1,bSt, Ste 4 M O
<br /> 7. NATURAL VENTILATI❑N PER 120 ,1 N/A
<br /> 8. CONTROLS SHALL MEET REQUIREMENTS PER 122. SEE M-0 AND NOTES. Lodi, Ca 95242
<br /> 9. SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See schedules on M-0 Ph 209-367-0899
<br /> 10, ISOLATION AREA DEVICES PER 122,8 N/A Fax 209-367-0898
<br /> 11, PIPE INSULATI❑N PER 120,3,8 SEE NOTES, TABLE 120,3-A
<br /> 12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE M-0, NOTES AND SPECIFICATI❑NS E-mail:gdmdengrinc@sbcglobal.net Copyright APEX
<br /> 13. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END OF PROJECT PER SECTI❑N 120,5, 120.7 AND 120.8 - SEE T24 DRAWINGS FOR FORMS REQUIRED
<br /> (1-17) TO BE SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND PLUMBING PIECE OF
<br /> EQUIPMENT,
<br />
|