My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
845
>
2200 - Hazardous Waste Program
>
PR0513936
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:03:08 AM
Creation date
1/5/2022 10:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513936
PE
2228
FACILITY_ID
FA0003984
FACILITY_NAME
PEP BOYS #0710
STREET_NUMBER
845
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734514
CURRENT_STATUS
01
SITE_LOCATION
845 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
om <br />nIIIIIIIIIIII <br />OVERALL SH IPPNG DIMENSION: 5'-8' L X 3'-10' W X 5'-2' H <br />2'-6' <br />20, --i <br />1 d— I <br />2 3 <br />1 <br />6.. <br />lal0 <br />SIZE <br />SUGGESTED FUNCTION <br />5" -0 - <br />REM <br />SIZE <br />SUGGESTED FUNCTION <br />1 <br />2' <br />SPARE <br />2 <br />2- <br />FILL <br />3 <br />1/2" <br />DRAIN FOR SPILLBOX <br />4 <br />7 GAL. <br />SPILLBOX, DWG.-SB8002' <br />5 <br />2' <br />PRIMARY TANK WORKING VENT <br />8 <br />2' <br />MECHANICAL GAUGE SPARE <br />7 <br />4' <br />PRIMARY TANK EMERGENCY VENT <br />8 <br />SMALL <br />LIFTING LUG <br />9 <br />4- <br />SECONDARY CONTAINMENT EMERGENCY VENT <br />10 <br />2- <br />SECONDARY MONITOR PORT <br />11 <br />2- <br />SECONDARY WORKING VENT <br />i IANK 51'LUtIG1IM <br />�• VENTING CAPACITY. PRIMARY TANK -84,200 CUBIC FEET PER HOUR <br />SECONDARY TANK - 105,000 CUBIC FEET PER HOUR <br />MATERIAL PRIMARY TANK - 10 GA. <br />SECONDARY TANK - 10 GA. <br />3" <br />3 <br />� 3mm <br />a <br />■1■ <br />mo <br />PRODUCT CODE GALLONS DESCRIPTION OVERALL SIZE SHIP WT. va <br />w1 <br />lCAA1480D5001 480 UL -142 DOUBLE WALL LUBE CUBE TANK W/SPILLBOX 5'-8' L X 3'-10' w X 4'-1' H 1350 lBS O NTAI N M E N <br />OLUTIONS <br />THIS DRAWING AND DESIGN SHOWN HEREIN IS THE PROPFRTY OF CDNTAINMENT SOLUTIONS. USE OR COPES THEREOF CANNOT BE MADE WITHOUT WRITTEN CONSENT. <br />" CUSIOYER NAME DRAWN BY: D. ROYANG DATE DRAWN: 45-01-09 " <br />PPAOVED BY: DATE: DWG NUMBER: 5100116 SCALE: 1:32 <br />REM:REV BY: 2 1 DATE: I I SHEET:1 OF I <br />Figure 5 - Waste Coolant Tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.