Laserfiche WebLink
<Keith.Powers@albertsons.com>, Tyler Olea <Tyler.OleaAalbertsons.com>, Gabriel Martin <br /><Gabriel.Martin@belshire.com> <br />Writing to submit the report package for secondary testing conducted on October 11, 2022 at Safeway 2707, <br />6425 Pacific Ave in Stockton. <br />This is supplemental/completion testing for the current 36-mo periodic cycle. The 10/11/2022 testing by <br />Armer/Norman is the passing results for the UDCs and secondary piping and the 8/11/2022 testing by Able is <br />the passing results for tank annulars and sumps. <br />Regards <br />Case Gilson <br />Armer/Norman & Associates, Inc. <br />CA License 256896 <br />925/671-9200 - Armer/Norman office <br />925/499-1032 - mobile (text is best) <br />casea,armer-norman.com <br />2