Laserfiche WebLink
TRAINA BROTHERS PROJECT <br /> PROJECT SUMMARY <br /> PROJECT DESCRIPTION: <br /> The proposed Traina Brothers General Plan Amendment would change the <br /> Land Use Circulation Element map from Agriculture to Rural Residential <br /> for a 26-acre parcel located on the south side of Fairoaks Road, adja- <br /> cent to the existing Valpico Rural Residential Area. The underlying <br /> project is a 14-lot rural residential subdivision under the RR-65 <br /> (Rural Residential ; 65 , 000-square-foot minimum lot size) zoning <br /> classification. <br /> The EIR also addresses the cumulative effects of the conversion of <br /> adjacent land from Agriculture to Rural Residential . The study area <br /> comprises 384 acres and is bounded by Valpico Road, Chrisman Road, <br /> Linne Road, and MacArthur Drive . <br /> MAJOR IMPACTS AND MITIGATION MEASURES : <br /> Impacts : Mitigation Measures : <br /> The proposed project would con- As part of the County General Plan <br /> tribute to the incompatibility Update program, techniques should be <br /> of residential and agricultural identified to actively protect <br /> land uses . similar agricultural land in areas <br /> not yet developed in a mix of agri- <br /> cultural and residential uses . <br /> The proposed project is incon- As part of the County General Plan <br /> sistent with the County' s Update program, the role of Rural <br /> intent for Rural Residential Residential development in the <br /> development . County should be reevaluated and <br /> precisely defined. <br /> The proposed project would con- In order to minimize nuisance <br /> tribute to the incompatibility conflicts, setback and buffer areas <br /> of residential and agricultural should be included as conditions of <br /> land uses. approval for Rural Residential sub- <br /> divisions adjacent to agricultural <br /> operations . <br /> Development of the project site Soil percolation tests should be <br /> and study area would result in conducted on every lot within the <br /> an incremental decrease in project area to ensure adequate sep- <br /> groundwater quality and tic suitability. <br /> quantity. <br /> Detailed groundwater testing should <br /> be conducted on the project site <br /> prior to water well implementation, <br /> with special concern for TCE and <br /> nitrate contamination. <br /> Project Summary - 1 - (ER-86-3 ) <br />