Laserfiche WebLink
Fourth Quarter 1 <br />Structure Monitoring for Landfill Gas Results <br />Foothill Sanitary Landfill <br />Monitoring Date: October 5, 2017 Monitoring Technician: M. Palis <br />N:\1 Foothill\LFG Migration Monitoring\2017\4th Qtr\ <br />FH 4th Qtr LFG Perim Mig Monit 2017 Structures <br />Carbon <br />Balance <br />Methane <br />Dioxide <br />Oxygen <br />Gas <br />Building and Monitoring Location <br />Note <br />(% by vol) (% <br />by vol) <br />(% by vol) <br />(% by vol) <br />Maintenance Building (Electrical Conduit) <br />0.0 <br />0.0 <br />20.7 <br />79.3 <br />Maintenance Building (Interior) <br />0.0 <br />0.0 <br />20.7 <br />79.3 <br />Managers Residence (Electrical) <br />0.0 <br />0.0 <br />21.0 <br />79.0 <br />Managers Residence (Interior) <br />0.0 <br />0.0 <br />20.9 <br />79.1 Vacant now <br />Managers Residence Crawl Space <br />0.0 <br />0.0 <br />20.8 <br />79.2 <br />Scalehouse (Electrical Conduit) <br />0.0 <br />0.1 <br />21.1 <br />78.8 <br />Scalehouse (Interior) <br />0.0 <br />0.1 <br />21.1 <br />78.8 <br />* Compliance Level: <br />Methane gas to be less thanl.25 percent by volume. <br />N:\1 Foothill\LFG Migration Monitoring\2017\4th Qtr\ <br />FH 4th Qtr LFG Perim Mig Monit 2017 Structures <br />