My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
229
>
1600 - Food Program
>
PR0160836
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 8:22:19 AM
Creation date
12/9/2021 7:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0160836
PE
1632
FACILITY_ID
FA0000786
FACILITY_NAME
GOSPEL RESCUE MISSION CAFETERI
STREET_NUMBER
229
Direction
E
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906619
CURRENT_STATUS
01
SITE_LOCATION
229 E CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Indoor Lighting Indoor Lighting Indoor Lighting ri <br /> NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> This document is used to demonstrate compliance with requirements in 110.9 §110.12(c), 130.0 130.1 140.6 and§141.0(b)2 for indoor lighting scopes using the prescriptive Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 2 of 8) Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 3 of 8) <br /> path. Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 <br /> Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 1 of 8) WMB A , ■ ^ <br /> Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 V\y/�\`//� '�,.-{J <br /> C.COMPLIANCE RESULTS F.INDOOR LIGHTING FIXTURE SCHEDULE <br /> A.GENERAL INFORMATION If any cell on this table says"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. SURFACE DOWNLIGHT ARCHITECTS <br /> C No No 13 CEC Default 2 No 26 ❑ ❑ <br /> 01 Project Location(city) STOCKTON 04 Total Conditioned Floor Area(ft') 1,403 Allowed Lighting Power per§140.6(b) (Watts) Adjusted Lighting Power per§140.6(a) (Watts) Compliance Results POLYCARBONATE <br /> z Lighting in 01 02 03 04 05 06 07 08 09 D 2X4 720OLM FLAT PANEL No No 66 CEC Default 6 No 396 ❑ ❑ <br /> 02 Climate Zone 12 OS Total Unconditioned Floor Area(ft ) 0 conditioned and TROFFER <br /> 03 Occupancy Types Within Project(select all that apply): 06 #of Stories(Habitable Above Grade) 1unconditioned <br /> Area Adjustments <br /> Total Designed Watts:CONDITIONED SPACES 1,172 <br /> ElOffice I❑lRetaill I❑ ❑ ❑ ❑ Complete Area Category Tailored <br /> Warehouse Hotel/Motel School <br /> Support Areas spaces must not be Total > Total PAF Lighting Total Adjusted i o <br /> Building Category Additional §140.6(c)3 = Designed Control Credits = Watts 05 must be>=08 FOOTNOTE:Design Watts for small aperture and color changing luminaires which qualify per§140.6(a)4B is adjusted to be 75%of their rated wattage.Table F automatically makes 5757 Pacific Avenue <br /> combined forAllowed (Watts),E] Parking Garage ❑ High Rise Residential ❑ Relocatable Healthcare ® Other(Write in) Grocery 140.6 c 1 §140.6(c)2 §140.6(c)2G + Watts * this adjustment the permit applicant enterfull rated wattage in column 05. <br /> compliance per �- ( ) (Watts) (Watts) 140.6 a 2 Includes 140.6 1 P PP f 9 <br /> §140.6(b)l (+) (-) Adjustments zAuthority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per 130.0 c Wattage used must be the maximum rated for the luminaire,not Suite 226 <br /> B.PROJECT SCOPE <br /> (See Table I) (See Table I) (See Table J) (See Table K) (See Table F) (See Table P) the lamp. Stockton, CA 95207 <br /> This table includes any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in 140.6 or Conditioned 1,332.85 = 1,332.85 > 1,172 0 = 1172 COMPLIES <br /> §141.0(b12 for alterations. Unconditioned = > = G.MODULAR LIGHTING SYSTEMS <br /> Scope of Work Conditioned Spaces Unconditioned Spaces Controls Compliance(See Table H for Details) COMPLIES This section does not apply to this project. 2000 L Street <br /> 01 02 03 04 05 Rated Power Reduction Compliance(See Table Q for Details) Suite 125 <br /> My Project Consists of(check all that apply): Calculation Method Area(ft2) Calculation Method Area(ft2) H.INDOOR LIGHTING CONTROLS(Not including PAFs) Sacramento, CA 95811 <br /> ® New Lighting System Complete Building Method 1403 Complete Building Method 0 D.EXCEPTIONAL CONDITIONS This table includes lighting controls for conditioned and unconditioned spaces.When a control having a*is shown,the notes section of this table provides more detail on how <br /> compliance is achieved.The lighting controls section of the Compliance Summary Table on the first page will show"DOES NOT COMPLY"if the notes are left blank. <br /> El New Lighting System-Parking Garage This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. <br /> Total Area of Work(ft2) 1403 0 Building Level Controls T 209.944.9110 <br /> E.ADDITIONAL REMARKS 01 02 ns F 209.944.5711 <br /> Field Inspector <br /> This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Mandatory Demand Response§110.12(c) Shut-off controls§130.1(c) Pass Fail www.wmbarchitects.com <br /> F.INDOOR LIGHTING FIXTURE SCHEDULE Not Required<=10,000 SF See Area/Space Level Controls ❑ ❑ <br /> This table includes all permanent designed lighting and all portable lighting in offices. <br /> Designed Wattage:Conditioned Spaces HCS. <br /> 01 02 03 04 05 06 07 08 09 10 <br /> Name or Item Complete Luminaire Modular Small Aperture& Watts per How is Wattage Total Number Excluded per Design Watts Engineering <br /> Field Inspector <br /> n <br /> Tag Description (Track)Fixture Color Changer luminaire' determined of Luminaires §140.6(a)3 Pass Fail <br /> 50 years <br /> A 4'SURFACE LED WRAP 4800 No No 45 CEC Default 12 No 540 ❑ ❑ �512 Feather River Dr#F,Stockton,CA 95219 <br /> B 4'SURFACE LED WRAP 4000L No No 1 35 1 CEC Default 1 6 1 No 1 210 ❑ ❑ <br /> 209-478-8270 1 www.hcs-eng.com <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft <br /> ®Richard C.Smith,PE richard@hcs-eng.com <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 ❑Bhupendra Patel,PE bhupendra@hcs-eng.cOm <br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 ❑Fizabeth Aguilar dizabeth@hcs-eng.com <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA PROJECT#2020.265 <br /> Indoor Lighting Indoor Lighting Indoor Lighting <br /> NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCCATI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 4 of 8) Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 5 of 8) Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 6 of 8) Gospel Center Rescue <br /> Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 Mission Kitchen <br /> H.INDOOR LIGHTING CONTROLS(Not including PAFs) I.LIGHTING POWER ALLOWANCE:COMPLETE BUILDING OR AREA CATEGORY METHODS Q.RATED POWER REDUCTION COMPLIANCE FOR ALTERATIONS Remodel <br /> Area Level Controls Each area complying using the Complete Building or Area Category Methods per 140.6 b are included in this table.Column 06 indicates if additional lighting power allowances per This section does not apply to this project. 445 S Sall Joaquin St. <br /> 04 OS 06 07 08 09 10 11 12 J14fl.6Lcl or adjustments per 140.6 Uo are being used. Stockton, CA 95203 <br /> Conditioned Spaces R.80%LIGHTING POWER FOR ALL ALTERATIONS-CONTROLS EXCEPTIONS <br /> Primary/Sky 01 02 03 04 05 06 This section does notaPP Y to project. <br /> I this <br /> Complete Building or Area Multi-Level Secondary Interlocked p ject. <br /> Area Controls Shut-Off Controls lit Field Inspector <br /> Area Description Category Primary Function Controls Daylighting Systems Complete Building or Area Category Primary Allowed Density Allowed Wattage Additional Allowance/Adjustment <br /> 130.1 a 130.1 c Daylighting Area Description Z Area(ftz) <br /> Area 130.1 b §130.1(d) 140.6 d 140.6 a 1 Function Area (W/ft ) (Watts) Area Category PAF S.DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR(PAF) <br /> Pass Fail Whole Building Grocery Store Building 0.95 1,403 1,332.85 No No This section does not apply to this project. <br /> COVERED ENTRY All Others Buildings Manual Exempt* Occupancy Sensor N/A N/A No ❑ ❑ TOTALS: 1,403 1,332.85 See Tables J,or P for detail <br /> ON/OFF T.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION <br /> Manual J.ADDITIONAL ALLOWANCE:AREA CATEGORY METHOD QUALIFYING LIGHTING SYSTEM Selections have been made based on information provided in this document.I an selection have been changed b INDOOR LIGHTING <br /> SERVING/PREP All Others Buildings Dimmer Occupancy Sensor N/A N/A No ❑ ❑ f p f y g y permit applicant an explanation should be included in Table E. <br /> ON/OFF This section does not apply to this project. Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at <br /> STORAGE All Others Buildings Manual Exempt* Occupancy Sensor N/A N/A No ❑ ❑ https://www.energy.ca.gov/title24/2019standards/2019-compliance_documents/Nonresidential Documents/NRCl/ COMPLIANCE <br /> ON/OFF K.TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE Field Inspector <br /> Manual Yes No Form/Title <br /> HALLWAY All Others Buildings ON/OFF Exempt* Occupancy Sensor N/A N/A No El El This section does not apply to this project. Pass Fail <br /> • 0 NRCI-LTI-01-E-Must be submitted for all buildings ❑ ❑ <br /> Manual • O NRCI-LTI-02-E-Must be submitted for a lighting control system,or for an Energy Management Control System(EMCS),to be El El <br /> KITCHEN All Others Buildings ON/OFF Dimmer Occupancy Sensor N/A N/A No ❑ ❑ L.ADDITIONAL LIGHTING ALLOWANCE:TAILORED WALL DISPLAY <br /> recognized for compliance. <br /> * * This section does not I to this project.NOTES:Controls with a require a note h the space below explaining how compliance is achieved. 13 apply p J NRCI-LTI-04-E-Must be submitted for two interlocked systems serving an auditorium,a convention center,a conference room,a <br /> EX:Conference 1:Primary/Skylight Daylighting:Exempt because less than 120 watts of general lighting;EXCEPTION 1 � • El El(d12 <br /> to§130.1Plan Sheet Showing Daylit Zones: M.ADDITIONAL LIGHTING ALLOWANCE:TAILORED FLOOR AND TASK LIGHTING multipurpose room or a theater to be recognized for compliance. <br /> Q • NRCI-LTI-05-E-Must be submitted for a Power Adjustment Factor(PAF)to be recognized for compliance. El El <br /> COVERED ENTRY <100 SQ FT This section does not apply to this project. <br /> 0 • NRCI-LTI-06-E-Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance. ❑ ❑ <br /> STORAGE <100 SQ FT E1.1 <br /> N.ADDITIONAL LIGHTING ALLOWANCE:TAILORED ORNAMENTAL/SPECIAL EFFECTS QR�FESS/pN <br /> 9� <br /> This section does not apply to this project. R� C. <br /> HALLWAY <100 SQ FT S�/may GZ <br /> O.ADDITIONAL LIGHTING ALLOWANCE:TAILORED VERY VALUABLE MERCHANDISE <br /> No. E14303 rr, <br /> This section does not apply to this project. Exp. 6-30-21 <br /> P.POWER ADJUSTMENT:LIGHTING CONTROL CREDIT(POWER ADJUSTMENT FACTOR(PAF)) 9T<6 TR)GPS�Q <br /> This section does not apply to this project. FOF CA0 <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 <br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Indoor Lighting Indoor Lighting <br /> NRCCATi-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E <br /> Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 7 of 8) Project Name: WMB GOSPEL CENTER RESCUE KITCHEN Report Page: (Page 8 of 8) <br /> Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 Project Address: 445 S.SAN JOAQUIN ST.Date Prepared: 11/30/2020 <br /> PUBLISH HISTORY: <br /> U.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 0 DATE PURPOSE <br /> Selections have been made based on information provided in this document.If any selection have been changed by the permit applicant,an explanation should be included in Table E. I certify that this Certificate of Compliance documentation is accurate and complete. No. <br /> Additional Remarks.These documents must be provided to the building inspector during construction and any with"-A"in the form name must be completed through an Acceptance Documentation Author Name: Documentation Author Signature: Q 2/16/21 PLAN CHECK <br /> Test Technician Certification Provider(ATTCP).For more information visit:http://www.energy.ca.gov/title24/attcp/providers.html HCS Engineering,Inc. <br /> Yes No Form/Title Field Inspector company: Signature Date: <br /> Pass Fail HCS Engineering,Inc. 2020-11-30 <br /> • O NRCA-LTI-02-A-Must be submitted for occupancy sensors and automatic time switch controls. ❑ ❑ Address: CEA/HERS Certification Identification(if applicable): <br /> 4512 Feather River Dr.#F 560B-6AFl-DO2E-7612-C480-OOB1-A979-939A-BDBE-Dl4D-ALBA-8678-8C76-EE8C-A49E- <br /> O • NRCA-LTI-03-A-Must be submitted for automatic daylight controls. ❑ ❑ ABF2 <br /> O • NRCA-LTI-04-A-Must be submitted for demand responsive lighting controls. ❑ ❑ city/state/zip: Phone: <br /> Q 1 • NRCA-LTI-05-A.-Must be submitted for institutional tuning power adjustment factor(PAF) ❑ ❑ Stockton CA 95219 209 478-8270 <br /> RESPONSIBLE PERSON'S DECLARATION STATEMENT <br /> I certify the following under penalty of perjury,under the laws of the State of California: <br /> 1. The information provided on this Certificate of Compliance is true and correct. <br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible designer) <br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements <br /> of Title 24,Part 1 and Part 6 of the California Code of Regulations. <br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations, <br /> plans and specifications submitted to the enforcement agency for approval with this building permit application. <br /> 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable <br /> inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. <br /> Responsible Designer Name: Responsible Designer Signature: <br /> 7 <br /> Richard Smith,PE E14303 <br /> Company: Date Signed: <br /> HCS Engineering,Inc 2020-11-30 <br /> Address: License: <br /> 4512 Feather River or#F Electrical Engineering <br /> City/State/Zip: Phone: <br /> Stockton CA 95219 209-478-8270 <br /> WMB PROJECT: <br /> 20-042 <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-30 09:20:48 <br /> Schema Version:rev 20190401 Schema Version:rev 20190401 <br /> ET24 <br /> 9/16/2020 2:00:42 PM Copyright WMB,Inc. <br /> FILE: K:\2020\301-400\wmb gospel kitchen\ET24.dwg Mar 05, 2021 - 2:12pm richard <br />
The URL can be used to link to this page
Your browser does not support the video tag.