My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:13 AM
Creation date
1/4/2022 2:21:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007-2009
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The LFG well will be connected to the existing LFG header through pipes <br />installed on the surface in the landfill (Figures 2 and 3). Each well will be <br />provided with an adjustment valve and a sampling port. <br />A boring log will be compiled during the drilling of the well. <br />Safety <br />Cal OSHA safety standards will be followed during the drilling process. <br />Personnel working near the construction area will be required to wear hard hats, <br />safety glasses and safety vests. All personnel will be advised to avoid contact <br />with refuse when possible. <br />Schedule <br />Construction will require access to be provided for the drill rig, including <br />relocating stormwater down drains. Installation of the well may start <br />approximately 45 days after approval of this Plan. <br />An Authority to Construct may be required by the San Joaquin Valley Unified Air <br />Pollution Control District. If so, review and granting this Authority may require 60 <br />days. <br />It is anticipated that the well will be drilled one day, and the casing and other <br />materials installed the next day. <br />N:\1 Foothill\GX-10 June 07\RemedGX-10 5-18-07.doc <br />Remediation Plan - LFG Well Installation Solid Waste/Public Works <br />Foothill Sanitary Landfill Page 3 of 3 San Joaquin County — May 24, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.