My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014430
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9650
>
2600 - Land Use Program
>
PA-2100230
>
SU0014430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 12:57:35 PM
Creation date
11/22/2021 9:00:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014430
PE
2625
FACILITY_NAME
PA-2100230
STREET_NUMBER
9650
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209-
APN
07202056
ENTERED_DATE
9/28/2021 12:00:00 AM
SITE_LOCATION
9650 N THORNTON RD
RECEIVED_DATE
11/16/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific rCo aura_ <br /> Ellectric Company <br /> Attachment 1—Gas Facilities <br /> There could be gas transmission pipelines in this area which would be considered critical <br /> facilities for PG&E and a high priority subsurface installation under California law.Care must be <br /> taken to ensure safety and accessibility.So,please ensure that if PG&E approves work near <br /> gas transmission pipelines it is done in adherence with the below stipulations. Additionally,the <br /> following link provides additional information regarding legal requirements under California <br /> excavation laws: https:/lvAvw.usanorth8il,orglimages/pdfs/CA-LAW-2018.pdf <br /> 1. Standby Inspection:A PG&E Gas Transmission Standby Inspector must be present <br /> during any demolition or construction activity that comes within 10 feet of the gas pipeline.This <br /> includes all grading,trenching,substructure depth verifications(potholes),asphalt or concrete <br /> demolition/removal,removal of trees,signs,light poles,etc.This inspection can be coordinated <br /> through the Underground Service Alert(USA)service at 811.A minimum notice of 48 hours is <br /> required.Ensure the USA markings and notifications are maintained throughout the duration of <br /> your work. <br /> 2. Access:At any time,PG&E may need to access,excavate,and perform work on the gas <br /> pipeline.Any construction equipment,materials,or spoils may need to be removed upon notice. <br /> Any temporary construction fencing installed within PG&E's easement would also need to be <br /> capable of being removed at any time upon notice.Any plans to cut temporary slopes <br /> exceeding a 1:4 grade within 10 feet of a gas transmission pipeline need to be approved by <br /> PG&E Pipeline Services in writing PRIOR to performing the work. <br /> 3. Wheel Loads:To prevent damage to the buried gas pipeline,there are weight limits that <br /> must be enforced whenever any equipment gets within 10 feet of traversing the pipe. <br /> Ensure a list of the axle weights of all equipment being used is available for PG&E's Standby <br /> Inspector.To confirm the depth of cover,the pipeline may need to be potholed by hand in a few <br /> areas. <br /> Due to the complex variability of tracked equipment,vibratory compaction equipment,and <br /> cranes,PG&E must evaluate those items on a case-by-case basis prior to use over the gas <br /> pipeline(provide a list of any proposed equipment of this type noting model numbers and <br /> specific attachments). <br /> No equipment may be set up over the gas pipeline while operating.Ensure crane outriggers are <br /> at least 10 feet from the centerline of the gas pipeline.Transport trucks must not be parked over <br /> the gas pipeline while being loaded or unloaded. <br /> 4. Grading:PG&E requires a minimum of 36 inches of cover over gas pipelines(or existing <br /> grade if less)and a maximum of 7 feet of cover at all locations.The graded surface cannot <br /> exceed a cross slope of 1:4. <br /> 5. Excavating:Any digging within 2 feet of a gas pipeline must be dug by hand.Note that <br /> while the minimum clearance is only 12 inches,any excavation work within 24 inches of the <br /> edge of a pipeline must be done with hand tools.So to avoid having to dig a trench entirely with <br /> hand tools,the edge of the trench must be over 24 inches away.(Doing the math for a 24 inch <br /> PG&E Gas and Electric Facilities Page 3 <br /> PA-2100230—Informational Letters 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.