My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:54:23 PM
Creation date
12/16/2021 11:31:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
[REV] MAY & JULY 2014 RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-6 <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - MayJuly 2014 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\rcsi 2014\text\revision track_july 2014\sec <br />3_revtr.doc <br />inadvertently accepted at the facility. The Contingency Plan is available upon request. <br />The volume of traffic at the RRF, including the Compost Facility, cannot exceed 620 vehicles <br />per day, which includes all traffic associated with the landfill operation. Based on maximum <br />RRF and compost operations, the traffic would increase but under no circumstances will the <br />operator allow the maximum traffic volume to exceed 620 vehicles per day. <br />Material unloading areas were designed so that the northwest prevailing winds direct any <br />windblown particles into the material stockpile or perimeter site fencing, rather than away <br />from it. Facility staff regularly inspect and remove any windblown litter. <br />3.4.2 Material Preparation <br />An integral part of composting operations is the grinding of incoming green and wood waste <br />materials for size reduction. An operator is stationed by the equipment during all material <br />grinding to ensure that the operation is conducted in a controlled and safe manner. The <br />grinding is conducted in the green and wood waste grinding area, as shown on Figure 2. <br />Facility grinders are equipped with locking controls to prevent unauthorized use. Material <br />preparation/processing activities are not necessary for the biosolids. <br />3.4.3 Cleaning <br />Compost Facility staff inspect the site on a daily basis to remove any windblown litter. All <br />trucks must be tarped entering and exiting the facility (also tarped during transportation of <br />waste). Incoming loads are only allowed to untarp and tarp at the active unloading area. <br />This policy will be strictly enforced. An ongoing daily litter collection program to minimize <br />litter in areas surrounding the landfill property including the RRF and compost operation. <br />Landfill personnel regularly patrol the landfill property perimeter and pick up litter blown <br />from the working areas on a daily basis. If additional assistance is required beyond site <br />personnel, temporary laborers are hired. The personnel should not only collect litter from <br />the facility, but also the facility entrance, public roads, and adjoining propert y, provided the <br />property owner will allow access. Litter is collected as far north as the intersection of Austin <br />Road and Arch Road, and as far south as French Camp Road and Austin Road on a daily <br />basis. All litter is collected along this section of the road. Litter caught on the fences is <br />removed daily or as necessary. The Forward Landfill implemented a Litter Management <br />Plan (LMP) (Forward Inc., 2012), to further reduce litter at the site. The processing area, <br />including the interior of the tub grinder, is cleaned daily at the end of each shift. <br />General cleaning of the Compost Facility pad, outdoor operations and storage areas is <br />accomplished by permanent employee duty assignments with daily inspections to assure <br />compliance. <br />Loose materials and litter cleanup is accomplished by permanent employee duty <br />assignments augmented with temporary personnel as needed. D aily inspections are <br />conducted to maintain compliance. <br />3.4.4 Load Checking <br />As also discussed in Section 3.4.1, incoming loads are inspected upon entrance at the <br />facility in accordance with the Load Checking Program., which is included in the landfill’s <br />JTD. Load checks of feedstocks are performed at the material sorting area as required by <br />14 CCR, Section 17867(a)(3). In addition, incoming loads are also checked for hazardous or <br />prohibited materials at the facility. The number of load checks performed and loads
The URL can be used to link to this page
Your browser does not support the video tag.