My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:43:43 AM
Creation date
1/6/2022 8:40:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Gage <br /> Tank ID 87 91 /Diesel <br /> Tank Manufacturer Modern Welding Modern Welding <br /> Tank Capacity 20,000 20,000 <br /> Test Start Time 9:00 am 9:00 am <br /> Initial Reading 7 Hg 7 Hg <br /> Test End Time 10:00 am 10:00 am <br /> Final Reading 7 Hg 7 Hg <br /> Change in Reading o 0 <br /> Pass/Fail Criteria o 0 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used:Pressure Gage <br /> Pipe Run ID 87 East 87 West 91 East 91 West <br /> Pipe Manufacturer Western Fiberglass Western Fierglass Western Fiberglass Western Fiberglass <br /> Test Start Time N/A N/A N/A N/A <br /> Initial Reading N/A N/A N/A N/A <br /> Test End Time N/A N/A N/A N/A <br /> Final Reading N/A N/A N/A N/A <br /> Change in Reading N/A N/A N/A N/A <br /> Pass/Fail Criteria o 0 0 0 <br /> Tightness Test Results ❑ Pass 0 Fail ❑ Pass 0 Fail ❑ Pass 0 Fail ❑ Pass 0 Fail <br /> Pipe Run ID Diesel East Diesel West 87 Vent 91 Vent <br /> Pipe Manufacturer Western Fiberglass Western Fiberglass Ameron Ameron <br /> Test Start Time N/A N/A 10:30 am 10:30 am <br /> Initial Reading N/A N/A 5 psi 5 psi <br /> Test End Time N/A N/A 11:30 am 11:30 am <br /> Final Reading N/A N/A 5 psi 5 psi <br /> Change in Reading N/A N/A 0 0 <br /> Pass/Fail Criteria o 0 0 0 <br /> Tightness Test Results ❑ Pass 0 Fail ❑ Pass 0 Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.