My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:05:46 AM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2020
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LCRS Design - Area 26 <br />Foothill Sanitary Landfill <br />design leachate generation rate by a factor greater than 2 while limiting the hydraulic head on <br />the liner to well under 12 inches (less than the thickness of a GDN). GDN design calculations are <br />discussed in Section 5 of this report. <br />The County has indicated to GLA that they may, at some point in the future, pursue approval <br />for an increased final filling elevation at the FSLF. As such, GLA has analyzed the required GDN <br />transmissivity for waste fills up to 300 feet thick. If the County does anticipate waste filling to <br />300 feet of thickness the minimum 100-hour transmissivity of the GDN should be 3.5x10-4 mz/s <br />at a vertical stress of 25,000 psf, and no testing should be required at 11,000 psf vertical stress. <br />The minimum 100-hour transmissivity at 1,000 psf vertical stress remains the same. <br />Blanket drainage layer model output and calculations are provided in Attachments 1 and 2 of <br />this report. <br />3.2 Side-Slope LCRS <br />Similar to previous module designs, the side-slope LCRS drainage layer was designed with a <br />relatively steep inclination as compared to the floor of the area. Specifically, Area 2B will have a <br />minimum slope of 33.3% (3H:1V) to the base LCRS. The side-slope LCRS will be comprised of <br />double-sided GDN draining to collector pipes at the toe of the slopes. <br />Blanket drainage layer calculations are provided in Attachment 2 of this report. <br />3.3 LCRS Collection Pipe <br />Perforated HDPE leachate collection pipes will be placed within a gravel wrap located in a <br />trench below the GDN and will run along the floor of Area 2B to convey leachate to the LCRS <br />sump. The LCRS pipe network consists of 6-inch diameter lateral pipes and 6-inch diameter <br />header pipes. All piping is capable of conveying more than two times the predicted peak daily <br />flow of leachate. All LCRS collection pipes will be rated SDR 9. Calculations for flow capacity and <br />pipe strength are included in Attachment 3 of this report. <br />3.4 LCRS Sump <br />Area 2B was designed with a single sump located in near the southeastern side of the cell. The <br />sump has approximate dimensions of 70 feet x 70 feet x 4 feet deep, and will be filled with <br />granular material. The sump was designed to accommodate only leachate from Area 2B. The <br />design is similar to that used on Area 2A as designed by Geosyntec. <br />A primary sump with risers will include two 24-inch diameter HDPE pipes, one as a primary <br />access pipe and another as a secondary access pipe, along with 6-inch-diameter <br />instrumentation pipes for each access pipe. A permanent submersible pump will be installed in <br />the primary riser pipe to pump out leachate. To allow for the removal of the pump without <br />removing the instrumentation or sensor, instrumentation pipes will be included next to each <br />sump riser (i.e. the primary and the secondary). Underneath the primary sump, a secondary <br />sump with 12-inch diameter HDPE pipe and riser and 6-inch-diameter instrumentation pipe will <br />be installed. A temporary submersible pump will periodically be lowered into the secondary <br />sump to check for liquid. <br />Project No. AU 17.1254 1 LCRS Design 3 <br />May 2018 <br />