Laserfiche WebLink
Martinez, Genesis [EHD] <br /> From: Martinez, Genesis [EHD] <br /> Sent: Tuesday, September 13, 2022 7:38 AM <br /> To: Case Gilson; EH-UST <br /> Cc: Keith Powers; Tyler Olea;Aldo Basurto <br /> Subject: RE: Safeway 2707, 6425 Pacific Ave, Stockton - Secondary Containment 2022 <br /> Hi Case, <br /> Thank you for the email. I will give it to the area inspector. <br /> Thank you, <br /> 6eM,e yi y Marfi+� I Sr. Office Assistant <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Ave. Stockton, CA 95205 <br /> M (209)468-021718 (209) 468-34331 D-� gmartinez@sigov.org <br /> EHD Website: https://www.sigov.org/department/envhealth/ <br /> From: Case Gilson<case@armer-norman.com> <br /> Sent:Tuesday, September 13, 2022 7:28 AM <br /> To: EH-UST<ust@sjgov.org> <br /> Cc: Keith Powers<Keith.Powers@albertsons.com>;Tyler Olea<Tyler.Olea@albertsons.com>; Aldo Basurto <br /> <aldo.basurto@safeway.com> <br /> Subject: Safeway 2707, 6425 Pacific Ave, Stockton-Secondary Containment 2022 <br /> Good day SJCEHD HazMat/UST <br /> I am writing to align on secondary containment status at the subject facility. Recent 36-mo periodic testing <br /> documented "fail" for all secondary piping pressure integrity and UDC hydrostatic integrity but the testing was <br /> attempted with all secondary piping termination boots removed. With the new drip-floor UDC adapter frames at <br /> the site, the UDC necks are now significantly closed and thus the piping termination boots are not accessible <br /> from grade for secondary testing. <br /> To make the UDCs and the secondary piping testable, valved secondary jumpers will be installed for all <br /> termination boots. This configuration allows each UDC to act as "point of earliest detection" containment <br /> structure for the secondary piping and to be "closable" from grade for periodic secondary testing. Test jumper <br /> valve remains open to UDC floor for site operation and is closed only for testing (jumper lead/valve pulled up <br /> to grade via pull cord/leash). Secondary communication will remain testable/provable(from end of piping run <br /> to STP). <br /> I will transmit 48-hour notice of secondary testing as soon as we configure the site(jumper installation) and are <br /> ready to test the site. This will be to satisfy the current 36-mo periodic. <br /> Regards <br /> i <br />