My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2005-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:54 AM
Creation date
12/30/2021 9:47:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2006
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adak 0 <br />U WOOD BROS <br />INC <br />rA <br />GENERAL ENGINEERING CO®,NTRACTOR• <br />Post Office Box 218 • 14147 18th Ave. Lemoore, CA 93245 • (559) 924-7715 (559) 924-4595 • License # 558257 <br />October 5, 2006 <br />Mr. Frank Dell Era <br />Foothill Sanitary Landfill <br />6484 N. Waverly Road <br />Linden, CA 95236 <br />Dear Mr. Dell Era, <br />Subject: Flare Station Installation <br />Reference: Foothill Sanitary Landfill Site Improvement Project <br />WBI has notified by PEI that the flare station has an expected ship date of <br />November 30, 2006, and an anticipated delivery date during the first week of <br />December. I believe that we can have the flare station fully installed and <br />operational by January 1, 2007. <br />As we currently stand the completed installation will fall outside of our contracted <br />schedule and after the November 31St deadline set by the Regional Water Quality <br />Control Board. As you can see from the accompanying documentation WBI has <br />made every effort to have the flare station onsite and installed by the deadline, <br />even going so far as to order the submittals prior to the start of work (the first <br />contract was June 15th) and before possessing executed contracts. <br />It is our every intent to install the flare station within days of its arrival and <br />acceptance and will update you as to its manufacturing and shipping status. <br />Sincerely, <br />Dennis M. Shamoon <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.