My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014430
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9650
>
2600 - Land Use Program
>
PA-2100230
>
SU0014430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 12:57:35 PM
Creation date
11/22/2021 9:00:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014430
PE
2625
FACILITY_NAME
PA-2100230
STREET_NUMBER
9650
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209-
APN
07202056
ENTERED_DATE
9/28/2021 12:00:00 AM
SITE_LOCATION
9650 N THORNTON RD
RECEIVED_DATE
11/16/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Plan ReviewTeann PGEPLa R.-A.4pq— <br /> E'fectric Company vW M.N-. <br /> November 17,2021 <br /> Alisa Goulart <br /> County of San Joaquin <br /> 1810 E Hazelton Avenue <br /> Stockton,CA 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Alisa Goulart, <br /> Thank you for submitting the 9650 N Thornton Road Improvements plans for our review. PG&E <br /> will review the submitted plans in relationship to any existing Gas and Electric facilities within <br /> the project area. If the proposed project is adjacentlor within PG&E owned property and/or <br /> easements,we will be working with you to ensure compatible uses and activities near our <br /> facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities(Attachment 1) <br /> and Electric facilities(Attachment 2). Please review these in detail,as it is critical to ensure <br /> your safety and to protect PG&E's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 1. This plan review process does not replace the application process for PG&E gas or <br /> electric service your project may require. For these requests,please continue to work <br /> with PG&E Service Planning:hftps://www.age.com/en US/business/services/building- <br /> a n d.renova tion/overviewlove ryiew.pa oe. <br /> 2. If the project being submitted is part of a larger project,please include the entire scope <br /> of your project,and notjust a portion of it. PG&E's facilities are to be incorporated within <br /> any CEQA document.PG&E needs to verify that the CEQA document will identify any <br /> required future PG&E services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size,scope,and location of the project and as it relates to any rearrangement or new <br /> installation of PG&E facilities. <br /> Any proposed uses within the PG&E fee strip and/or easement,may include a California Public <br /> Utility Commission(CPUC)Section 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement.PG&E will advise if the <br /> necessity to incorporate a CPUC Section 851 filing is required. <br /> This letter does not constitute PG&E's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PG&E will provide a project speck response as required. <br /> Sincerely, <br /> Plan Review Team <br /> PG&E Gas and Electric Facilities Page 1 <br /> PA-2100230— Informational Letters 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.