Laserfiche WebLink
21790(bx8)(B) <br /> Hydrogeology 21750(g)- 21600(b)(4)(A) RWD-1988 SEC.2595 <br /> (g)(7)(D) . <br /> Land/Water Use 21750(h)-(h)(5) 21600(b)(4)(A) RWD-1988 SEC.2595 <br /> re%)(4): <br /> 21600(b)(3)(E) <br /> Preliminary closure plan 21750(i) RWD-1988 SEC.2595 <br /> 021760. SWRCB-Design Report and Operations Plan. <br /> Design Report 0 preliminary and as-built plans 21760(a)(1) RWD-1988 SEC.2596 <br /> Design Report 21760(a)(3)-(a)(4) RWD-1988 SEC.2596 <br /> Operation Plan 21760(b)-(b)(3) RWD-1988 SEC.2596 <br /> Subchapter 4. Development of Closure/Post-Closure Maintenance Plans <br /> 021769. SWRCB-Closure and Post-Closure Maintenance Plan Requirements. <br /> Prelim.Cl/P-CI Plan 0 purpose 21769(b)(1) RWD-1988 SEC.2596 <br /> Prelim.CUP-Cl Plan Contents 0 cost analysis 21769(b)(2)- RWD-1988 SEC.2596 <br /> (b)(2)(13)5. <br /> Final Cl/P-CI Plan 21769(c)- RWD-1988 SEC.2596 <br /> (c)(2)(H)3- <br /> Chapter 5. Enforcement <br /> Article 4. Enforcement by Regional Water Quality Control Board(RWQCB) ** <br /> k <br /> 022190. SWRCB-Mandatory Closure(Cease and Desist 22190(b) If early closure mandated: <br /> Orders). <br /> Chapter 6. Financial Assurances at Solid Waste Facilities and at Waste Management <br /> Units for Solid Waste <br /> Subchapter 2. Financial Assurance Requirements <br /> Article 1. Financial Assurance for Closure <br /> 022207. SWRCB-Closure Funding Requirements. 22207(a) RWD-1988 SEC.2596 <br /> Article 2. Financial Assurance for Postclosure Maintenance <br /> 022212. SWRCB-Post-Closure Funding Requirements. 22212(a) RWD-1988 SEC.2596 <br /> Article 4. Financial Assurance Requirements for Corrective Action <br /> 022222. SWRCB-Corrective Action Funding Requirements. 22222 RWD-1988 SEC.2596 <br />