My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515788
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:05:04 AM
Creation date
12/22/2021 9:47:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0515788
PE
2832
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14749 North Thornton Road PR0515788 <br /> December 20, 2021 Program: APSA <br /> PHOTO 1: SPCC plan states concrete building provides secondary containment for oil tanks. <br /> TABLE 8 <br /> y List of AST Containers <br /> THREE B'S TRUCK&AUTO PLAZA <br /> 14749 North Thornton Road,Lodi,California <br /> Type Capacity Discharge Prevention <br /> YP <br /> �"k Location (Construction (gallons) Content & <br /> Standartl Containment <br /> Double-wall <br /> Tank Farm Horizontal AST 20,000 Diesel construction,liquid level <br /> (UL142) au a concrete berm <br /> Double-wall <br /> 2Tank Farm Horizontal AST 20,000 Diesel construction,liquid level <br /> (UL142) au a concrete berm <br /> Double-wall <br /> 3 Tank Farm Horizontal AST 5,000 Gasoline construction,liquid level <br /> (UL142) au a concrete berm <br /> Double-wall <br /> Horizontal AST <br /> 4 Tank Farm (UL142) 5,000 Gasoline construction,liquid level <br /> au a concrete berm <br /> Double-wall <br /> 5 Tank Farm Horizontal AST 10,000 Gasoline construction,liquid level <br /> (UL142) au a concrete berm <br /> Double-wall <br /> 8 Inside Tire Horizontal AST 1 000 Waste Oil construction,land- <br /> Repair Shop (UL142) based spill response, <br /> --- concrete buildin <br /> Inside Tire Horizontal AST New Motor Liquid level gauge,land <br /> Oil -based spill response, <br /> Repair Shop (UL142) concrete buildin <br /> Inside Tire Horizontal AST New Motor Liquid level gauge,land <br /> Oil -bas <br /> Repair Shop (UL142) ed retspille resp <br /> conconse, <br /> j buildin <br /> Inside Tire Horizontal AST New Motor Liquid level gauge,land <br /> g 280 -based spill response, <br /> Repair Shop (UL142) Oil concrete buildin <br /> Inside Tire Horizontal AST New Motor Liquid level gauge,land <br /> 10 280 Oil -based spill response, <br /> Repair Shop (UL142) concrete buildin <br /> Liquid level gauge, <br /> 11 Inside Tire Horizontal AST 280 New Motor land-based spill <br /> Repair Shop (UL142) Oil response,concrete <br /> buildin <br /> Inside Tire Horizontal AST New Motor Liquid level gauge,land <br /> 12 150 -based spill response, <br /> Repair Shop (UL142) Oil concrete buildin <br /> _ Inside Tire Land-based spill <br /> Repair Tire <br /> Steel Drums 55 Various response,concrete <br /> p p buildin <br /> Lydia Baker, SR. REHS Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.