Laserfiche WebLink
Pqu1N <br />t< <br />� THOMAS R. FLINN <br />c `4 <br />DIRECTOR <br />4�/FpR� <br />THOMAS M. GAU <br />DEPUTY DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />BENTON ANGOVE <br />BUSINESS ADMINISTRATOR <br />March 22, 2005 <br />Mr. Rupi Gill, Supervising Engineer <br />San Joaquin Valley Unified Air Pollution Control District <br />4230 Kiernan Avenue, Suite 130 <br />Modesto, California 95356-9322 <br />11 <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201-3018 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.co.san-joaquinxa.us <br />I� 5 <br />SUBJECT: APPLICATION FOR AUTHORITY TO CONSTRUCT A LFG SYSTEM AT THE <br />FOOTHILL SANITARY LANDFILL, SJUAPCD PERMIT N-4070 <br />Dear Mr. Gill: <br />The Foothill Sanitary Landfill is subject to 40 CFR, 60 Part WWW (Standards of Performance for Municipal <br />Solid Waste Landfills), due to the calculated emissions of NMOCs exceeding 50 Mg/yr due to refuse placed in <br />2004, per our letter to the District on January 25, 2005. Enclosed, please find the application package for a <br />LFG collection system at the Foothill Sanitary Landfill in compliance with these requirements. This package <br />includes: <br />• Application form <br />• Supplemental application form for flares <br />• Supplemental information <br />• LFG Collection and Control System Design Plan, pursuant to 40 CFR, Section 60.752(B)(2)(i) <br />• Proposed Permit conditions, submitted for your consideration. We understand that this can be useful <br />to District permitting engineers. I have sent this document by email for ease of editing <br />• A check in the amount of $120.00 for filing fees. Sixty dollars to be applied to this application, the <br />remaining $60.00 to be applied to the other application being submitted for the North County <br />Recycling Center and Sanitary Landfill <br />As you know, these regulations require that a LFG system be installed within 30 months of this determination, <br />or by June 2007. We plan to install the system by the end of the construction season in 2006 to address the <br />groundwater impact concerns. <br />If you have any questions or concerns, please call me at 468-8504. <br />Sincerely, <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:sc <br />NAI Foothill\SitctmpProj06\LFGSystXPermitApplsjuapcdO6-PermitApp.doc <br />Enclosures <br />c: Regional Administrator's Office, US EPA Region IX <br />75 Hawthorne Street, San Francisco, California 94501 <br />LA 31210 <br />