Laserfiche WebLink
PLUMBING FIXTURE SCHEDULE PLUMBING LEGEND E) <br /> MARK MAKE/MODEL TRIM ACCESS❑RIES <br /> 1 GALLON EXP TANK FOR <br /> SYMBOL DESCRIPTION SYMBOL DESCRIPTION THE HOT WATER HEATING APEX <br /> WC-1 K❑HLER 1,28 GPF 17" ADA TANK TYPE ELONGATED WATER CLOSET, 495-2121-00 BENEKE 523 ELONGATED /SYSTEM <br /> K-3609 POLISHED CHROME HANDLE, BRASSCRAFT KTSR17FC STOP, B1-12DLF SEAT, NON LOCKING / <br /> HOSE, WAX RING, RIGHT HAND 12"RI, LOOSE KEY, COLOR BY COVER, RI PER ADA ---CW COLD WATER LINE BALL VALVE <= 4", GATE VALVE>4" FLUE ARCHITECTURE <br /> ARCHITECT, REQT'S PLUG AT FINISH GRADE 1• HWS----HW HOT WATER LINE �0� BALANCING VALVE OR FLUSH W/ FLOOR 11 Cws <br /> L-1 K❑HLER WALL HUNG LAVATORY, ZURN 26915-XL-F 0.5 GPM WF FAUCET, ZURN RI PER ADA REQUIREMENTS 1325 EI Pinal Drive, Suite D4 <br /> K-2005 ZW1017 MIXING VALVE, DEARB❑RN 760W-1 GRID DRAIN & PVC P-TRAP IIIIIIIIIII TD TRENCH DRAIN GAS COCK sov Stockton, CA. 95205 <br /> VITR❑US BRASSCRAFT KTSR17FC STOPS & B-16A SUPPLY HOSES PLUMBEX 2002 (209) 662-4874 <br /> CHINA P-TRAP & ANGLE STOP INSULATI❑N. COLOR BY ARCHITECT. SS SANITARY SEWER AC ABOVE CEILING SINVERT <br /> CONCRETE Box LABELED SEWER TO x3' LAG BOLT <br /> ADVANCE-TAB n n n OR' TO BLOCKING IN WALL apexplanning@hotmail.com <br /> L-2 10 x14 x5 SINK BOWL WITH SOAP DISPENSER, PAPERTOWEL GL GREASE LINE BFF BELOW FINISHED FLOOR BRASS CLEANOUT BOX EMBED 2• <br /> CO DISPENSER, 2 WELDED 7-3/4" HIGH SIDE SPLASHES, SPLASH MOUNTED IN FINISHED FLOOR <br /> 7-PS-80/7-P 4"O,C, GOOSENECK FAUCET W/ AERATOR AND BUILT-IN OVERFLOW, 18 GAx2' WIDE STRAP <br /> —HV HORIZONTAL VENT AFF ABOVE FINISHED FL❑❑R LOCATE 12' FROM <br /> S-17 TOP OF TANK Steven Anthony Torres II <br /> TWV-1 WILKINS TEMPERING HOT WATER VALVE FOR PUBLIC RESTR❑❑MS, 3/4" MNPT, SET AT 120 DEG F MAX SD— STORM DRAIN LINE BFG BELOW FINISHED GRADE N SWEEP 'L' 3/4' TPR LINEArchitect # C32553 <br /> DEGREE TO FLOOR SINK(ZURN) PR❑VIDE UNIONS ❑N EACH SIDE ❑F VALVE, TEMPERATURE C — CONDENSATE DRAIN MV MIXING VALVE34-ZW1017M <br /> — SEE PLAN 1/2'G WITH <br /> 3CS-1 ADVANCE 3 COMPARTMENT POT SINK COMPLETE WITH ADVANCE TABC❑ 15" SWING REFER TO KITCHEN —MA — MEDICAL/DENTAL AIR WC WATER CLOSET FOR SIZES 6' DRIP LEG <br /> TABC❑ SPOUT, 16x20 SINK BASINS, 2-24 DRAIN BOARDS DRAWINGS FOR EXACT SIZE SEE PLUMBING FLOOR <br /> 1CS-1 ADVANCE 1 COMPARTMENT POT SINK COMPLETE WITH ADVANCE TABC❑ 15" SWING REFER TO KITCHEN —V— VACUUM UR URINAL PLAN FOR SIZE <br /> TABC❑ SPOUT, 16x20 SINK BASINS, 24" DRAIN BOARD DRAWINGS FOR EXACT SIZE V, VR, VTR VENT, VENT RISER, VENT THRU ROOF L LAVATORY SECURE BASE r0 DECK w/ 3/8•x3• PROPERTY OWNER <br /> MS-1 K❑HLER ENAMELED CAST IR❑N MOP SINK, CORNER UNIT W/INTEGRAL STRAINER LAG BOLTS, 2x2xl/4' <br /> — SANITARY SEWER DROP S SINK CLIPS - EMBED LAGS <br /> —SSD 2 - WAY CLEANOUT E A N ❑ U T „ <br /> WITBY AND DRAIN, PIPE, ZURN Z-841M1-RC-WHK-SH FAUCET 5 2• INTO BLOCKING � DRAIN LAWRENCE WIGHT <br /> K-6710 RWL RAIN WATER LEADER MS SERVICE/M❑P SINK DETAIL PD <br /> S-1 JUST SL-ADA 19x21 17 GA STAMPED STAINLESS STEEL (SS) SINK W/JDP 35 DRAINS, REFER TO ARCH DRAWINGS <br /> 1921SS REAR ZURN Z-824S0-XL-23M-HS-HS 1.5 GPM SINGLE LEVER FAUCET & HOSE. FOR ADA MOUNTING HEIGHT RD ROOF DRAIN DF DRINKING FOUNTAIN PLUG AT FINISH GRADE WH-1 MOUNTING <br /> DRAIN ADA COMPLIANT WITHOUT AERATOR, BRASSCRAFT KTSR17FC STOPS & OR FLUSH W/ FLOOR <br /> B-16A SUPPLY HOSES PLUMBEX 2002 P-TRAP & ANGLE STOP AD AREA DRAIN FHS FIRE HOSE STANDPIPE DETAIL �LV <br /> INSULATI❑N, CB, DI CATCH BASIN (DROP INLET) INV INVERT ELEVATI❑N <br /> FS-1 ZURN 12x12 SANI-FL❑R RECEPTOR W/ALUM DOME STRAINER, MOUNT LIP 1" - CONTRACTOR <br /> Z-1900-P-2- AFF, 2" OUTLET CO CLEAN OUT FG FINISH GRADE CONCRETE BOX LABELED SEWER <br /> OR' <br /> 32 BRASS CLEANOUT BOX BOB LEONARD AND ASSOC. <br /> TD-1 WATTS SL❑PING TRENCH DRAIN WITH LEVEL TOP, 3" OUTLET, STAINLESS I� WC❑ WALL CLEAN OUT P❑INT OF CONNECTION IN FINISHED FLOOR <br /> P1-AA-NXX STEEL PERFORATED DRAIN T❑PFC❑ FLOOR CLEAN OUT AD ACCESS DOOR - SEE SCHEDULE FOR TYPE 1325 EL PINAL DRIVE, SUI D-4 <br /> TRENCH STOCKTON, CA. 95205 <br /> DRAIN (11111— YC❑ YARD CLEAN OUT CI CAST IR❑N <br /> AD-1 KARP DSC GRAY PRIMERED ACCESS DOORS - SEE DRAWINGS FOR TYPE OF PAINT TO MATCH FD FLOOR DRAINCENTER LINE PVC C❑NNECTI❑N <br /> 214M LOCKING MECHANISM, UNLESS OTHERWISE NOTED, FURNISH DOORS ARCHITECTURAL SURFACES, D❑ NOT ❑VERTIGHT4AIR <br /> WITH SLOTTED 1/4" LOCKS, MIN SIZE IS 12x12. FS FLOOR SINK HDR HEADER AT AC U <br /> SEE PLUMBING FLOOR <br /> TP-1 PPP, INC. PR❑VIDE DU- ACCESSORY WHERE PRIMER IS USED FOR MORE THAN MOUNT IN WALL BEHIND PLAN FOR SIZE <br /> PR-500 ONE DRAIN, AD-1 WITH SOV, TP TRAP PRIMER VALVE DN DOWN END OPEN TOC❑IL L❑CATI❑N <br /> PRIME RITE CW, D, R — C❑LD WATER (DR❑P) (RISER) MBH THOUSANDS OF BTU PER H❑UR 3 - WAY CL- EAN ❑ UT 63/4" PVC <br /> FD-1 ZURN ZN415 TYPE B STRAINER FL❑❑R DRAIN, 2" OUTLET, TRAP PRIMER FITTINGWH-1 STATE 30 GALL❑N ELECTRIC HEATER, 4500W @240V, 1PHHW,D,R,RT— HW SUPPLY (DR❑P) (RISER) (RETURN) NIPC N❑T IN PLUMBING CONTRACT DETAILES6-30-DORY <br /> THW—T — TEMPERED HOT WATER (115° F) HW HAND WASH STATION FURNACE <br /> ET-1 STATE TW-5 1 GALLON ACCEPTANCE VOLUME <br /> —G, LPG — NATURAL GAS (PR❑PANE)<SPSI HS HOSE STATI❑N <br /> HWCP-1 B&G BRONZE BRONZE TRIM AND BRONZE IMPELLAR, SNAP ON AQUA STAT, SNAP ON INSTALL CIRCUIT SETTER <br /> CIRCULAT❑R, TIMECL❑CK, 120V, 1/12 HP, 2 GPM@12' HD. IN LINE, SET AT 120°F — HPG — HIGH PRESSURE GAS(PROPANE) >5PSI HWG HOT WATER GENERATOR <br /> NBF-10S/LW ARCO CONVENIENCE <br /> — CA — COMPRESSED AIR BV BALL <5", BUTTERFLY >5" VALVE <br /> HB HOSE BIBB —SCW — SOFT COLD WATER LINE SHEET METAL COLLAR - A INTEGRAL GAS STORE REMODEL <br /> FILL OPENING W/SIKA FLEX VALVE A D 2908 Benjamin Holt Drive <br /> © UNDER PLUMBING CONTRACT — SHW — SOFT HOT WATER LINE FOR WATERTIGHT SEAL 4# LEAD JACKET FLEX As EMBLY Stockton, CA. 95207 <br /> - <br /> HOT MOP I <br /> TO <br /> OF <br /> PLUMBING NOTES: SOV SHUT OFF VALVE EXTEND UPN INTOOCOLLAR <br /> DRAW BAN 'OR' <br /> ALL WORK SHALL CONFORM TO THE FOLL❑WING CODES: RUBBER RING FLASHING <br /> AND CLAMP FOR METAL ROOFS W/ GAS LINE - SEE <br /> HOSE CLAMP AROUND PIPE LAN INE SIZES <br /> FIXTURE CONNECTION SCHEDULE PULL COLLAR OVER CLAMPFOR <br /> 2016 CBC 6' DROP LEG AND ROUTING <br /> 2016 CPC PLUMBING SANITARY WATER FINISHED ROOF — SEE ARCH LINE SIZE <br /> 2016 CMC FIXTURE SEWER VENT COLD HOT 1/4'-1/2' DWGS — FALSHING INSTALLATION SHALL <br /> WATER CLOSET FV 3" 2" 1" - MATCH ROOFING MANUFACTURERS n <br /> 2016 CEC DETAILS TO MAINTAIN WARRANTY GAS AND COND, PIPING L <br /> WATER CLOSET FT 3" 2" 1/2" - <br /> CONTRACT❑R SHALL KEEP ALL INSTALLATI❑N INSTRUCTI❑NS FOR PLUMBING FIXTURES, ACCESS DOORS, SEALING MATERIAL, URINAL FV 2" 1-1/2" 3/4" - TTACH SUPPORT TO BLOCKING DETAIL P <br /> FIRE STOPPING, ETC, ONSITE IN WATERPROOF POUCHES FOR THE INSPECTING AUTHORITY FOR THEIR REVIEW, URINAL FT 2" 1-1/2" 1/2" - W/4' LAGS FOR WOOD <br /> LAV 2" 1-1/2" 1/2" 1/2" #exl-J'SM SCREW FOR STEEL <br /> PLUMBING CONTRACTOR SHALL SUBMIT 7 SETS OF SUBMITTALS FOR REVIEW AND COMMENT BY THE ENGINEER AND ARCHITECT BAR SINK 2" 1-1/2" 1/2" 1/2" <br /> OF RECORD FOR THE FIXTURES LISTED AND THE MATERIAL TO BE USED AND INSTALLED ON THIS PROJECT AND SHALL MAKE CLASSROOM SINK 2" 1-1/2" 1/2" 1/2" BLOCKING AS <br /> THE APPROPRIATE CHANGES AS DIRECTED BY THE ENGINEER AND ARCHITECT AT NO ADDITI❑NAL COST TO THE OWNER, KITCHEN SINK 2" 1-1/2" 1/2" 1/2" REQUIRED <br /> MOP SINK 3" 2" 3/4" 3/4" <br /> MATERIALS: TRAP PRIMER - - 1/2" - VREFEFR <br /> OPENING IN ROOF <br /> COLD AND HOT WATER FD -2" 2" 1-1/2" - - UM 2" LARGER THAN PIPE <br /> TYPE 'L' COPPER ABOVE GROUND AND TYPE 'K' BELOW, FURNISH SHUTOFF VALVES WHERE SHOWN, SHUT OFF VALVES FD -3" 3" 2" - - / TO STRUCTURAL/ARCG DWGS <br /> SHALL BE BALL TYPE WITH TEFL❑N SEATS, STAINLESS STEEL BALL, AND DOUBLE ❑-RING STEM 1/4 TURN, VALVES T❑ BE 18 GA PIPE BRACE / ENING IS LARGER THAN s"� <br /> RATED F❑R W❑G SERVICE, PR❑VIDE DIELECTRIC UNIONS AT ALL DISSIMILAR METAL CONNECTIONS, INSULATE H❑T WATER FLOOR SINK 2" 2" 1-1/2" - - WITHIN 24" ❑F R❑❑F FOR FLOOR SINKS LOCATED <br /> FLOOR SINK 3" 3" 1-1/2" DECK 2 REQUIREDUP THROUGH FS-1 UNDER WORK CABINETS <br /> SUPPLY AND RETURN LINES W/1" FIBERGLASS ASJ MEETING THE REQUIREMENTS ❑F T-24 MANDATORY FEATURES - <br /> SHOWER- RES. 2" 1-1/2" 1/2" 1/2" V-a" <br /> SCH 40 CPUC BELOW GRADE OUTSIDE, SIZE AS INDICATED ❑N THE DRAWINGS, CONTRACTOR SHALL COORDINATE HIS WORK EYEWASH 2" 1-1/2" 1/2" - PIPE CLAM 2• EQUIPMENT BASE TO BE <br /> WITH OTHER TRADES, CONTRACTOR SHALL DISINFECT WATER LINES PER AWA GUIDELINES AND PR❑VIDE THREE COPIES FROM /SINK <br /> HED AROUND FLOOR PLUMBING DETAILS AND <br /> AN INDEPENDENT TEST LAB, WATER SHALL BE TESTED FOR WATER BORNE BACTERIUM, SPORIDIUM AND OTHER PATHOGENS AT VENT FLASHING 7 SEE PLAN FOR GRATE NOTES <br /> THE TIME OF OCCUPANCY AND CERTIFY THE SYSTEM PASSED THESE TESTS. DETAIL PD ARRANGEMENT <br /> TYPICAL FLOOR SINK <br /> TEST WATER LINES AT 1.5 TIMES WORKING PRESSURE FOR LEAKS, NOT TO EXCEED 100 PSIG. HOLD PRESSURE FOR 24 HOURS, w/DOME STRAINER <br /> STRUCTURAL SUPPORT REQUIREMENTS PLAN VIEW <br /> SEWER AND RWL'S - ABS PIPE AND FITTINGS ABOVE AND BELOW GRADE, CI PIPE WITH ESCUTCHEONS WHERE PROHIBITED BY AND THE USE OF DOWELS SHALL BE <br /> CODE AND THE LOCAL JURISDICTI❑N, CLEAN❑UTS SHALL BE PROVIDED EVERY 100 FT AND AT EACH CHANGE OF DIRECTI❑N DETERMINED BY STRUCTURAL ENGINEER MIN. 1" AIR GAP REMOV. GRATE FOR <br /> GREATER THAT 902, USE OF ABS PIPE IS LIMITED TO BUILDINGS 2 OR LESS ST❑RIES IN HEIGHT AND CANNOT BE USED AND/OR U.T. REPRESENTIVE BEFORE FLOOR DRAIN STRAINER TO TO FLOOR SINK ACCESS TO CLEAN CONAL <br /> " STARTING WORK IN EXISTING SLABS TOP RIM DOME STRAINER �S FiL <br /> WITHIN FIRE RATED ASSEMBLIES, ALL SEWER LINES SHALL BE SLOPED AT A MINIMUM OF 1/4 PER 1 , BE FLUSH WITH NEW FINISHED FLOOR G G p c, <br /> CORE EXISTING CONCRETE FLOOR AREA. MATCH EXISTING 6 H EQUIP.— qL <br /> VENT LINES - SEE SEWER LINES. AND REMOVE AREA OF FLOOR AS FLOOR FINISH. BASE' <br /> REQUIRED TO ACCOMMODATE THE FLUSHED WITH FLOOR a <br /> INSTALLATION OF NEW FLOOR DRAIN SLOPE NEW FINISHED G.C. TO GROUT I <br /> HVAC CONDENSATE DRAIN LINES - TYPE 'M' COPPER PIPE AND FITTINGS INSIDE BUILDING AND SCH 40 PVC PIPE OUTSIDE GAP BETWEEN SINK * NO. M29759J.• <br /> SPECIFIED. REPLACE/PATCH FLOOR FLOOR AREA AROUND & FLOOR U) REN. 6-30-16 <br /> BUILDING, PROVIDE CLEANOUT AT EACH CHANGE OF DIRECTI❑N AND AT C❑IL C❑NNECTI❑N, SLOPE LINES AT 1/8" PER 1', CONSTRUCTION WITH 5000 FLOOR DRAIN. SECTION v <br /> PSI NON-SHRINK CONCRETE. <br /> TEST SS AND RWL DRAIN LINES PER SECTI❑N 723,1 AND 1106,22 RESPECTIVELY, TEST CONDENSATE DRAIN LINES USING 3 F OF- <br /> GAS. <br /> � <br /> SECTION 1106,2,2 a o a FS - 1 MOUNTING <br /> GAS <br /> EXISTING o o DETAIL PO <br /> 5 PSI SERVICE - 2-1/2" AND SMALLER SHALL BE SCH 40 GI SCREWED PIPE AND FITTINGS, 3" AND LARGER SHALL BE SCH /NEW o <br /> 40 WELDED PIPE AND FITTINGS, EXPOSED PIPE SHALL BE GALVANIZED. BURIED PIPE SHALL BE COVERED WITH X-TRU STRUCTURE/ a <br /> COAT, ALL PIPE INSIDE BUILDING SHALL BE WELDED, SLAB. <br /> o, o <br /> 7" WC SERVICE - SCH 40 GALVANIZED IR❑N PIPE AND FITTINGS OUTSIDE BUILDING AND SCH 40 BLACK IR❑N PIPE INSIDEDRAIN FLANGE. <br /> BUILDING, PAINT WHERE EXPOSED T❑ INTERIOR FINISHES, APPLY W/ BRUSH A CONT. TRAP-PRIMER SUPPLY, REV.# DATE ISSUED DESCRIPTION <br /> COAT OF EPDXY BONDING SEE NOTE NO. 1. <br /> AGENT, (EPO BOND) ALL 1/2" BALL VALVE <br /> TEST 7-11" WC GAS AND LPG LINES USING AIR AT 15 PSIG. OBSERVE FOR 24 HOURS FOR LEAKAGE. TEST ALL GAS LINES AROUND PERIMETER OF CORE AD-1 <br /> WITH HIGHER PRESSURES THAN 11" WC AT 1.5 TIMES WORKING PRESSURE, MINIMUM PRESSURE OF 50 PSIG. HOLD TEST FOR 24 AND BODY OF DRAIN ASSEMBLY. / 12x12 MIN <br /> v <br /> HOURS. UNDER DECK-CLAMP, <br /> SEE NOTE NO. 2. I TRAP PRIMER FITTING <br /> FIXTURES NOTES: WHERE REQUIRED I I I 2-4 FLOOR DRAINS <br /> ROUGH IN ALL ACCESSIBLE FIXTURES PER THE DETAILS FOUND IN CBC CHAPTER 11, THE ARCHITECTURAL DRAWINGS AND 1. FOR TRAP-PRIMER REQUIREMENTS I LUPPORT AT THIS POINT <br /> LOCAL CODE REQUIREMENTS, NOTIFY ARCHITECT IN WRITING OF CONFLICTS, REF. PLAN DWG,S AND SPECIFICATIONS. ` � I WHEN PIPE IS SUSPENDED 3/8" CU LINES <br /> SUBMITTALS 2 ON TIDE HIN SLABRDECK CLAMP TOINSTALLATIONS \� FI TRAP PRIMER <br /> DEEP SEAL FITTING ❑N FD-1 <br /> PROVIDE SEVEN SETS OF SUBMITTALS FOR REVIEW, OF 5" OR LESS. SECURE CLAMP PROVIDE "P" TRAP. APEX PROJECT-15-11 <br /> TO DRAIN, REF. SPECIFICATIONS. SUPPORT <br /> INSTALLATI❑N FOR TRAP TRAP PRIMER <br /> 3. NO-HUB FOR ABOVE GRADE 4 <br /> BRACE ALL PIPE AND DUCT SYSTEMS PER SMACNA SEISMIC RESTRAINT GUIDELINES INCLUDING CHANGES OF DIRECTI❑N AND INSTALLATION ONLY DETAIL P DATE: 2-15-2016 <br /> CHANGES IN ELEVATI❑N OF MORE THAN 10', <br /> CPVC INSTALLATI❑N FD-2 INSTALLATI❑N 8 <br /> INSTALLATI❑N OF CPVC FOR NEW AND REPLACEMENT SYSTEMS MUST COMPLY WITH THE REQUIREMENTS AS STATED IN CHAPTER DETAIL PQ <br /> 6 AND INSTALLATION STANDARDS IAPM❑ IS-20-2005, ALL PROCEDURES MUST BE FOLLOWED FOR FLUSHING AND WORKER GDMD ENGINEERING, INC <br /> SAFETY MEASURES, INCLUDED ARE THE PENALTIES AS STATED ON CHAPTER 6 (g), ANY CONTRACTOR OR SUBCONTRACTOR Mechanical and Safety Engineers <br /> FOUND TO HAVE FAILED TO COMPLY WITH THE VENTILATI❑N GLOVE OR FLUSHING REQUIREMENTS OF SECTION 1,2,2 OF <br /> PO <br /> APPENDIX I OF THIS CODE, INSTALLATI❑N STANDARDS FOR CPVC SOLVENT CEMENT HOT AND COLD WATER DISTRIBUTI❑N 212 W Pine St, Ste 4 <br /> SYSTEMS, IAPM❑ IS-20-2005 SHALL BE SUBJECT TO THE PENALTIES ON HEALTH AND SAFETY CODE, DIVISI❑N 13, PART 15 Lodi, Ca 95242 <br /> CHAPTER 6 SECTI❑N 17995, <br /> Ph 209-367-0899 <br /> IN ADDITI❑N IF DURING THE CONDUCT OF ANY BUILDING INSPECTI❑N, THE BUILDING OFFICIAL FINDS THAT THE VENTILATI❑N Fax 209-367-0898 <br /> AND GLOVE REQUIREMENTS OF SECTI❑N 12,2 OF APPENDIX I OF THIS CODE, SPECIAL REQUIREMENTS FOR CPVC INSTALLATI❑N E-mail:gdmdengrinc@sbcglobal.net Copyright APEX <br /> WITHIN RESIDENTIAL BUILDINGS ARE BEING VIOLATED, BUILDING OFFICIAL SHALL CITE THE CONTRACTOR OR SUBCONTRACTOR <br /> FOR THE VIOLATI❑N UNDER THE CALIFORNIA PLUMBING CODE, <br />