My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
** PLEASE CHECK LOOKUP - if good, then Approve QCStatus, else update with correct RECORD_ID (8)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
3550
>
4200 – Liquid Waste Program
>
PR0505453
>
** PLEASE CHECK LOOKUP - if good, then Approve QCStatus, else update with correct RECORD_ID (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 12:25:45 PM
Creation date
12/10/2021 12:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
PR0505453
PE
4242
FACILITY_ID
FA0006451
FACILITY_NAME
OPEN AIR MALL
STREET_NUMBER
3550
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13207012
CURRENT_STATUS
01
SITE_LOCATION
3550 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOTO- <br />el'o-Hoo <br />PLUMBING, BRAINS <br />& WATER CLEANUP <br />Roto -Rooter Plumbers Division of RotoCo., Inc. Remit to: 2141 Industrial Ct., Ste.D • Vista, CA 92081 (800) 491-7686 <br />BILL TO Accounts Receivable (844) 490-7686 • Fax: (760) 598-1657 Lic# 422155 • Federal ID #: 46-1617768 <br />Stockton Open Air Mall <br />3550 North Wilson Way <br />Stockton, CA 95205 USA <br />DESCRIPTION OF WORK <br />Upon arrival met with Ron on site, gave estimate to perform diagnostic testing on all three sump pump stations, found pump <br />station #1 in need of 2 five amp Glass fuses, one hard starter contactor, one alternating relay switch, one effluent sump <br />pump, and high alarm bulb kit. <br />Pump station #2 in need of two hard starting contactors, one alternating relay, 2 5 amp Glass fuses, and one higher alarm <br />light bulb kit. <br />Pump station #3 in need of two 5 amp glass fuses and one high alarm bulb kit. <br />If pump station #3 doesn't work once fuses are installed additional estimate will be given for repairs needed. <br />Estimate excepted by Ron on site. <br />Ordered and installed new effluent sump pump and pump station #1 pump #2. <br />Installed both five amp micro glass fuses and one hard starter contactor, and one alternating relay switch, did not locate high <br />alarm light bulb, explained to Ron on site he will get bulb himself. <br />Tested pump station number one operating fine at this time. <br />Removed and replaced both hard starter contactors and pump station #2 and one alternating relay as well as both five amp <br />micro glass fuses. <br />Pump station #2 operating fine at this time. <br />Pump station #3 installed both five amp micro fuses board lit up and pumps worked as well as contactors. <br />All sump pump stations are working at this time. <br />Spoke to Ron on site. Customer is a billing account. <br />SEND COPY TO EMAIL ADDRESS - @openairmall@hotmail.com <br />INVOICE • <br />6584? 10"D • <br />1 O B ADDRESS <br />Completed Date: 11/18/2021 <br />Stockton Open Air Mall <br />Technician: Brandon Filbert <br />3550 North Wilson Way <br />Technician: Gabriel Rivera <br />Stockton, CA 95205 USA <br />Technician: Mauro Gonzales Sr. <br />Payment Term: Due Upon Receipt <br />Due Date: 11/18/2021 <br />DESCRIPTION OF WORK <br />Upon arrival met with Ron on site, gave estimate to perform diagnostic testing on all three sump pump stations, found pump <br />station #1 in need of 2 five amp Glass fuses, one hard starter contactor, one alternating relay switch, one effluent sump <br />pump, and high alarm bulb kit. <br />Pump station #2 in need of two hard starting contactors, one alternating relay, 2 5 amp Glass fuses, and one higher alarm <br />light bulb kit. <br />Pump station #3 in need of two 5 amp glass fuses and one high alarm bulb kit. <br />If pump station #3 doesn't work once fuses are installed additional estimate will be given for repairs needed. <br />Estimate excepted by Ron on site. <br />Ordered and installed new effluent sump pump and pump station #1 pump #2. <br />Installed both five amp micro glass fuses and one hard starter contactor, and one alternating relay switch, did not locate high <br />alarm light bulb, explained to Ron on site he will get bulb himself. <br />Tested pump station number one operating fine at this time. <br />Removed and replaced both hard starter contactors and pump station #2 and one alternating relay as well as both five amp <br />micro glass fuses. <br />Pump station #2 operating fine at this time. <br />Pump station #3 installed both five amp micro fuses board lit up and pumps worked as well as contactors. <br />All sump pump stations are working at this time. <br />Spoke to Ron on site. Customer is a billing account. <br />SEND COPY TO EMAIL ADDRESS - @openairmall@hotmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.