My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1965-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_1965-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:20 AM
Creation date
12/20/2021 12:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1965-1989
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well 3, (MW -3) located along the east side of the landfill near <br />MW -2, (see Figure 2) was constructed on April 28, 1988. MW -3 was <br />constructed in a 50 -foot -deep boring as follows: <br />o Screen Section - 50 to 40 feet <br />o Sand Pack - 50 to 35 feet <br />No bentonite seal was placed in MW -3 because bentonite pellets were not <br />available onsite at the time this well was constructed. This well was <br />later removed and the boring backfilled with grout. <br />4.3 MONITORING WELL ABANDONMENT <br />Hydro -Search decided to abandon the three monitoring wells shortly after <br />their installation 'because no fluids or saturated sediments were <br />encountered. <br />On April 28, 1988, prior to construction of MW -3, Hydro -Search's geologist <br />used a 1/2 inch diameter bailer to check for the presence of fluids in <br />B-1, MW -1, and MW -2. No free fluids were detected. This information was <br />communicated to Hydro -Search's Reno office for evaluation while MW -3 was <br />being constructed. After MW -3 was constructed, Hydro -Search's field <br />Is 104-88-683 6 <br />Adilk Aft� IF <br />W 114V <br />k'q KLEINFELDER <br />Hydro -Search had intended <br />to place the grout seal after <br />all the monitoring <br />wells installed. <br />This step was not required because <br />MW -1 and all other <br />monitoring wells were <br />removed and the borings backfilled <br />with grout. <br />Monitoring Well 2, <br />(MW -2) constructed on April 27, 1988, <br />was located along <br />,the east side of <br />the landfill (see Figure 2). MW -2 was constructed in a <br />20 -foot -deep boring <br />as follows: <br />o Screen Section <br />- 20 to 10 feet <br />o Sand Pack <br />- 20 to 8 feet <br />o Bentonite Seal <br />- 8 to 5 feet <br />This well was later <br />removed and the boring backfilled with grout. <br />Monitoring Well 3, (MW -3) located along the east side of the landfill near <br />MW -2, (see Figure 2) was constructed on April 28, 1988. MW -3 was <br />constructed in a 50 -foot -deep boring as follows: <br />o Screen Section - 50 to 40 feet <br />o Sand Pack - 50 to 35 feet <br />No bentonite seal was placed in MW -3 because bentonite pellets were not <br />available onsite at the time this well was constructed. This well was <br />later removed and the boring backfilled with grout. <br />4.3 MONITORING WELL ABANDONMENT <br />Hydro -Search decided to abandon the three monitoring wells shortly after <br />their installation 'because no fluids or saturated sediments were <br />encountered. <br />On April 28, 1988, prior to construction of MW -3, Hydro -Search's geologist <br />used a 1/2 inch diameter bailer to check for the presence of fluids in <br />B-1, MW -1, and MW -2. No free fluids were detected. This information was <br />communicated to Hydro -Search's Reno office for evaluation while MW -3 was <br />being constructed. After MW -3 was constructed, Hydro -Search's field <br />Is 104-88-683 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.