Laserfiche WebLink
pgU,iN <br /> SAN JOAQUIN COUNTY <br /> DEPARTMENT OF PLANNING AND BUILDING INSPECTION �7 3� Item No. 2 <br /> 1810 F HAZELTON AVE.. STOCKTON, CA 95205 �/�� CHU DAVISSON <br /> PLANNING PHONE: 209/9443722 <br /> S�/F OAS BUILDING PHONES 209/9443701 1 IEAA1'kEA21CA <br /> v <br /> Deputy Duw1w <br /> TOM WALKER <br /> O!puh Diw1r, <br /> July 16 , 1987 ✓ <br /> r• <br /> MEMORANDUM )) <br /> TO : Planning Commission <br /> FROM: Chet Davisson,' birector <br /> SUBJECT: ENVIRONMENTAL IMPACT REPORT NO . ER-86-3 ON THE PROPOSED <br /> TRAINA BROTHERS PROJECT FOR A PUBLIC HEARING TO RECEIVE <br /> COMMENTS ON THE DRAFT ENVIRONMENTAL IMPACT REPORT <br /> (EIR) . THE PROPOSED PROJECT IS A GENERAL PLAN MAP <br /> AMENDMENT TO CHANGE THE LAND USE DESIGNATION ON A <br /> 26-ACRE PARCEL FROM AGRICULTURE TO RURAL RESIDENTIAL . <br /> THE PROJECT IS LOCATED ON THE SOUTH SIDE OF FAIROAKS <br /> ROAD, ADJACENT TO THE VALPICO RURAL RESIDENTIAL AREA, <br /> SOUTHEAST OF TRACY. <br /> ---------------------------------------------------------------- <br /> "'his public hearing on the Traina Brothers Draft EIR h&3 bee.i <br /> scheduled to receive public comments on the Draft EIR. Comments <br /> received at this hearing will be addressed by the EIR consultant <br /> and incorporated into the Final EIR. It is also appropriate to <br /> receive comments from the Planning Commission on the draft docu- <br /> ment . <br /> The 45-day review period for the Draft EIR is June 10 through <br /> July 24 , 1987 . Planning Commissioners received copies of the <br /> Draft EIR on June 9 , 1987 . Copies have also been distributed to <br /> public agencies and interested parties. Public review copies are <br /> available at the Planning Division and the Tracy Public Library. <br /> Written comments will be accepted until July 24, 1987 . <br /> A summary of the major impacts and mitigation measures , a brief <br /> project description, and a location map are attached for your <br /> review. <br /> Following the end of the Draft EIR review period, the Final EIR <br /> will be prepared by Earth Metrics, the County ' s EIR consultant . <br /> The Final EIR will then be forwarded to the Board of Supervisors <br /> for certification. The Board will also consider the General Plan <br /> Amendment at that time. <br /> Attachments <br /> CD/BB/blm <br />