My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:51 AM
Creation date
1/4/2022 2:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2004
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Analysis in Support of the <br /> Use of Crushed Rock in LCRS Drainage Layer <br /> Module 1, Foothill Sanitary Landfill <br /> San Joaquin County, California <br /> 1.0-Introduction <br /> San Joaquin County is seeking approval from the CVRWQCB for substituting a crushed rock <br /> drainage layer in place of the rounded gravel. Crushed rock with a uniform size of 'h inch is <br /> proposed to be used for the LCRS drainage layer. This design will provide drainage <br /> characteristics equivalent to the gravel layer. To provide protection against puncture of the <br /> 60-mil HDPE gdomembrane from the crushed rock, a geotextile cushion layer will be placed <br /> directly above the geomembrane before placing the crushed rock. <br /> The construction documents for the LCRS drainage layer within Module 1 of the <br /> Foothill Sanitary Landfill specify rounded or sub-rounded gravel placed directly over the 60-mil <br /> high density polyethylene (HDPE) geomembrane liner. During the design of Module 1, it was <br /> envisioned that on-site gravel deposits would be mined and screened to provide the rounded <br /> gravel. However, subsequent subsurface investigation and testing of the on-site gravel deposits <br /> determined that the on-site gravel is significantly larger in size than that required by the <br /> construction specifications. <br /> The use of the crushed rock and the geotextile cushion result in the following two design <br /> requirements that need to be addressed: " <br /> 3. The minimum mass per unit area (oz/yd2 or g/m2) of the geotextile cushion required to <br /> protect the geomembrane from the crushed rock; and <br /> 4. The shear strength of the interface between the geotextile cushion and the 60-mil HDPE <br /> geomembrane should be adequate for slope stability of Module 1. <br /> This report addresses the above design requirements. The calculations provided below <br /> determine the mass of the geotextile cushion required to protect the geomembrane from the <br /> N:\sacDP\2003\Prj\83\835608.3ap.doc <br /> (FSL) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.