Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS 9 <br /> FOR FOOTHILL SANITARY LANDFILL <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> C. RECEIVING WATER LIMITATIONS <br /> Water Quality Protection Standards <br /> The concentrations of Constituents of Concern in waters passing through the Points of <br /> Compliance shall not exceed the Concentration Limits established pursuant to <br /> Monitoring and Reporting Program No. _, which is attached to and made part of <br /> this Order. <br /> D. PROVISIONS <br /> 1. The Discharger shall comply with the Standard Provisions and Reporting <br /> Requirements, dated September 1993, which are hereby incorporated into this <br /> Order. The Standard Provisions and Reporting Requirements contain important <br /> provisions and requirements with which the Discharger must comply. A violation <br /> of any of the Standard Provisions and Reporting Requirements is a violation of <br /> these waste discharge requirements. <br /> 2. The Discharger shall comply with all applicable provisions of 23 CCR Chapter 15 <br /> and 40 CFR Part 258 that are not specifically referred to in this Order. <br /> 3. The Discharger shall comply with Monitoring and Reporting Program No. 94- <br /> which is attached to and made part of this Order. This compliance <br /> includes, but is not limited to, maintenance of waste containment facilities and <br /> precipitation and drainage controls and monitoring ground water, leachate from the <br /> landfill units, the vadose zone and surface waters, throughout the active life of the <br /> waste management units and the post-closure maintenance period. A violation of <br /> Monitoring and Reporting Program No. 94- is a violation of these waste <br /> discharge requirements. <br /> 4. The Discharger shall maintain legible records of the volume and type of each <br /> waste discharged to each module and the manner and location of discharge. Such <br /> records shall be maintained at the facility until the beginning of the post-closure <br /> maintenance period. These records shall be available for review by representatives <br /> of the Board and of the State Water Resources Control Board at any time during <br /> normal business hours. At the beginning of the post-closure maintenance period, <br /> copies of these records shall be sent to the Regional Board. <br /> 5. The Discharger shall provide proof to the Board within sixty days after <br /> completing the final closure that the deed to the landfill facility property, or some <br />