My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014543
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
9296
>
2600 - Land Use Program
>
PA-2100280
>
SU0014543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:19 PM
Creation date
1/3/2022 11:14:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014543
PE
2611
FACILITY_NAME
PA-2100280
STREET_NUMBER
9296
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240-
APN
05112056
ENTERED_DATE
12/7/2021 12:00:00 AM
SITE_LOCATION
9296 E HWY 12
RECEIVED_DATE
12/29/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 SO ( i IuC <br /> S JC0G , Inc . <br /> amppWWT�M. <br /> S, ln In, lplin C'nllnh' :111111i-. rc •iei 1-Libilal C onsel7t /lion & OPell Space Phan <br /> ONO 555 Feist Waller Avenue . Stockton , CA 95202 . ( 209 ) 235- 0600 . FAX ( 209 ) 235- 0438 <br /> • SJMSCP HOLD <br /> • � TO : Local Jurisdiction : Community Development Department Planning Department , Building <br /> Department Engineering Department Survey Department Transportation Department Public <br /> Works Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br /> Species Habitat Conservation and Open Space Plan (SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> t ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> I . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITNIN-Ls . <br /> If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> of signed ITNIMs from project applicant, SJCOG, Inc. staff will sign the I'I'MMs. This is the effective date <br /> of the ITMMs, <br /> 2 . Under no circumstance shall ¢round disturbance occur without compliance and satisfaction of die ITMMs . <br /> 3 . Upon issuance of fully executed I TMMs and prior to any ground disturbance , the project applicant must : <br /> a . Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period); or <br /> b. hay the appropriate SJMSCP fee for the entirety of the project acreage being covered, or <br /> c. Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> d . purchase approved mitigation bank credits. <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> a . Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br /> b. Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called <br /> Project Title : PA-2100280 (SO <br /> s <br /> Landowner : Christopher W. & Diane B Knoll Trust Applicant : Dillon & Murphy <br /> Assessor Parcel #s : 05142046 <br /> T R., Section (s) . <br /> Local Jurisdiction Contact ' Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid In compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.