Laserfiche WebLink
Workrder Details �- <br /> 6581979: Regulatory SPCC Weekly Diesel Tank Inspection <br /> This completed work order record must be filed into the facility regulatory recordkeeping binder and maintained for at least 3 years. <br /> Asset: TESTK-8402 Standby Generator Diesel Fuel Tank No. 2 <br /> Location: TES Tesla Treatment Facility <br /> 9000 West Vernalis Road Tracy, CA. 95377 <br /> CI: <br /> Sched Start: Site: WS Shop: WSEBFFO <br /> Sched Finish: Priority: 6 Supervisor: <br /> Target Start: 10/2/20 Work Type: PM Lead: <br /> Actual Start: PM Number: WS-TES-TNK-0021 Job Plan: WS-FUL-TNK-INP-12-001 <br /> Actual Finish: Status: APPR JP Description: 1-Month Inspection of the Diesel <br /> Tanks per SPCCP requirements for 40 <br /> CFR §112.7 & 112.8 <br /> Report Date: 9/29/20 Parent: Crew: F2-B <br /> Reported By: FSTARR Failure Class: Service: <br /> On Behalf Of: Problem Code: Service Group: <br /> Phone: 415-310-0085 GL Account: 25940-232425-10000-10029996+0016 Classification: <br /> .. Plan Description <br /> wosequence Task IDs <br /> Measurement <br /> Sequence Task ID Description Status Point Value Date Observa <br /> 0 10 WEEK ONE (1) INSPECTION: 1. Inspect storage tanks, valves, piping APPR 0 <br /> and all appurtenances to assess general condition. <br /> 2. Clean any oil residual from piping, valves and connections. <br /> Dispose of oily rags into the ap�fopriate metal containers in the <br /> hazmat storage area. ./// <br /> 3. Dewater sump and containment as needed. All water must be <br /> checked prior to being pumped to ensure that no oil is being <br /> discharged into the environment. This is a regulatory issue that <br /> must be documented and recorded after every event. <br /> 4. Check containment and sump. Verify that containment is free of <br /> any crac s, concrete spalling and corrosion. Clean as needed. <br /> 5. Verify that tank support structure is free of cracksar}d corrosion. <br /> Check condition of grounding cable and straps. � <br /> 6. Verify that tank foundation is free of any cracks, corrosion and <br /> that all grouting is intact. Check condition of anchoring fasteners. <br /> October 1, 2020 at 3:02:22 PM PDT 113 / 169 <br />