Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87 STP 91 STP Diesel STP 87 FILL <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 81" 801, 80" 83" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 13" 14" 14" 36" <br /> (inches) <br /> Test Start Time 12:23 pm 9:56 am 12:11 pm 11:33 am <br /> Initial Reading 3.1530 4.9510 0.3548 3.6778 <br /> Test End Time 12:38 pm 10:11 am 12:26 pm 11:48 am <br /> Final Reading 3.1529 4.9499 0.3535 3.6771 <br /> Change in Reading 0.0001 0.0011 0.0013 0.0007 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Sump/UDC ID 91 Fill Diesel FILL Vent Box <br /> Sump Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass <br /> Sump Depth (inches) 81.. 81.. 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 34" 36" 8" <br /> (inches) <br /> Test Start Time 12:11 pm 11:33 am 9:56 am <br /> Initial Reading 3.9428 4.6867 6.3392 <br /> Test End Time 12:26 pm 11:48 am 10:11 am <br /> Final Reading 3.9413 4.6858 6.3397 <br /> Change in Reading 0.0011 0.0009 0.0005 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />