Laserfiche WebLink
0 <br />51. JTD, Appendix I, p.5, section 2.3.3: The "Construction Quality Assurance" section does not address the <br />requirements in T27CCR 21790(b)(8)(C), T27CCR 20323 and T27CCR 20324. <br />Text has been added indicating that third -party certification will be provided. An <br />estimated cost for Construction Quality Assurance is shown on Appendix I, Table 2-3. <br />JTD, Appendix I, p.7, section 2.3.7: This section does not describe how often the leachate volume will be <br />measured or describe the reporting requirements. Pursuant to T27CCR 20340(h). <br />A brief description of these features, as they may exist at closure, has been added. An <br />estimated cost for Construction Quality Assurance is shown on Appendix I, Table 2-3. <br />Also see Item 47. <br />52. JTD, Appendix I, p.8, section 3.2: This section does not address the number of years of postclosure <br />monitoring and maintenance required by T27CCR 21180(a). <br />Text explicitly identifying a 30 -year postclosure period has been added, supplementing <br />the note at the bottom of Appendix I, Table 3-1. <br />53. JTD, Appendix I, p.8, section 3.2: This section does not address postclosure monitoring and maintenance of <br />the site security systems as required by T27CCR 21180(a)(1). <br />The referenced section addresses closure activities that will be addressed in the Final <br />Closure Plan in the year 2055 (approximately). In the Preliminary Closure Plan, we <br />include an approximate cost for these activities (Appendix I, Table 3-1). <br />54. JTD, Appendix I, Appendix A, Site Development Plan: Appendix A does not show the fifteen foot wide <br />benches required for every fifty feet of vertical height. Pursuant to T27CCR 21790(b)(8)(B), T27CCR <br />21140(b) and T27CCR 21090(a). <br />See Item 50. <br />55. JTD, Appendix I, Appendix C, Landfill Gas Collection and Monitoring System: Section four, "Landfill <br />Gas Migration and Monitoring Probes," requires more detail. This section does not describe the depth of the <br />probes, the monitoring frequency, type of gas sampled, well construction, structure monitoring, corrective <br />action, or EA reporting. Pursuant to T27CCR 20925-20937. <br />The Methane Monitoring Plan, containing this information, has been added as <br />Appendix P. <br />56. JTD, Appendix M: The volumetric capacity calculations do not include the amount of capacity consumed by <br />liner construction, intermediate cover and final cover, as required by T27CCR 21600(b)(3)(B). <br />For the purposes of calculating site life, the volumetric capacity of the landfill (including <br />refuse, daily cover, and intermediate cover) is the volume between two surfaces: The <br />top of the operations layer over the LCRS, and the underside of the closure cap. <br />This volume excludes the LCRS and operations layer at the base of the landfill and the <br />closure cap at the final landfill surface. Calculation of capacity consumed by the closure <br />cap is reflected in the final page of Appendix M and in Table 3-1. We think it important <br />to note that the base of the landfill, shown in the Preliminary Closure Plan, is conceptual <br />in nature, and subject to revision based on further engineering studies. The volume <br />associated with the uncertainty in the landfill base is much greater than the volume <br />associated with the LCRS and operations layer. <br />Notes Regarding Comments 6 San Joaquin County DPW/Solid Waste <br />Foothill JTD October 14, 2005 <br />